Wed Jan 25 15:41:29 2017, Lydia, Update, IMC, 29.5 MHz modulation depth measurement plan
|
Wed Jan 25 17:30:03 2017, Koji, Update, IMC, 29.5 MHz modulation depth measurement plan
|
Wed Jan 25 19:39:07 2017, gautam , Update, IMC, 29.5 MHz modulation depth measurement plan
|
Fri Jan 27 21:25:11 2017, Lydia, Update, IMC, 29.5 MHz modulation depth
|
Sat Jan 28 01:25:51 2017, gautam, Update, IMC, 29.5 MHz modulation depth 
|
Mon Jan 30 19:07:48 2017, gautam, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 01:07:20 2017, Lydia, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 13:46:34 2017, rana, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 14:17:48 2017, gautam, Update, IMC, RF AM stabilization box pulled out
|
Tue Jan 31 22:07:13 2017, gautam, Update, IMC, RF AM stabilization box revamp
|
Tue Jan 31 22:28:39 2017, Lydia, Update, IMC, RF AM stabilization box pulled out
|
Wed Feb 1 11:51:19 2017, Koji, Update, IMC, RF AM stabilization box pulled out
|
Wed Feb 1 16:45:56 2017, Lydia, Update, IMC, RF AM stabilizer box Modification Plan
|
Wed Feb 1 20:49:34 2017, rana, Update, IMC, RF AM stabilizer box Modification Plan
|
Wed Feb 1 23:13:30 2017, Lydia, Update, IMC, RF AM stabilizer box Modification Plan
|
Sun Feb 5 21:56:50 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Tue Feb 7 12:01:10 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Tue Feb 7 17:00:55 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 02:14:10 2017, gautam, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 11:41:43 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 13:24:28 2017, rana, Update, IMC, 29.5 MHz stabilizer box replacement
|
Fri Feb 10 18:21:21 2017, gautam, Update, IMC, IMC Demod board
|
Fri Feb 10 19:32:15 2017, Koji, Update, IMC, IMC Demod board
|
Sun Feb 12 01:16:57 2017, gautam, Update, IMC, IMC length loop - summary of changes    
|
Mon Feb 13 11:55:14 2017, rana, Update, IMC, IMC length loop - summary of changes
|
Mon Feb 13 13:34:44 2017, gautam, Update, IMC, IMC length loop - bad SMA cable replaced
|
Mon Feb 13 19:44:55 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Mar 1 21:15:40 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Mar 1 23:56:09 2017, gautam, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Thu Mar 2 20:32:18 2017, Lydia, Update, IMC, Front panel for 29.5 MHz amplifier box
|
Wed Feb 15 23:54:13 2017, gautam, Update, IMC, IMC saga continues... 
|
Fri Feb 17 20:10:18 2017, gautam, Update, IMC, WFS servos turned back on
|
Sat Feb 18 14:09:06 2017, rana, Update, IMC, WFS servos turned back on
|
Sat Feb 18 21:50:48 2017, gautam, Update, IMC, WFS servos turned back on
|
Sun Mar 5 12:41:23 2017, gautam, Update, IMC, WFS servo-steppin  
|
|
Message ID: 12771
Entry time: Mon Jan 30 19:07:48 2017
In reply to: 12768
Reply to this: 12772
|
Author: |
gautam |
Type: |
Update |
Category: |
IMC |
Subject: |
RF AM stabilization box pulled out |
|
|
[johannes, gautam]
We pulled out the RF AM stabilization box from the 1X2 rack. PSL shutter was closed, marconi output, RF distribution box and RF AM stabilization box were turned off in that order. We had to remove the 4 rack nut screws on the RF distribution box because of the stiff cables which prevented the RF AM stabilization box extraction. I've left the marconi output and the RF distribution boxes off, and have terminated all open SMA connections with 50 ohm terminators just in case. Rack nuts for RF distribution box have been removed, it is currently sitting on a metal plate that is itself screwed onto the rack. I deemed this a stable enough ledge for the box to sit on in the short run, while we debug the RF AM stabilization box. We will work on the debugging and re-install the box as soon as we are done... |