40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1267     Entry time: Mon Feb 2 19:23:53 2009
Author: Yoichi 
Type: Update 
Category: General 
Subject: New optical layout plan 
The attached is a plan of the optical layout in the central part for the upgrade.
I included, the folded recycling cavities, oplevs for the core optics, POX, POY, POB and video views.
I have not worked out how to handle the beams outside the chambers. It should not be that difficult.
I also did not include beam dumps for unwanted beams.

I used pink for main beams, brown for picked off beams, red for oplevs.

Comments, suggestions are welcome.
Attachment 1: 40mUpgradeOpticalLayoutPlan01.pdf.zip  2.777 MB
ELOG V3.1.3-