Wed Oct 12 22:51:26 2016, Koji, Update, General, Clipping could not be improved by the PZTs - NEED ANOTHER VENT
|
Thu Oct 13 00:23:54 2016, ericq, Update, VAC, Pre-vent prep
|
Thu Oct 13 09:30:38 2016, Steve, Update, General, vent 79 is happening 
|
Thu Oct 13 16:48:34 2016, Steve, Update, VAC, vent 79 is completed
|
Thu Oct 13 19:28:14 2016, gautam, Update, General, in-air alignment
|
Fri Oct 14 10:31:53 2016, gautam, Update, General, doors are off ITMY and BS/PRM chambers
|
Fri Oct 14 18:33:55 2016, gautam, Update, General, AS clipping investigations 7x
|
Mon Oct 17 22:45:16 2016, gautam, Update, General, AS beam centered on all OMs 7x
|
Tue Oct 18 18:56:57 2016, gautam, Update, General, OM5 rotated to bypass OMC, green scatter is from window to PSL table   
|
Wed Oct 19 16:41:55 2016, gautam, Update, General, Heavy doors back on 8x
|
Thu Oct 20 09:17:08 2016, Steve, Update, VAC, Pumpdown 80 has started   
|
Thu Oct 20 15:59:52 2016, Steve, Update, VAC, Pumpdown 80 has completed  
|
Fri Oct 21 02:06:20 2016, gautam, Update, General, IFO recovery
|
Mon Oct 24 11:39:13 2016, gautam, Update, General, ALS recovered 
|
Fri Oct 21 09:28:21 2016, Steve, Update, VAC, Vac Normal reached
|
Wed Nov 23 11:32:13 2016, Steve, Update, VAC, TP3 drypump replaced again
|
Fri Nov 10 08:52:21 2017, Steve, Update, VAC, TP3 drypump replaced
|
Fri Feb 16 15:57:58 2018, Steve, Update, VAC, TP3 drypump replaced
|
Thu Jul 12 16:18:22 2018, Steve, Update, VAC, Vent preparations 
|
Thu Jul 12 23:59:14 2018, gautam, Update, General, Vent objectives and prep
|
Fri Jul 13 02:52:11 2018, gautam, Update, General, Vent objectives and prep
|
Fri Jul 13 17:13:45 2018, Koji, Update, General, Vent objectives and prep
|
Fri Jul 13 18:01:13 2018, gautam, Update, General, Low power MC
|
|
Message ID: 12578
Entry time: Mon Oct 24 11:39:13 2016
In reply to: 12576
|
Author: |
gautam |
Type: |
Update |
Category: |
General |
Subject: |
ALS recovered |
|
|
I worked on recovering ALS today. Alignments had drifted sufficiently that I had to to the alignment on the PSL table onto the green beat PDs for both arms. As things stand, both green (and IR) beats have been acquired, and the noise performance looks satisfactory (see Attachment #1), except that the X beat noise above 100Hz looks slightly high. I measured the OLTF of the X end green PDH loop (after having maximized the arm transmission, dither alignment etc, measurement done at error point with an excitation amplitude of 25mV), and adjusted the gain such that the UGF is ~10kHz (see Attachment #2). |
|
|
|
|