Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire
|
Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire
|
Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp
|
Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test
|
Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck
|
Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck
|
Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp
|
Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw
|
Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended
|
Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
|
Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended
|
Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
|
Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing
|
Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
|
Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful 
|
Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up
|
Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up 
|
Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up
|
Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
|
Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended
|
Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended
|
Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation
|
Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge
|
Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS
|
Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished
|
Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers
|
Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation
|
Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished
|
Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted
|
Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended
|
Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended
|
Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted
|
Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
|
Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO
|
Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  
|
Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic
|
Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic
|
Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics 
|
Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction
|
Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling 
|
Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed  
|
Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging
|
Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green
|
Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick 
|
Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick
|
Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned
|
Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm
|
Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 
|
Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber   
|
Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible
|
Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers
|
Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment
|
Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment 
|
Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
|
Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling
|
Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments
|
Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments
|
|
Message ID: 12397
Entry time: Wed Aug 10 23:45:03 2016
In reply to: 12390
Reply to this: 12398
|
Author: |
gautam |
Type: |
Update |
Category: |
SUS |
Subject: |
ETMY re-suspended |
|
|
Summary:
- ETMY has been re-suspended
- Reglued magnets (and also those that weren't knocked off) quite well with OSEM coils (see attachments)
- Pitch balance is off by ~2.8mrad (8mm over 1.5m lever arm) after inserting and centering OSEMs
- The same damping scheme used during the ETMX re-suspension process works reasonably well with ETMY as well
Details:
- I suspected that I had not tightened the wire clamp enough yesterday, and that the wire had slipped once the winches were removed
- Steve and I looked into the torque wrench situation today, and I realised that I had not been using the torque wrench correctly. What I thought were clicks indicating that the set torque has been reached was in fact just the sound the piece makes when going the opposite way relative to the direction set by the clip on the torque wrench. Anyways, the point is that while I thought I was tightening the screws with ~1.3Nm of torque, what was actually being applied was much less (although I don't have a good way to quantify how much less)
- So today I put the winches back on top of the tower, and winched the optic back up to the correct height using the ususal scribe line + microscope prescription
- I then tightened the wire clamp by hand. This is obviously not very repeatable, but it will have to do until we get a torque wrench with the correct range
- This seems to have done the trick - I did the tightening shortly after lunch, and after ~10 hours, there is no evidence of any wire sag
- I then proceeded to insert the OSEMs, first not all the way in to check the clearance available to the magnet, and once I was satisfied there was no danger of knocking anything off, went ahead and inserted the coils till the PD readouts were approximately half of the maximum (i.e. fully un-occluded) values. I used the OSEM coils originally on the ETMY tower, but all the other readout and drive electronics in the signal chain (satellite box included) belong to the ETMX setup (so as to avoid any cable routing over 80m from the Y end to the cleanroom). After some adjustment of the OSEM holding plates, I was able to center the magnets relative to the coils
- The tower only allows for a side OSEM to be inserted on one side. The other side does not have a threaded hole for a set screw. So we are forced to use the reglued magnet and not the side magnet that was not knocked off. By eye, it looks like the magnet may never completely occlude the LED, but the Striptool trace I was using to monitor the output of the PD did not yield any conclusive evidence. The optic was moving around a lot and I did not perform this check after turning the damping on
- I was able to damp the optic as well as we were able to damp ETMX on the clean bench (with the HEPA turned OFF). I had to turn the YAW gain down from 100-->75 to avoid some oscillations
- I then proceeded to check the pitch balance with the HeNe. The spot is low on an iris 1.43m away by ~8mm, which corresponds to a pitch misalignment of ~2.8mrad. I am not sure what to make of this - but perhaps its not unreasonable that we see this? Is there any record of what fine pitch balancing was achieved when the optic was put together back in 2010? This is also very sensitive to how far in/out the OSEM coils are, and though I've tried to center the coils as best as I can, I obviously have not done a perfect job...
What's next?
- Is the observed pitch imbalance a deal breaker? If so, I guess we need to re-glue a standoff?
- Are we willing to accept the side OSEM situation? (Tomorrow, I need to do a check to see what, if any, dynamic range we lose, with the damping on)
- If both the above are not problems we need to worry about, then:
- ETMY + ETMX -------> Vacuum bake on 22nd August (? - Bob also told me earlier today that he will try and put in some old turbo pump next week, and if that works, we could possibly get in the queue even before the 22nd)
- ETMY tower -------> Steve for sanding and removing wire grooves -------> Air bake
- ETMX tower -------> Air bake (provided the latest round of wire tightening has not left any grooves in the top piece of the tower, if it has, this needs to be cleaned up too)
- Some lengths of SOS wire (for re-suspending optics after bake) -------> Air bake
Attachments:
Attachment #1: Striptool trace showing all OSEM coils have been pushed in till the PD readout is approximately half the fully open value
Attachment #2: Pitch balance is off by ~2.8mrad (the Iris center is 5.5" above the table)
Attachment #3: UR magnet
Attachment #4: UL magnet
Attachment #5: LR magnet
Attachment #6: LR magnet
Attachment #7: SD magnet |
|
|
|
|
|
|
|
|
|
|
|
|
|