Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire
|
Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire
|
Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp
|
Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test
|
Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck
|
Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck
|
Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp
|
Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw
|
Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended
|
Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
|
Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended
|
Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
|
Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing
|
Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
|
Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful 
|
Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up
|
Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up 
|
Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up
|
Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
|
Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended
|
Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended
|
Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation
|
Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge
|
Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS
|
Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished
|
Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers
|
Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation
|
Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished
|
Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted
|
Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended
|
Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended
|
Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted
|
Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
|
Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO
|
Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  
|
Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic
|
Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic
|
Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics 
|
Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction
|
Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling 
|
Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed  
|
Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging
|
Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green
|
Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick 
|
Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick
|
Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned
|
Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm
|
Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 
|
Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber   
|
Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible
|
Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers
|
Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment
|
Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment 
|
Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
|
Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling
|
Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments
|
Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments
|
|
Message ID: 12386
Entry time: Tue Aug 9 15:27:57 2016
In reply to: 12384
Reply to this: 12390
|
Author: |
gautam |
Type: |
Update |
Category: |
SUS |
Subject: |
ETMY patch-up |
|
|
The pickle pickers came off nicely and both magnets seem to be glued on okay. The alignment of the face magnets look pretty good, but we will only really know once we suspend the mirror, check the pitch balance, and put in the OSEM coils.
I brought the ETMY suspension tower + OSEM coils out of the vacuum chamber into the cleanroom. Given that the old wire had a pretty sharp kink in it, I removed it with the intention of suspending the optic with a new length of wire. I noticed a few potential problems:
Attachment #1 - ETMY tower is different from ETMX tower:
- The ETMY suspension seems to be of an older generation - it does not have the the two secondary wire clamps.
- The top piece was attached to the body of the tower using non-silver-plated screws. Steve tells me this is the wrong type, and we can switch these out when we put it back together.
- The wire clamp itself doesn't have much of a groove from the wire. But the wires have made asymmetric grooves in the tower itself (the left groove is deeper than the right as seen in Attachment #1), that are clearly visible. Should we get these grooves removed before attempting re-suspension? How do we want to remove it? Steve thinks the best option is to send it to the shop for milling, as there is hardly any room to rub sandpaper along the piece because of the pins, and these pins don't come out.
- Or do we just not care about these grooves for now, if we are planning to use new wire anyways after air-baking the towers?
- Steve thinks we should have a few spares of these top blocks handy (the latest version, with the secondary clamps), he wants to know if we should place an order for these (we already have 10 spare wire clamp pieces available for if/when we need them)
Attachment #2 - the base of the tower is significantly rusty:
- A few wipes with an acetone soaked rag yielded quite a lot of rust
- Steve thinks this is because the wrong type of stainless steel was used
- Does this have to do with the cage being of an older variety? After a few vigorous wipes, no more rust came off, but the rusting process will presumably keep generating new rust? Is this a concern? Do we want to change this piece before putting the tower back in?
I am holding off on attempting to re-suspend the optic for now, until we decide if the old wire grooves need to be removed or not. If we are okay with re-using the same piece as is, or if we are okay with using sandpaper and not the machine shop to remove the grooves, I will resume the re-suspension process.
Eric suggested another alternative, which is to use the old ETMX tower. I don't recall it being rusted, but this has to be checked again. The other problem of the wire-grooves would possibly still be an issue.
Regarding the vacuum bake of the ETMs, Bob tells us that the best case scenario we are looking at is September.
|
|
|
|
|