40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Mon Jul 4 10:30:37 2016, ericq, Update, General, Preliminary vent plans
|
Tue Jul 5 17:14:02 2016, ericq, Update, General, Vent progress 
|
Tue Jul 5 19:10:41 2016, rana, Update, General, Vent progress
|
Tue Jul 5 21:51:35 2016, ericq, Update, General, Vent progress
|
Tue Jul 5 23:38:42 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 22:58:01 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 00:25:07 2016, ericq, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 10:49:03 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:35:45 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:48:09 2016, Koji, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 14:03:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 16:33:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 20:44:09 2016, Koji, Update, General, ETMX removed from suspension 6x
|
Sun Jul 10 15:38:01 2016, ericq, Update, General, ETMX in guiderod/standoff gluing fixture 6x
|
Tue Jul 12 16:08:00 2016, ericq, Update, General, ETMX ruby guided gluing
|
Wed Jul 13 21:13:51 2016, Koji, Update, General, ETMX guide rod gluing / ETMY Magnet gluing 13x
|
Thu Jul 14 22:29:57 2016, ericq , Update, General, ETMX guide rod gluing / ETMY Magnet gluing
|
Fri Jul 15 16:23:51 2016, ericq , Update, General, Gluing setbacks 
|
Tue Jul 19 16:39:29 2016, Lydia, Update, General, ETMX magnet gluing/guiderod excess glue removed 
|
Wed Jul 20 13:58:55 2016, Steve, Update, SUS, SUS damping out of vac chamber   
|
Thu Jul 21 17:01:59 2016, ericq, Update, General, ETMX magnet gluing/guiderod excess glue removed
|
Fri Jul 22 23:03:23 2016, gautam, Update, General, ETMX suspension - progress    
|
Sun Jul 24 03:43:56 2016, ericq, Update, General, Magnet positioning
|
Mon Jul 25 13:01:49 2016, ericq, Update, General, ETMX suspension - progress    
|
Mon Jul 25 13:47:19 2016, rana, Update, General, ETMX suspension - progress
|
Mon Jul 25 17:01:54 2016, Steve, Update, SUS, ETMX suspension - progress
|
Mon Jul 25 20:37:46 2016, gautam, Update, General, ETMX suspension - Side OSEM test
|
Tue Jul 26 18:07:57 2016, gautam, Update, General, ETMX suspension - Further OSEM Tests
|
Thu Jul 28 03:22:28 2016, ericq, Update, General, ETMX magnets re-reglued
|
Thu Jul 28 13:49:44 2016, gautam, Update, General, ETMX magnets re-reglued 
|
Thu Jul 28 17:48:17 2016, gautam, Update, General, ETMY LR magnet broke off
|
Thu Jul 28 22:43:03 2016, rana, Update, General, ETMY UL magnet broke off
|
Wed Aug 3 10:52:03 2016, Steve, Update, General, ETMY soaking dish  
|
Fri Jul 29 03:32:30 2016, ericq, Update, General, ETMX suspended once more
|
Fri Jul 29 13:17:34 2016, Koji, Update, General, Oven
|
Thu Jul 14 01:00:33 2016, Koji, Update, General, ETMX ruby guided gluing
|
Thu Jul 28 16:43:01 2016, Lydia, Update, General, ETMX aluminium standoff groove condition   
|
Fri Jul 8 21:22:38 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 09:34:26 2016, Steve, Update, General, PRM sensing voltage LR
|
Wed Jul 6 19:36:45 2016, Koji, Update, General, SUS Vmon  
|
Thu Jul 7 15:23:39 2016, ericq, Update, General, SUS Vmon
|
Thu Jul 7 16:05:55 2016, Koji, Update, General, SUS Vmon
|
Thu Jul 7 17:12:50 2016, Johannes, Update, General, Vent progress   
|
Tue Jul 12 23:51:16 2016, Johannes, Update, General, Vent progress - ETMY inspection 
|
Wed Jul 13 00:38:25 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Tue Jul 19 13:21:42 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Sun Jul 10 17:33:00 2016, ericq, Update, General, Vent progress
|
Mon Jul 11 15:13:22 2016, gautam, Update, General, Vent progress: in-date First Contact procured
|
|
Message ID: 12351
Entry time: Fri Jul 29 03:32:30 2016
In reply to: 12347
Reply to this: 12354
|
Author: |
ericq |
Type: |
Update |
Category: |
General |
Subject: |
ETMX suspended once more |
|
|
[gautam, ericq]
Tonight's progress on ETMX:
- All pickle pickers removed successfully, face magnet positions look symmetric (all on border of AR coating), side magnet same location as in yesterday's photo
- Flipped around clamp blocks on winches and top blocks, refinished main clamp block not on tower yet
- Trimmed viton tips of EQ stops, I had left them too long before, leading to bending and unwanted translation when in contact with optic
- Inserted optic into bottom EQ stops, turned bolts to position optic at correct height and sort of pitch leveled
- Threaded new length of wire up through both sides, clamped at winch. Made an effort to avoid any wire twisting.
- Winched until enough tension to sit in standoff groove, inserted second ruby standoff
- Winched to just come up off of bottom EQ stops, observed neccesary correction of second standoff for rough pitch balance
- Roughly pitch balanced by iterating standoff location
- Partially inserted OSEMS, all four face magnets looked low. We figure it's more likely that our microscope was set to the wrong height, than all four OSEMS being too high by the same amount. (Given how the face magnets are all located on the concentric circle of the AR coating, we know there wasn't much translation error in the magnet gluing)
- Did some common mode winching of both wire ends to get magnets to correct height, all OSEM alignments look good
- Inserted OSEMs to half of open voltage
- Having trouble engaging stable damping of all DoFs, this will be followed up in the daytime.
Since the air bake oven we had been using is out of commision, we're not sure where to do our EP30 test runs. If we are fortunate, we can get the fine pitch balance done tomorrow while Bob is still around, so he can help us quickly bake the test dots, so we can do the standoff gluing. |