Mon Jul 4 10:30:37 2016, ericq, Update, General, Preliminary vent plans
|
Tue Jul 5 17:14:02 2016, ericq, Update, General, Vent progress 
|
Tue Jul 5 19:10:41 2016, rana, Update, General, Vent progress
|
Tue Jul 5 21:51:35 2016, ericq, Update, General, Vent progress
|
Tue Jul 5 23:38:42 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 22:58:01 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 00:25:07 2016, ericq, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 10:49:03 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:35:45 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:48:09 2016, Koji, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 14:03:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 16:33:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 20:44:09 2016, Koji, Update, General, ETMX removed from suspension 6x
|
Sun Jul 10 15:38:01 2016, ericq, Update, General, ETMX in guiderod/standoff gluing fixture 6x
|
Tue Jul 12 16:08:00 2016, ericq, Update, General, ETMX ruby guided gluing
|
Wed Jul 13 21:13:51 2016, Koji, Update, General, ETMX guide rod gluing / ETMY Magnet gluing 13x
|
Thu Jul 14 22:29:57 2016, ericq , Update, General, ETMX guide rod gluing / ETMY Magnet gluing
|
Fri Jul 15 16:23:51 2016, ericq , Update, General, Gluing setbacks 
|
Tue Jul 19 16:39:29 2016, Lydia, Update, General, ETMX magnet gluing/guiderod excess glue removed 
|
Wed Jul 20 13:58:55 2016, Steve, Update, SUS, SUS damping out of vac chamber   
|
Thu Jul 21 17:01:59 2016, ericq, Update, General, ETMX magnet gluing/guiderod excess glue removed
|
Fri Jul 22 23:03:23 2016, gautam, Update, General, ETMX suspension - progress    
|
Sun Jul 24 03:43:56 2016, ericq, Update, General, Magnet positioning
|
Mon Jul 25 13:01:49 2016, ericq, Update, General, ETMX suspension - progress    
|
Mon Jul 25 13:47:19 2016, rana, Update, General, ETMX suspension - progress
|
Mon Jul 25 17:01:54 2016, Steve, Update, SUS, ETMX suspension - progress
|
Mon Jul 25 20:37:46 2016, gautam, Update, General, ETMX suspension - Side OSEM test
|
Tue Jul 26 18:07:57 2016, gautam, Update, General, ETMX suspension - Further OSEM Tests
|
Thu Jul 28 03:22:28 2016, ericq, Update, General, ETMX magnets re-reglued
|
Thu Jul 28 13:49:44 2016, gautam, Update, General, ETMX magnets re-reglued 
|
Thu Jul 28 17:48:17 2016, gautam, Update, General, ETMY LR magnet broke off
|
Thu Jul 28 22:43:03 2016, rana, Update, General, ETMY UL magnet broke off
|
Wed Aug 3 10:52:03 2016, Steve, Update, General, ETMY soaking dish  
|
Fri Jul 29 03:32:30 2016, ericq, Update, General, ETMX suspended once more
|
Fri Jul 29 13:17:34 2016, Koji, Update, General, Oven
|
Thu Jul 14 01:00:33 2016, Koji, Update, General, ETMX ruby guided gluing
|
Thu Jul 28 16:43:01 2016, Lydia, Update, General, ETMX aluminium standoff groove condition   
|
Fri Jul 8 21:22:38 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 09:34:26 2016, Steve, Update, General, PRM sensing voltage LR
|
Wed Jul 6 19:36:45 2016, Koji, Update, General, SUS Vmon  
|
Thu Jul 7 15:23:39 2016, ericq, Update, General, SUS Vmon
|
Thu Jul 7 16:05:55 2016, Koji, Update, General, SUS Vmon
|
Thu Jul 7 17:12:50 2016, Johannes, Update, General, Vent progress   
|
Tue Jul 12 23:51:16 2016, Johannes, Update, General, Vent progress - ETMY inspection 
|
Wed Jul 13 00:38:25 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Tue Jul 19 13:21:42 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Sun Jul 10 17:33:00 2016, ericq, Update, General, Vent progress
|
Mon Jul 11 15:13:22 2016, gautam, Update, General, Vent progress: in-date First Contact procured
|
|
Message ID: 12348
Entry time: Thu Jul 28 16:43:01 2016
In reply to: 12274
|
Author: |
Lydia |
Type: |
Update |
Category: |
General |
Subject: |
ETMX aluminium standoff groove condition |
|
|
I took some pictures with the digital microscope of the aluminum standoffs removed from ETMX. The first one had some leftover epoxy still attached, so I was able to distinguish which part of the groove was occupied by the wire. A better microscope would help (this one has a maximum magification of 80, 200 or so would be much better) but I was still able to see what looks like a second minimum inside the groove at the wire location (see Attachments 1 and 2). The bottom edge of the standoff shows the profile of the groove on the opposite side from the glue. I took several photos with different lighting angles and at different locations on the microscope stage and convinced myself that this was not just an artificial effect. I also took photos of the groove in a different place and did not see this feature (Attachment 3).
The other standoff in the same container had no visible damage to the groove or to the body of the rod. I rotated it under the mocroscope and could celarly see the 'V' shape all the way around. The smooth undanaged groove caught the light more easily and was obvious. The damaged one is scratched around much of the surface, but the undamaged standoff is very smooth. Eric, were both aluminum standoffs in the container with the extra ruby one taken off ETMX, or was one of them new? in any case, see Attachement 4 for a comparison. The believed damage is somewhat visible on the top edge of the lower standoff in the photo.
[Edit:] Also, in the drawings it looks like the specified radius for the bottom of the groove (0.001 in) is smaller than the radius of the wire (0.00085 in). This would prevent having two clean points of contact like Steve and Gautam were describing as the goal. This is also true of drawings for the new Sapphire guiderods, though the dimensions are in metric units the specified radius of the groove bottom is smaller than the wire's diameter, but larger than its radius. Maybe this providied the initial ability for the wire to move around and carve two distinct grooves. |
|
|
|
|
|
|
|
|