40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Jun 10 18:16:59 2016, varun, Update, PSL, Realignment of pre mode cleaner pmctrans_mcsum_signals.png
    Reply  Mon Jun 13 09:08:17 2016, Steve, Update, PSL, PMC slow drift PMCslowDrift.png
    Reply  Tue Nov 6 15:32:24 2018, Steve, Update, PSL, MC_Transmitted MC_Trans.png
Message ID: 12169     Entry time: Fri Jun 10 18:16:59 2016     Reply to this: 12170   14276
Author: varun 
Type: Update 
Category: PSL 
Subject: Realignment of pre mode cleaner 

The mode cleaner was misaligned probably due to the earthquake (the drop in the MC transmitted value slightly after utc 7:38:52 as seen in the second plot). The plots show PMC transmitted and MC sum signals from 10th june 07:10:08 UTC over a duration of 17 hrs. The PMC was realigned at about 4-4:15 pm today by rana. This can be seen in the first plot.

Attachment 1: pmctrans_mcsum_signals.png  19 kB  | Show | Show all
ELOG V3.1.3-