- Gautam will get help from Johannes and finish EX table by Monday.
- Steve will spend a day this week with Johannes on Green Monster bakeout.
- Q to analyzed green PDH servo and design demod low pass. Should we use the double LC notches to notch the 2f product? What's the demod filter attenuation requirement?
- Koji will make a drawing of the ruby suspension standoff prism and post into the elog so that Steve can get some quotes next week.
- Rana to implement 40m configuration in FOGprime17 and analyze RoC matching of ETMs. Get Antonio's help to analyzed SRC stability. Maybe use PyKat and Finesse since Antonio knows that stuff.
- Give OCXO boxes to WB refcav people. Rana get Rich to make another couple of boxes for 40m PMC, FSS, IMC.
- Rana/Koji get EKG to make specs and procure some new folding mirrors for the PRC/SRC. Make them a bit concave and dichroic.
|