Wed Apr 13 00:56:07 2016, gautam, Update, endtable upgrade, X endtable repopulation
|
Wed Apr 13 11:00:28 2016, Steve, Update, endtable upgrade, X endtable repopulation
|
Wed Apr 13 18:25:07 2016, gautam, Update, endtable upgrade, Lightwave health check
|
Fri Apr 15 18:38:12 2016, gautam, Update, endtable upgrade, Lightwave health check - NO IMPROVEMENT
|
Tue Apr 19 18:37:29 2016, gautam, Update, endtable upgrade, Laser swap + optical layout
|
Thu Apr 21 14:25:52 2016, gautam, Update, endtable upgrade, Green light recovered  
|
Tue Apr 26 15:22:35 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window 
|
Tue Apr 26 23:19:42 2016, gautam, Update, endtable upgrade, Green aligned to arm - high order mode flashes seen 
|
Thu Apr 28 00:41:08 2016, gautam, Update, endtable upgrade, more progress - Transmon PD installed
|
Fri Apr 29 00:55:46 2016, gautam, Update, endtable upgrade, green PDH locked to Xarm
|
Mon May 2 19:14:18 2016, gautam, Update, endtable upgrade, Optical layout almost complete
|
Thu May 5 03:05:37 2016, gautam, Update, endtable upgrade, ALS status update  
|
Thu May 5 04:05:03 2016, ericq, Update, LSC, Aux X PDH checks 
|
Thu May 5 14:03:52 2016, ericq, Update, LSC, Further Aux X PDH tweaks
|
Thu May 5 14:05:01 2016, rana, Update, endtable upgrade, ALS status update
|
Thu May 5 21:28:44 2016, gautam, Update, endtable upgrade, Innolight PZT capacitance
|
Thu May 19 16:29:20 2016, Steve, Update, endtable upgrade, Optical layout almost complete 
|
Fri Sep 30 19:53:07 2016, gautam, Update, endtable upgrade, X end IR pickoff fiber coupled
|
Wed Oct 5 16:28:10 2016, gautam, Update, endtable upgrade, EX laser power monitor PD installed
|
Wed Apr 27 15:04:47 2016, Steve, Update, endtable upgrade, Cleaning ETMX vacuum dirty window
|
Fri Apr 29 16:05:23 2016, gautam, Update, endtable upgrade, Cleaning ETMX vacuum dirty window
|
|
Message ID: 12075
Entry time: Wed Apr 13 18:25:07 2016
In reply to: 12074
Reply to this: 12079
|
Author: |
gautam |
Type: |
Update |
Category: |
endtable upgrade |
Subject: |
Lightwave health check |
|
|
[Koji,gautam]
Lightwave NPRO information:
Model: 126-1064-700
Serial Number: 337
Manufactured: December 1998!!
Details of checks performed:
Koji tuned the parameters on the laser controller and we observed the following:
- Turning "ADJ" to +10 and the pumping current all the way up to the maximum (2.62A) allowed us to recover an output power of 300mW, at a laser crystal temperature of ~45degrees
- The output power increased almost monotonically as a function of the laser crystal temperature - why? We were able to see powers as high as 250mW (at ADJ=0) for the maximum crystal temperature of ~60 degrees.
- We checked that we could believe the readout of the power meter by measuring the power using the Scientech power meter - we saw ~270mW after the Faraday with this meter, accounting for ~10% loss through the Faraday, this corresponds to an output power of 300mW (all this was done at ADJ=+10, DC=2.62A). I suspect that the display is dodgy though, because changing the Diode Current from 2.52A to 2.62A increased the output power by almost 100mW, which seems hard to believe?
- The Lightwave NPRO does not have heat dissipation fins attached - could this be affecting the power output somehow? In any case, this has to be rectified. So if we decide to keep the Lightwave NPRO, the layout will still need minor changes to accommodate the heat fins. Steve, do we have these in hand?
Way forward
Ericq has begun the characterization of the repaired Innolight. We checked that it outputs 1W of power. We will now have to perform the following measurements:
- Frequency noise using PLL
- AM/PM response of the PZT
- Laser power output as a function of diode current - this will be useful for diagnostic purposes in the future
- AUX temperature vs PSL temperature at which beatnotes can be found
- Waist measurement - the mode matching and optical layout upstream of the doubling oven at least will have to be modified significantly
All of these will have to be done before installing this laser at the endtable.
I believe the consensus as of now is to go ahead with carrying out the above measurements. Meanwhile, we will keep the Lightwave NPRO on and see if there is some miraculous improvement. So the decision as to whether to use the Innolight is deferred for a day or two. |