Tue Feb 2 18:35:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table
|
Tue Feb 2 18:54:02 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table
|
Wed Feb 3 23:23:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
|
Thu Feb 4 09:16:46 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table
|
Fri Feb 5 00:23:01 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table   
|
Fri Feb 5 16:50:24 2016, gautam, Update, Green Locking, First pass at mode-matching   
|
Mon Feb 8 15:36:37 2016, gautam, Update, Green Locking, Alternative mode-matching scheme
|
Tue Feb 9 04:37:10 2016, ericq, Update, Green Locking, Laser swap initiated
|
Tue Feb 9 11:49:47 2016, gautam, Update, Green Locking, Laser swap initiated
|
Tue Feb 9 19:15:36 2016, gautam, Update, Green Locking, Laser swap - updates 
|
Wed Feb 10 17:57:15 2016, gautam, Update, Green Locking, Laser swap - updates
|
Fri Feb 12 17:05:40 2016, gautam, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm
|
Fri Feb 12 19:07:52 2016, Koji, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm
|
Fri Feb 19 00:42:19 2016, gautam, Update, Green Locking, Laser swap - beam ellipticity from laser?  
|
Mon Feb 22 13:56:52 2016, gautam, Update, Green Locking, Laser swap -reflected beam from ETM aligned
|
Tue Feb 23 23:01:16 2016, gautam, Update, Green Locking, Laser swap - Green PDH locking 
|
Wed Feb 24 19:29:13 2016, gautam, Update, Green Locking, Laser swap - Green PDH locked
|
Fri Feb 26 01:52:44 2016, gautam, Update, Green Locking, Laser swap - Green PDH OLTF
|
Mon Feb 29 17:17:26 2016, gautam, Update, Green Locking, Laser swap - still no green beatnote
|
Wed Mar 2 17:42:19 2016, gautam, Update, Green Locking, Laser swap - some progress
|
Thu Mar 3 01:25:50 2016, gautam, Update, Green Locking, Laser swap - 2 IR + 1 green beatnotes found
|
Fri Mar 4 01:11:41 2016, gautam, Update, Green Locking, Laser swap - both green beatnotes found
|
Sat Mar 5 23:31:01 2016, gautam, Update, Green Locking, Laser swap - some updates    
|
Mon Mar 7 23:51:36 2016, gautam, Update, Green Locking, Laser swap - some improvement   
|
Tue Mar 8 18:22:20 2016, rana, Update, Green Locking, Laser swap - some improvement
|
|
Message ID: 11970
Entry time: Tue Feb 2 18:35:47 2016
Reply to this: 11971
|
Author: |
gautam |
Type: |
Update |
Category: |
Green Locking |
Subject: |
Lightwave NPRO moved from PSL table to SP table |
|
|
I've moved the following components that was a part of Koji's setup from the PSL table to the SP table so that I may measure the beam profile of the beam from the spare Lightwave NPRO and work on a mode-matching solution for the X-end.
- Lightwave laser
- Lightwave controller
- Interlock switch (Newport)
- HWP and PBS
I did some preliminary characterization of the beam from the Lightwave - in the power controlled mode, setting the "ADJ" parameter to 0 (which is the state recommended in the manual) gives an output power of ~240mW. I used the HWP and PBS to dump most of this into a "Black Hole" beam dump, but I was still getting about 300uW of power after this. This was saturating the CCD in the beam profiler (even though 300uW for a beam of ~1mm should be well within the recommended operating limits as per its manual - maybe the ND filter on the camera isn't really ND4.0), and so I further reduced the "ADJ" parameter on the laser controller to -20, such that I had no saturation of the CCD. I will try and take some data later today. The laser is presently in "Standby" mode, and the SP table is fully covered again. |