40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 16 03:44:18 2015, Koji, Update, LSC, RF micky mouse IMG_20150915_231038191.jpgIMG_20150915_234257144.jpg
    Reply  Thu Sep 17 17:27:01 2015, gautam, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed DIN_rail_terminal.jpg
       Reply  Thu Sep 17 19:42:43 2015, Koji, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed IMG_20150917_190635033.jpgIMG_20150917_192551919.jpg
       Reply  Fri Sep 18 08:03:53 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
       Reply  Fri Sep 18 08:04:09 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
Message ID: 11614     Entry time: Thu Sep 17 19:42:43 2015     In reply to: 11613
Author: Koji 
Type: Update 
Category: LSC 
Subject: RF micky mouse - dodgy DIN connector blocks fixed 

1. The delay-line box is now hooked up to the cross connect +15V supply.

2. The broken RF cable was fixed.

It is actually the POP22 cable.
Therefore, we might see significant change of the signal size for POP22.
Be aware.

RG405 + SMA connector rule

- Don't bend the cable at the connector.

- Always use a cap on the connector. It is a part of the impedance matching.

- Use transparent shrink tube for strain relieving and isolation. This allow us to check the condition of the shield without removing the cover.

Attachment 1: IMG_20150917_190635033.jpg  253 kB  | Hide | Hide all
IMG_20150917_190635033.jpg
Attachment 2: IMG_20150917_192551919.jpg  317 kB  | Hide | Hide all
IMG_20150917_192551919.jpg
ELOG V3.1.3-