Entry  Tue Jul 23 22:55:13 2013, Jenne, Update, VAC, BS, ITMY doors to be opened in the morning 
    Reply  Wed Jul 24 10:35:41 2013, Steve, Update, VAC, BS, ITMY doors are removed beforeDoorsOff.pngparticlecount10d.png
       Reply  Mon Jul 29 16:04:40 2013, Steve, Update, VAC, AC removed acout.pngAlAcACa.jpgAlAcACb.jpg
          Reply  Mon Jul 29 16:15:13 2013, Koji, Update, VAC, AC removed 
          Reply  Mon Aug 5 10:50:48 2013, Steve, Update, VAC, RGA background v75bgMd12.png
             Reply  Tue Aug 6 10:06:29 2013, Steve, Update, VAC, Pumpdown is at 500Torr befPd.png
                Reply  Tue Aug 6 16:45:31 2013, Steve, Update, VAC, Pumpdown is completed 8hrPd76.png1mT.png
                   Reply  Wed Aug 7 10:51:49 2013, Steve, Update, VAC, Pumpdown at 26hrs 26hr.png14datm.png
                      Reply  Wed Aug 7 15:36:29 2013, Steve, Update, VAC, TP2 drypump replaced forelinesPs.jpg
                         Reply  Thu Aug 8 07:57:23 2013, Steve, Update, VAC, pumpdown at 48 hrs 48hrsPd76.png
                            Reply  Thu Aug 8 10:31:28 2013, Steve, Update, VAC, few reminders of this vent GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg
                               Reply  Wed Aug 28 11:23:41 2013, Steve, Update, VAC, crane repair sheduled 
                               Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
                                  Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 
                                  Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
                                     Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg
                                        Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 
                                        Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
                                           Reply  Thu Nov 7 11:19:04 2013, Steve, Update, VAC, crane work POSTPONED to Monday 
                                           Reply  Wed Nov 13 08:46:03 2013, Steve, Update, VAC, vertex crane repair completed 
                            Reply  Wed Aug 14 08:24:20 2013, Steve, Update, VAC, pumpdown at day 8 pd76md8.png
                               Reply  Mon Aug 19 11:12:54 2013, Steve, Update, VAC, RGA scan at day 13 rgaScan13d.png
                                  Reply  Wed Aug 28 15:41:42 2013, Steve, Update, VAC, RGA scan at day 23 pd75md23.png
                                     Reply  Fri Sep 6 09:27:10 2013, Steve, Update, VAC, 31 days after pumpdown day31vac.png
                                        Reply  Tue Sep 10 09:18:22 2013, Steve, Update, VAC, dry pump is getting loud 
                                           Reply  Tue Sep 10 15:43:01 2013, Steve, Update, VAC, TP3' dry pump is replaced 
                                     Reply  Mon Sep 16 10:57:11 2013, Steve, Update, VAC, RGA scan at day 41 pd76m41dRGA.pngpd76m41d.png
                                        Reply  Wed Oct 9 11:48:10 2013, Steve, Update, VAC, RGA scan at day 65 scanRGApd76m65d.pngpd76m65d.png
                                           Reply  Fri Nov 22 16:32:08 2013, Steve, Update, VAC, RGA scan at day 108 RGAscanVacNormal108d.pngday108.pngpd76m110d.png
                         Reply  Tue Apr 29 16:42:29 2014, Steve, Update, VAC, TP2 drypump replaced dryforepumpreplaced.png
                            Reply  Tue Dec 23 15:37:32 2014, Steve, Update, VAC, TP3 drypump replaced 
                               Reply  Mon Sep 14 10:41:03 2015, Steve, Update, VAC, TP2 dry pump replaced TP2_dry_pump_replaced.png
                                  Reply  Mon Sep 21 11:12:14 2015, Steve, Update, VAC, cold cathode is flaky cc4jumps.png
                                     Reply  Tue Sep 22 08:58:38 2015, Steve, Update, VAC, cold cathode is flaky 4and80days.png
                                        Reply  Fri Sep 25 17:00:38 2015, Steve, Update, VAC, cold cathode is flaky flakyCC4.png
Message ID: 11593     Entry time: Mon Sep 14 10:41:03 2015     In reply to: 10838     Reply to this: 11625
Author: Steve 
Type: Update 
Category: VAC 
Subject: TP2 dry pump replaced 

TP2 dry fore pump sn PLE10082 was replaced at pressure 717 mTorr,  TP2 50K rpm 0.33A @ 112,677 hrs

Top seal life was 8,160 hrs

Model  SH110, Sn LP1007L556 was installed. It's fore line pressure after 30 minutes of running 38 mTorr, TP2 turbo at 50K rpm 0.18A

 

 