40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Thu May 28 16:43:52 2015, Steve, Update, PEM, Guralps swapped
|
Mon Jun 1 15:22:19 2015, Steve, Update, PEM, Guralps X- short cable is bad
|
Wed Jul 29 14:32:01 2015, Steve, Update, General, How not to solder
|
Thu Jul 30 10:38:18 2015, Steve, Update, PEM, Y sesimostation is back on 
|
Thu Jul 30 13:34:52 2015, Koji, Update, PEM, Y sesimostation is back on
|
Thu Jul 30 15:24:54 2015, Steve, Update, PEM, Y sesimostation is back on  
|
Fri Jul 31 10:36:22 2015, Steve, Update, PEM, X seismo station short cable removed
|
Sat Aug 1 20:46:29 2015, Koji, Update, PEM, X seismo station short cable removed
|
Wed Aug 12 11:44:13 2015, ericq, Update, PEM, Gur2 Channels still wonky
|
Fri Aug 14 09:07:45 2015, Steve, Update, PEM, Gur interface box is wonky 
|
Fri Aug 14 12:10:08 2015, Koji, Update, PEM, Gur interface box is wonky
|
Tue Aug 18 11:16:17 2015, Steve, Update, PEM, Gur interface box is wonky
|
Wed Aug 19 07:58:25 2015, Steve, Update, PEM, Gur interface box
|
Thu Aug 20 11:31:55 2015, Koji, Update, PEM, Gur interface box
|
Fri Aug 21 17:15:13 2015, Steve, Update, PEM, Gur interface box
|
Fri Aug 28 17:04:12 2015, Steve, Update, PEM, Gur interface box cable
|
Fri Aug 28 20:20:26 2015, rana, Update, PEM, Gur interface box cable
|
Tue Sep 1 10:36:06 2015, Steve, Update, PEM, Gurs swapped
|
Thu Sep 17 16:04:09 2015, Steve, Update, PEM, Gurs
|
Fri Aug 14 17:20:01 2015, Jenne, Update, PEM, Gur interface box is wonky
|
|
Message ID: 11505
Entry time: Fri Aug 14 09:07:45 2015
In reply to: 11497
Reply to this: 11506
11507
|
Author: |
Steve |
Type: |
Update |
Category: |
PEM |
Subject: |
Gur interface box is wonky |
|
|
Atm1, Before cable swap
Atm2, The long cables were swapped at the input of the interface box.
We can conclude that the problem is in the interface box
I wonder if interface box input 3 is wired? |
|
|