Entry  Thu Feb 12 12:23:21 2015, manasa, Update, General, Waking up the PDFR measurement system 
    Reply  Wed Mar 11 15:35:38 2015, manasa, Update, General, Waking up the PDFR measurement system 
       Reply  Wed Apr 8 21:10:55 2015, manasa, Update, General, Waking up the PDFR measurement system 
Message ID: 11132     Entry time: Wed Mar 11 15:35:38 2015     In reply to: 11014     Reply to this: 11209
Author: manasa 
Type: Update 
Category: General 
Subject: Waking up the PDFR measurement system 

I was around the 1Y1 rack today. Trials were done to get the PDFR of AS55.

Quote:

[EricG, Manasa]

We woke up the PDFR measurement setup that has been sleeping since summer. We ran a check for the laser module and the multiplexer module. We tried setting things up for measuring frequency response of AS55.
We could not repeat Nichin's measurements because the gpib scripts are outdated and need to be revised. 

PDFR diode laser was shutdown after this job.

 