40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Feb 12 12:23:21 2015, manasa, Update, General, Waking up the PDFR measurement system 
    Reply  Wed Mar 11 15:35:38 2015, manasa, Update, General, Waking up the PDFR measurement system 
       Reply  Wed Apr 8 21:10:55 2015, manasa, Update, General, Waking up the PDFR measurement system 
Message ID: 11014     Entry time: Thu Feb 12 12:23:21 2015     Reply to this: 11132
Author: manasa 
Type: Update 
Category: General 
Subject: Waking up the PDFR measurement system 

[EricG, Manasa]

We woke up the PDFR measurement setup that has been sleeping since summer. We ran a check for the laser module and the multiplexer module. We tried setting things up for measuring frequency response of AS55.
We could not repeat Nichin's measurements because the gpib scripts are outdated and need to be revised. 

PDFR diode laser was shutdown after this job.

ELOG V3.1.3-