40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jul 2 11:32:44 2014, Jenne, TaraV, Update, PEM, Status of seismometer stations, Yend Guralp moved 
    Reply  Mon Jul 7 14:38:55 2014, Steve, Update, safety, safety training 
       Reply  Thu Dec 11 15:40:04 2014, Steve, Update, safety, safety training 
    Reply  Tue Aug 12 13:31:58 2014, Jenne, Update, PEM, Seismometer cables in place, ready for sensors 
       Reply  Thu Sep 25 11:38:47 2014, Jenne, Update, PEM, Seismometers in place 
Message ID: 10368     Entry time: Tue Aug 12 13:31:58 2014     In reply to: 10119     Reply to this: 10539
Author: Jenne 
Type: Update 
Category: PEM 
Subject: Seismometer cables in place, ready for sensors 

[TaraV, Jenne]

The short cable from the slab to the sensor has been assembled and installed for the Trillium slab at the corner station.  The corner still needs the sensor and the long cable, both of which are in use by the gyro experiment.

The STS-2 cable that was running to the Xend was pulled, and the new long Guralp cable that Den made was installed with help from Andres.  The Xend just needs the sensor itself, which is also in use in gyro-land.

So, once we get the 2 seismometers and the one cable back from Zach, we should have 3 sensors nicely on the slabs that Den and Steve designed.