40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog, Page 5 of 5  Not logged in ELOG logo
Entry  Wed May 24 09:58:17 2017, Aidan, Electronics, Electronics, Temperature sensor batteries swapped in TCS Lab 
I noticed that the TCS lab temperature sensor batteries died. Apparently they died two days ago. I swapped in some new batteries this morning.
 
Entry  Wed Oct 11 19:14:16 2017, Jon Richardson, Computing, Electronics, Replaced TCS Monitor 
I replaced the dead 24" monitor on the work bench, which is connected to the video multiplexer. Mike Pedraza was kind enough to bring us us
a new one and take away the old one.
Entry  Fri Oct 13 18:35:29 2017, Jon Richardson, Computing, Electronics, Installed Maku Ethernet CCD Camera IMG_2287.JPG
I installed the Maku Gigabit CCD camera driver software on the hws-ws machine. The camera viewer can be opened from the terminal (from any directory)
with the command

$ZimbaViewer
    Reply  Tue Oct 24 10:19:53 2017, Jon Richardson, Computing, Electronics, Installed Maku Ethernet CCD Camera 
There is an SDK for the camera with compiled examples. For a really quick image grab from the command line, use the following:

/opt/Vimba_2_1/VimbaC/Examples/Bin/x86_64bit/SynchronousGrab

This will produce a BMP image. We should probably recompile the C code to produce a 16-bit TIFF image.
Entry  Tue Oct 24 15:05:57 2017, Jon Richardson, Computing, Electronics, Installed a Realtime Beam Profiler for the Mako CCD Camera 
Aidan found a C demo code for acquiring a single image from the Mako CCD camera and saving it to disk (SynchronousGrab -- aliased on tcs-ws as makoGrab).
I wrapped that inside my realtime HWS beam profiler code to create a realtime beam profiler for the Mako camera. The interface is identical to that for
the HWS.
Entry  Mon May 3 17:42:20 2010, Aidan, Computing, EPICS, EPICS install by Alex history.txthistory_root.txt
Alex Ivanov came in on Friday and demonstrated his EPICS kung-fu. His EPICS knig-fu is strong.
We fixed the IP address of the Hartmann machine, renamed it hartmann, and mounted the cvs drives
from the frame builder. - including the EPICS base from that machine. In principle, with a new softIoc, this should have been enough to run EPICS on the
Entry  Tue May 18 09:33:44 2010, Aidan, Computing, EPICS, Added defocus and other Hartmann sensor channels to EPICS and DAQ 
 I've added the following channels to the HWS softIoc in /cvs/cds/caltech/target/softIoc/HWS.db
 
 
Entry  Fri Jul 30 19:22:24 2010, Aidan, Computing, EPICS, Waveform Channel Access for storing centroids 
 A waveform channel was added to the HWS softIoc on hartmann. This allows arrays of data to be stored in a single channel. It's not clear whether
it is storing this data as a set of number or strings. However, the values can be changed by the following command:
caput -a -n C4:TCS-HWS_CENTROIDSX 5 1,2,3,4,5
    Reply  Fri Jul 30 21:19:05 2010, Aidan, Computing, EPICS, Waveform Channel Access for storing centroids 
After some discussion with Frank we figured out how to edit the record type in HWS.db so that the waveform/array channel actually behaved like a numerical
array and not like a single string. This just involved defining the data type and the element count in the record definition, like so:
record(waveform, "C4:TCS-HWS_CENTROIDSX")
{
field(EGU,"PIXELS")
Entry  Tue Apr 12 22:30:59 2011, Aidan, Computing, EPICS, Installed the thermistor on the Hartmann plate/created MEDM ADC Input screen Screenshot-TCS_athena01_input_screen.adl.png
I restarted the Athena box and created an MEDM screen that shows the 8 differential input voltages next to their corresponding inputs on the breakout
terminal strip. See the attached image. The MEDM screen is located at /home/controls/TCS_athena01_input_screen.adl on tcs_daq.
Channel 1 in the Athena is taking the output from the first channel in the temperature sensing box. That is connect to an RTD in the Hartmann sensor.
Entry  Tue Apr 12 22:46:27 2011, Aidan, Computing, EPICS, Added temperature sensor channels to the frame builder and restarted fb1 
Added the following to the frame builder in /cvs/cds/caltech/chans/daq/C4HWS.ini and restarted daqd as per instructions in
http://nodus.ligo.caltech.edu:8080/TCS_Lab/29
 
Entry  Fri Apr 22 19:51:37 2011, Aidan, Computing, EPICS, pyepics installed on princess_sparkle start_test_channels.py
 I installed the pyepics package on princess_sparkle since this is much easier under Ubuntu than under CentOS.

    sudo apt-get install python-dateutil python-setuptools
    make sure that LD_LIBRARY_PATH points to EPICS libraries
by echo $LD_LIBRARY_PATH
    sudo ldconfig
    sudo easy_install -U pyepics

Then I started the following python script
Entry  Tue Feb 8 13:02:26 2011, Aidan, Electronics, Delivery Note, Thorlabs S322C 200W power head arrived Co2_200W_power_meter_delviery_note.pdfCo2_200W_power_meter_calibration_info.pdf
 The 200W Thermopile power head from Thorlabs arrive today. The scanned delivery note and calibration info are attached.
Entry  Fri Feb 18 13:26:23 2011, Aidan, Things to Buy, Delivery Note, First parts of Bosch framing have arrived from Valin Packing_List_01.pdf
The first pieces of the Bosch framing have arrived from Valin Corporation. These are just small pieces such as the fasteners and the gussets. There are
no custom lengths of framing yet.
The details are in the attached Packing List. [1:25PM] I haven't verified that everything is there yet.
    Reply  Wed Feb 23 18:04:38 2011, Aidan, Things to Buy, Delivery Note, First parts of Bosch framing have arrived from Valin Packing_List_02.pdf


    
        
            Quote:
        
        
            

           The first pieces of the Bosch framing have arrived from Valin Corporation. These are just small pieces such as the fasteners and the gussets.
Entry  Thu Feb 24 13:35:41 2011, Aidan, Things to Buy, Delivery Note, Bosch framing has arrived Packing_List_03.pdf
 The custom pieces of the Bosch framing have arrived. Transportation is currently moving them downstairs to the lab. The packing list is attached.
 
 
Entry  Tue Mar 1 11:19:34 2011, Aidan, Things to Buy, Delivery Note, MFF001 flipper mirror has arrived Flipper_mirror_delivery_notice.pdf
 The Thorlabs MFF001 flipper mirror recommended by Bram has arrived. The delivery note is attached.
Entry  Tue Mar 1 11:21:37 2011, Aidan, Things to Buy, Delivery Note, More Bosch framing parts - angle connectors Packing_List_04.pdf
 Another box of Bosch framing parts arrived today. The delivery note is attached.
Entry  Tue Mar 8 18:57:50 2011, Aidan, Things to Buy, Delivery Note, Fiber optics cable and Bosch Fastener deliveries_2011-03-08.pdf
 
Entry  Fri Mar 11 13:11:33 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch connectors have arrived Packing_List_05.pdf
 See attached delivery note ...
    Reply  Wed Mar 16 15:05:47 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch equipment has arrived Packing_List_06.pdf
30mm T-junctions, grounding straps and T-slot covers have arrived


    
        
            Quote:
        
        
            
Entry  Mon Apr 4 13:13:23 2011, Aidan, Things to Buy, Delivery Note, Newfocus 5102 mirrors and Firewire extension cable have arrived receipt_mirrors.pdf
 See attached delivery note ...
Entry  Sun Apr 17 14:59:36 2011, Aidan, Things to Buy, Delivery Note, L-Com patch panel, Newport lenses, Thorlabs fibers delivery notes newport_lenses_2011-03.pdfL-Com_patch_panel_-_2011-03.pdfthorlabs_fiber_optic_cables_2011-03.pdf
 
Entry  Wed Oct 30 12:13:14 2019, Jon, Misc, Delivery Note, New lab hardware IMG_3782.jpgIMG_3783.jpgIMG_3784.jpgIMG_3785.jpg
Ian and I moved some new hardware into the lab, shown in the below photos. It is from the shipment of loaned
equipment recently returned by Whitman College. 

Attachment 1:
Entry  Mon Dec 28 14:48:29 2009, Aidan, Computing, DAQ, VME crate has a "new" CPU - needs to be configured  VME_boot_02.jpgVME_boot_01.JPGVME_boot_03.jpg
I installed a recycled VME crate in the electronics rack. It currently has a Baja 4700E CPU card in it - and this needs to be configured. We also have
the following cards, which are not plugged in right now.
1. ICS-110A-32 Analogue-to-Digital Converter - the jumpers need to be set on this to give it a unique memory address in the VME bus.
Entry  Tue Dec 29 16:05:09 2009, Frank, Computing, DAQ, booting VME crates from fb1 
 http://nodus.ligo.caltech.edu:8080/AdhikariLab/514
Entry  Tue Dec 29 17:50:57 2009, Aidan, Computing, DAQ, VME crate has proper boot settings VME_tcs_boot_settings.jpg
We fixed the start-up settings on the VME crate to look for a TCS startup file on fb0. The settings on the Baja 4700 are now:
Entry  Fri Jan 29 10:02:15 2010, Aidan, Computing, DAQ, New DAQ ordered 
 On the advice of Ben Abbott, I've ordered the Diamond Systems Athena II computer w/DAQ, as well as an I/O board, solid state disk and housing for
it. The delivery time is 4-6 weeks.
Diamond Systems Athena II
Entry  Mon Apr 18 15:03:49 2011, Aidan, Computing, DAQ, Athena DAC channels hooked up to BNC patch panel 
 I added the four Athena DAC channels to the second BNC patch panel in the rack. At the moment there are only two EPICS channels in the database:

    C4:TCS-ATHENA_DAC0
    
    C4:TCS-ATHENA_DAC1

 
Entry  Mon May 13 14:09:02 2013, Zach, Computing, DAQ, C2ATF model rebuilt 
 ATF:1812
    Reply  Thu Oct 26 10:31:31 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc 
These are also being written to frames on FB4.




Quote:



I've added a softIoc
    Reply  Thu Oct 26 10:45:44 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc FullSizeRender_10.jpg
See attached photo for how data is written to frames ...




Quote:



These are also being
Entry  Tue Oct 31 14:37:49 2017, Aidan, Computing, DAQ, New Acromag units for AWC experiments - XT1221 ans XT1541 
I set up an Acromag DAC today with the fixed IP address 10.0.1.56. Last Friday Andrew and Antonio set up an ADC unit with fixed IP address 10.0.1.55.
The former is for outputting a control voltager that goes to the driver for the heater on composite mirror we are testing. The latter is used to read
the temperature of the thermocouple on the composite mirror. The thermocouple to voltage conversion is achieved with a Type
Entry  Thu Nov 9 14:18:56 2017, Aidan, Computing, DAQ, FB4 ip address has changed 
We've had trouble logging into FB4. I access the computer directly in the AWC lab and found that the IP address had changed from 10.0.1.156 to 10.0.1.161.

I'm not sure how this happened. It's possible that the IP address is not set to a static value and FB4 was rebooted. I'm not familar
with Debian so I don't know where to look to find whether the IP address is static or not.
Entry  Mon Feb 5 15:08:06 2018, Aidan, Computing, DAQ, Frame builder clock is totally wrong 
The framebuilder on FB4 thinks the current time is 26-Jan-2018 6:18AM UTC. The date command on FB4 yields the correct date and time (5-Feb-2018 15:17
PST).

There is a major error with the framebuilder clock.
    Reply  Wed May 30 18:50:05 2018, awade, Computing, DAQ, Rebooted fb4 
Time was still off by nine days as of yesterday.  I tried rebooting remotely to see if time would correct to system clock.  It didn't and
fb4 hung.

Just manually restarted the box.  Now dataviewer is showing a 'Time Now'  of 5 Jan 1980.   
    Reply  Wed May 30 18:59:49 2018, awade, Computing, DAQ, FB4 ip address has changed 
Maybe you've resolved this now. I moved the DHCP allocation to 10.0.1.160 and above around that time because a bunch of misc devices were starting
to populate the dynamically allocated IP space around there.  I'd say FB4 was not setup with a manual IP at the time.

 
Entry  Thu Aug 16 11:52:27 2018, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 

Thermcouple reader is plugged into an Acromag ADC (10.0.1.55)
acromag1 is now reading this in:

~/modbus/iocBoot/iocTest/test_acromag.cmd
(contains ip address of ADC)
~/modbus/db/TEMPMONCHANS.db (contains the EPICS channel definitions and calibration of thermocouple reader)


C4:AWC-TEMPMON_C
(output channel)


Restored work done in http://nodus.ligo.caltech.edu:8080/TCS_Lab/201
    Reply  Wed Oct 17 16:17:45 2018, awade, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 TCSIOCFILS.tar.gz
Acromag IOC process was removed from PSL lab acromag1 computer a few months ago.  Aidan needs them again but it would be better if it were run from
TCS lab computers.

An instance of the modbus IOC is now running on tcs-ws within a docker container.  Docker is named tcslabioc.  Configuration files
Entry  Mon Jun 17 20:29:34 2019, Jon, Lab Infrastructure, Computing, Server rack cleaned up, new workstation installed IMG_3419.jpg
In anticipation of the point absorber SURF project, I cleaned up the server rack and installed a new workstation today.

The workstation replaces the old one, whose hard drive had failed, with a more powerful machine. The hostname (tcs-ws), IP address (10.0.1.168),
user name (controls), and standard password (written in the secret place) are all the same as before.
Entry  Mon Jul 22 09:44:21 2019, Jon, Lab Infrastructure, Computing, Installed Amplifying VGA Splitter IMG_3522.jpgIMG_3421.jpg
The VGA signal outputted by the multiplexer is too weak to drive two monitors. This has required video cables to be manually switched back and forth
between the monitor mounted above the laser table and the desktop console.

Today I solved this problem by installing an amplifying (active) VGA splitter on the video output of the multiplexer. One output of the
Entry  Tue Aug 6 19:22:28 2019, Jon, Electronics, Computing, QIL NFS server set up 
I've started building the NFS server for the QIL cymac. It's sitting on the workbench in the TCS lab next to the rack. Please don't move
it or any of the parts behind it.
Entry  Thu Jul 13 10:11:57 2017, awade, Electronics, Borrowed, Borrowed newport TrueRMS Supermeter 2017-07-13_10.06.28.jpg2017-07-13_10.06.29.jpg
I lent your fancy Newport TrueRMS Supermeter with the thermocouple plugs on the top to the SURF student Jordon.  He has it in the cryo lab or the
EE workshop with one of the PSL lab temperature probes.
Entry  Thu Sep 21 18:56:53 2017, awade, Misc, Borrowed, Borrowed thorlabs power meter 
Borrowed thorlabs power meter on 21 Sep 2017.  It is on the south table of the ATF lab.
Entry  Thu May 23 11:36:49 2019, agupta, Lab Infrastructure, Borrowed, Borrowed Label Maker 
I have borrowed TCS's label maker in CTN for few days. If you need it, you can take it from the top of blue cabinets.
Entry  Thu Oct 26 10:21:28 2017, Aidan, Computing, , Beam size EPICS channels added to TCS-WS softIoc 
I've added a softIoc to TCS-WS to capture the beam size from the MAKO camera. The IOC is run using ...

controls@tcs-ws:~$ softIoc -S EPICS_IOC/iocBoot/iocfirst/st.cmd &

The st.cmd contains the following text:
Entry  Mon Jul 22 18:46:23 2019, Edita Bytyqi, Lab Infrastructure, , Laser-Lens-HWS Setup 20190722_183933.jpg20190722_183928.jpg
Today, I set up a system consisting of the 520 nm laser, a 2'' mirror and two lenses of focal lengths f1 = 40 cm and f2 = 20 cm. The goal was
to collimate the beam coming from the laser, so it goes parallel through the test optic at a radius of ~2.5 cm and then focus it to a radius of ~
1.2 cm to fit the CCD dimensions of the HWS. The mirror was placed about 1 cm close to the laser and the first lens is setup at a distance~f1=40cm from
Entry  Mon Aug 12 21:15:12 2019, Edita Bytyqi, Electronics, , Determining heater/reflector focus 20190812_151316.jpg20190812_151258.jpg
I took images of the heat pattern projected on a piece of paper produced by the semi-circle reflector. I used 108V to drive current throught he
heater. I tested the reflector without any coating and then with the dull and shiny sides of Al foil. I wasn't able to test the focal-point cut reflector
because I had to glue a screw to it with epoxy which cures overnight. I will do these measurements tomorrow. Figure 2 shows the setup I used to get
Entry  Fri Aug 16 17:05:14 2019, Edita Bytyqi, Electronics, , FLIR Images of new reflector focusing heat 
We got 11 new semi-circle cut reflectors of radius ~3.6 cm. I glued a screw to the back of one reflector using the same epoxy as for the previous reflectors.
Due to the bigger ROC of the reflector, a tight focus is achievable at greater distances (~15 cm).
ELOG V3.1.3-