Entry  Thu Jul 15 20:06:37 2010, James K, Misc, Hartmann sensor, SURF Log: Thermally Induced Defocus Experiments pydefoc.mpyanalyze.mpyimportsingle.mpyimportM.mframesumexport2.py
A quick write-up on recent work can be found at: Google
Docs
 
Entry  Thu Jul 22 21:46:55 2010, James Kunert, Misc, Hartmann sensor, Hartmann Sensor Thermal Defocus Measurement Noise & Ambient Light Effects 72210b_ambient.png
As discussed during the teleconference, a series of experiments have been conducted which attempt to measure the thermally induced defocus in the Hartmann
sensor measurement. However, there was a limiting source of noise which caused a very large displacement of the centroids between images, making the images
much too noisy to properly analyze.
Entry  Mon Jul 26 18:47:12 2010, James K, Misc, Hartmann sensor, Hex Grid Analysis Errors and Thermal Defocus Noise centerror.PNGcentinit.pnghexgrid.png72010a.png72010a_nohex.PNG
My previous eLog details how the noise in Hartmann Sensor defocus measurements appears to vary with ambient light. New troubleshooting analysis reveals
that the rapid shifts in the noise were still related to the ambient light, sort of, but that ambient light is not the real issue. Rather, the noise
was the result of some trouble with the centroiding algorithm.
Entry  Tue Aug 17 22:34:14 2010, rana, Misc, General, ETM temperature after a 1W step etmt.swf
This attachment is a Shockwave Flash animation of the iLIGO ETM getting a 1 W beam with a 3.5 cm radius getting fully absorbed onto the surface at t
= 0.
Entry  Thu Feb 24 14:20:55 2011, Aidan, Misc, Ring Heater, aLIGO H2 Ring Heater Pics aLIGO_Ring_Heaters.zip
 Here are some pictures of the ring heater segments destined for the H2 Y-arm this year.
 These still need to be put onto ResourceSpace.
    Reply  Tue Mar 1 10:47:18 2011, Aidan, Misc, Hartmann sensor, Electron to Counts conversion efficiency 
Using some of the old data from James (attached below), I calculated the CCD conversion efficiency (CE) from electrons to bits (Counts).
Number of electrons(Ne) = QE*Number of Photons(Np)
noiseE = sqrt(Ne);
Entry  Tue Nov 29 09:13:49 2011, rana, Misc, LIGO 3G, Switching from CO2 to shorter wavelength solid state laser 
 Around a year ago, Phil and I discussed the possibility of using an OPO to possibly generate our own laser beam at ~2 microns for TCS. This was
to avoid all of the usual hassle of the 10 micron CO2 laser.
As it turns out, the 1.5-3 micron range doesn't have enough absorption in fused silica: the absorption depth would be basically the whole thickness
Entry  Tue Jun 5 17:25:43 2012, Alex Mauney, Misc, aLIGO Modeling, 6/5/12 Daily Summary 
- Had a meeting to talk about the basics of LIGO (esp. TCS) and discuss the project
- Created COMSOL model for the test mass with incident Gaussian beam.
- Added a ring heater to the previous file
Entry  Wed Jun 6 16:54:09 2012, Alex Mauney, Misc, aLIGO Modeling, 6/6/12 Daily Summary 
- Got access to and started working with SIS on Rigel1
- Fixed SVN issues
- Refined COMSOL model parameters and worked on a better way to implement the heating ring to get the astigmatic heating pattern.
Entry  Thu Jun 7 00:23:11 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 5 and June 6, 2012 
 June 5
-Discussed the actual project outline 
-Installed Comsol on the system
Entry  Thu Jun 7 16:50:16 2012, Alex Mauney, Misc, aLIGO Modeling, 6/7/12 Daily Summary 
- Created a COMSOL model with thermal deformations
- Added non-symmetrical heating to cause astigmatism
- Worked on a method to compute the optical path length changes in COMSOL
Entry  Thu Jun 7 23:24:56 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 7, 2012 
-Created a COMSOL model for variation of temperature in two mass system.
-Used the above model for cryogenic conditions.
-checked it analytically.
Entry  Fri Jun 8 16:36:47 2012, Alex Mauney, Misc, aLIGO Modeling, 6/8/12 Daily Summary 
- Tried to fix COMSOL error using the (ts) module, ended up emailing support as the issue is new in 4.3
- Managed to get a symmetric geometric distortion by fixing the x and y movements of the mirror to be zero (need to look for a better way to do
this as this may be unphysical)
Entry  Fri Jun 8 23:51:13 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 8, 2012 
-Created a COMSOL model for cryogenically shielded test mass with compensation plate.
-Analyzed the behavior of the model in different size configurations.
Entry  Mon Jun 11 17:11:01 2012, Alex Mauney, Misc, aLIGO Modeling, 6/11/12 Daily Summary 
- Fixed the (ts) model, got strange results that indicate that the antisymmetric heating mode is much more prominent than previously thought
- Managed to get COMSOL data through matlab and into SIS
 
Entry  Mon Jun 11 20:53:31 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 11, 2012 
 -Continued with the same cryogenic model created and varied the length of  outer shield and studied the temperature variation inside.
-Compared the temperature difference given by COMSOL with manually calculated one.
Entry  Wed Jun 13 16:36:14 2012, Alex Mauney, Misc, aLIGO Modeling, 6/12 and 6/13 Daily Summary 
- Realized that the strange deformations that we were seeing only occur on the face nearest the ring heater, and not on the face we are worried about
(the HR face)
- Read papers by Morrison et al. and Kogelnik to get a better understanding of the mathematics and operations of the optical cavity modeled in
Entry  Thu Jun 14 05:37:30 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 13, 2012 
-Derived formula for manual calculation of temperature due to total influx.
-Compared the results by COMSOL and by the formula.
Entry  Thu Jun 14 16:51:03 2012, Alex Mauney, Misc, aLIGO Modeling, 6/14/12 Daily Summary SIS_Outputs.txtAssymetric_Heating_Line_Graph.png
- Plugged the output of the model with uniform heating into SIS using both modification of the radius of curvature, and direct importation of deflection
data
- Generated a graph for asymmetric heating and did the same
Entry  Mon Jun 18 16:30:36 2012, Alex Mauney, Misc, aLIGO Modeling, 6/18/12 Daily Summary 
- Verified that the SIS output does match satisfy the equations for Gaussian beam propagation
- Investigated how changing the amount of data points going into SIS changed the output, as well as how changes in the astigmatic heating effect
the output
Entry  Mon Jun 18 23:42:39 2012, Aditi Mittal, Misc, LIGO 3G, Cryogenic Shielding 
 -Read about blue team design for maximum power budget.
-Read third generation talks to get a better understanding of the work. 
Entry  Tue Jun 19 16:24:52 2012, Alex Mauney, Misc, aLIGO Modeling, 6/19/12 Daily Summary 
- Did more modeling for different levels of heating and different mesh densities for the SIS input.
- Lots of orientation stuff
- Started on progress report.
Entry  Wed Jun 20 16:44:58 2012, Alex Mauney, Misc, aLIGO Modeling, 6/20/12 Daily Summary TS_model_deformation_line_graph_2W_10%.pngTS_model_deformation_line_graph_2W_10%_sym.pngTS_model_deformation_line_graph_2W_10%_antisym.pngTS_model_deformation_contour_graph_2W_10%.pngHTSM_model_deformation_contour_graph_2W_10%.png
- Attended a lot of meetings (Safety, LIGO Orientation)
- Finished draft of week 3 report (images attached)
 
Entry  Thu Jun 21 11:16:27 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 19 and 20, 2012 temp_of_test_mass.png
 -Attented LIGO orientation meeting and safety session.
-Prepared 3 week report
 
Entry  Thu Jun 21 16:54:45 2012, Alex Mauney, Misc, aLIGO Modeling, 6/21/12 Daily Summary 
- Paper edits and more data generation for the paper (lower resolution grid data)
- Attended a talk on LIGO
 
Entry  Thu Jun 21 18:35:44 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 21, 2012 
 -Updated 3 week progress report with new additions and deletions.
-Attended LIGO lecture which was very interesting and full of information.
Entry  Tue Jun 26 17:55:44 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 26, 2012 
- Discussed the further project with Dr. Brooks.
-Tried to derive formula for the test mass inside cryogenic shield(infinitely long shield from one side)
 
Entry  Wed Jun 27 16:43:56 2012, Alex Mauney, Misc, aLIGO Modeling, 6/27/12 Daily Summary 
Plan for building the model
- Find the fields that would be incident on the beam splitter from each arm (This is done already)
- Propagate these through until they get to the OMC using the TELESCOPE function in SIS
Entry  Thu Jun 28 16:27:37 2012, Alex Mauney, Misc, aLIGO Modeling, 6/28/12 Daily Summary 
- Finished the MatLab code that both combines two fields and simulates the adjustment of the beamsplitter to minimize the power out (with a small offset).
- Added the signal recycling telescope to the SIS code that generates the fields
To Do: Make the OMC cavity in SIS
Entry  Fri Jun 29 15:51:24 2012, Aditi Mittal, Misc, LIGO 3G, Summary June 28 and 29, 2012 pipelength_power.xlsx6week_plan.doc
 -Discussed the project outline for next 6 weeks.
-made a write up for the tasks. (attached)
-Analyzed the variation of temperature of the test mass with input power for different lengths of the shield. 
Entry  Mon Jul 9 16:54:17 2012, Alex Mauney, Misc, aLIGO Modeling, 7/9/12 Summary 
Made a COMSOL model that can include CO2 laser heating, self heating, and ring heating
Figured out how to run SIS out of a script and set up commands to run the two SIS stages of the model
Entry  Thu Sep 21 18:56:53 2017, awade, Misc, Borrowed, Borrowed thorlabs power meter 
Borrowed thorlabs power meter on 21 Sep 2017.  It is on the south table of the ATF lab.
Entry  Fri Oct 26 09:49:47 2018, Aidan, Misc, Optics, Starting 80C cure of epoxy IMG_7054.jpg
I've started an 80C cure of two materials bonded by EPOTEK 353ND. The objective is to see (after curing) how much the apparent glass transition
temperature is increased over a room-temperature cure.
Entry  Wed Oct 30 12:13:14 2019, Jon, Misc, Delivery Note, New lab hardware IMG_3782.jpgIMG_3783.jpgIMG_3784.jpgIMG_3785.jpg
Ian and I moved some new hardware into the lab, shown in the below photos. It is from the shipment of loaned
equipment recently returned by Whitman College. 

Attachment 1:
Entry  Mon Jul 26 16:23:03 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room IMG_3881.MOV
 



Koji: QIL/TCS entrance flooding. Check your lab
    Reply  Tue Jul 27 08:39:33 2021, Aidan, Misc, Flood, Tuesday (27-Jul) morning check - lab looks okay Image_Pasted_at_2021-7-27_08-38-2.jpegImage_Pasted_at_2021-7-27_08-38.jpeg
I checked the lab this morning. It was dry and there wall was in the same state as yesterday.
    Reply  Wed Aug 25 11:28:56 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 
11:29AM - Lab has flooded again this morning. I'm calling PMA. Looks to be the same issue as before.




Quote:



 
    Reply  Thu Aug 26 09:00:39 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 20210825_-_TCS_Lab_Flood_-_compressed.pdf
Some photos of water and clean-up.

Summary: I came into the lab around 11:30AM and found water on the floor in the changing room outside QIL/TCS. Turns out the condesation overflow
pipe from the AC blew out again. This time near the ceiling. Water was on the floor but also had sprayed a little onto the tool chest and East optical
Entry  Tue Aug 17 16:31:55 2010, Aidan, Things to Buy, Laser, Bought a laser diode from Thorlabs for HWS 
http://www.thorlabs.com/thorProduct.cfm?partNumber=CPS180
I bought this laser diode from Thorlabs today to try the current modulation trick Phil and I discussed last Friday. 
That is:
    Reply  Mon Aug 23 08:43:16 2010, Aidan, Things to Buy, Laser, Bought a laser diode from Thorlabs for HWS 
It arrived on Friday.


    
        
            Quote:
        
        
            
Entry  Fri Feb 18 13:26:23 2011, Aidan, Things to Buy, Delivery Note, First parts of Bosch framing have arrived from Valin Packing_List_01.pdf
The first pieces of the Bosch framing have arrived from Valin Corporation. These are just small pieces such as the fasteners and the gussets. There are
no custom lengths of framing yet.
The details are in the attached Packing List. [1:25PM] I haven't verified that everything is there yet.
    Reply  Wed Feb 23 18:04:38 2011, Aidan, Things to Buy, Delivery Note, First parts of Bosch framing have arrived from Valin Packing_List_02.pdf


    
        
            Quote:
        
        
            

           The first pieces of the Bosch framing have arrived from Valin Corporation. These are just small pieces such as the fasteners and the gussets.
Entry  Thu Feb 24 13:35:41 2011, Aidan, Things to Buy, Delivery Note, Bosch framing has arrived Packing_List_03.pdf
 The custom pieces of the Bosch framing have arrived. Transportation is currently moving them downstairs to the lab. The packing list is attached.
 
 
Entry  Tue Mar 1 11:19:34 2011, Aidan, Things to Buy, Delivery Note, MFF001 flipper mirror has arrived Flipper_mirror_delivery_notice.pdf
 The Thorlabs MFF001 flipper mirror recommended by Bram has arrived. The delivery note is attached.
Entry  Tue Mar 1 11:21:37 2011, Aidan, Things to Buy, Delivery Note, More Bosch framing parts - angle connectors Packing_List_04.pdf
 Another box of Bosch framing parts arrived today. The delivery note is attached.
Entry  Tue Mar 8 18:57:50 2011, Aidan, Things to Buy, Delivery Note, Fiber optics cable and Bosch Fastener deliveries_2011-03-08.pdf
 
Entry  Mon Apr 4 13:13:23 2011, Aidan, Things to Buy, Delivery Note, Newfocus 5102 mirrors and Firewire extension cable have arrived receipt_mirrors.pdf
 See attached delivery note ...
Entry  Sun Apr 17 14:59:36 2011, Aidan, Things to Buy, Delivery Note, L-Com patch panel, Newport lenses, Thorlabs fibers delivery notes newport_lenses_2011-03.pdfL-Com_patch_panel_-_2011-03.pdfthorlabs_fiber_optic_cables_2011-03.pdf
 
Entry  Mon Apr 18 15:06:53 2011, Aidan, Things to Buy, Hartmann sensor, Ordered 2" optics from Newport 
 Given that the HWS requires several 2" optics to handle the big beam size, I've ordered the following items from Newport:

    2x 2" 50/50 beam splitter: 20B20BS.2
    6x 2" NIR mirrors: 
Entry  Mon Jul 22 18:44:53 2019, Edita Bytyqi, Things to Buy, General, Need to Order Gloves 