40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog, Page 1 of 5  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tue Feb 28 09:44:43 2023, Aidan, Lab Infrastructure, General, Added lighting and tidied West Desk IMG_3670.jpg
Entry  Thu Jan 12 11:52:47 2023, Koji, Lab Infrastructure, General, How to move the large engine hoist through the narrow door 
Entry  Wed Jul 13 15:19:49 2022, JC, Electronics, General, Desktop Computer  
Entry  Fri Jul 8 07:06:41 2022, Jc, Misc, VAC, Dewar 29FCB85E-0AC8-43ED-8A43-31DC04459CD4_1_201_a.jpeg
Entry  Thu Jun 23 10:53:17 2022, JC, Lab Infrastructure, General, Seat For Photodiode Testing 62AE8A4B-F817-4A03-A2F1-AE48B97FB935.jpgIMG_1392_2.jpg
Entry  Fri May 20 16:42:47 2022, Stephen, Things to Buy, Ordering, Up to Air valve for IR Labs Cryostat 
Entry  Wed May 11 19:46:21 2022, Aidan, Radhika, Jordan, Lab Infrastructure, Vacuum chamber, Leak cleaning on IR labs vacuum chamber - suspects IMG_8812.jpgIMG_8799.jpgIMG_8789.jpgIMG_8805.jpg
Entry  Wed Apr 27 11:41:53 2022, Aidan, Lab Infrastructure, General, Lab clean-up to get ready for PD testing in old TCS Lab IMG_8599.jpgIMG_8598.jpgIMG_8596.jpgIMG_8595.jpgIMG_8600.jpg
Entry  Mon Jul 26 16:23:03 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room IMG_3881.MOV
    Reply  Wed Aug 25 11:28:56 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 
       Reply  Thu Aug 26 09:00:39 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 20210825_-_TCS_Lab_Flood_-_compressed.pdf
Entry  Thu Aug 12 16:13:44 2021, Aidan, Lab Infrastructure, Flood, Carpentry shop removed wet plaster sections from the wall - it's drying for a few days IMG_4139.jpg
Entry  Tue Jul 27 08:39:33 2021, Aidan, Misc, Flood, Tuesday (27-Jul) morning check - lab looks okay Image_Pasted_at_2021-7-27_08-38-2.jpegImage_Pasted_at_2021-7-27_08-38.jpeg
Entry  Tue Jun 15 08:47:27 2021, Aidan, Lab Infrastructure, General, Cleaned up HWS table in preparation for lab move IMG_3056.jpg
Entry  Wed Oct 30 12:13:14 2019, Jon, Misc, Delivery Note, New lab hardware IMG_3782.jpgIMG_3783.jpgIMG_3784.jpgIMG_3785.jpg
Entry  Tue Sep 3 10:49:57 2019, Aidan, Lab Infrastructure, General, Exhaust duct added for new bake area in TCS lab IMG_1627.jpgIMG_1629.jpgIMG_1628.jpgIMG_1626.jpg
Entry  Fri Aug 16 17:05:14 2019, Edita Bytyqi, Electronics, , FLIR Images of new reflector focusing heat 
Entry  Mon Aug 12 21:15:12 2019, Edita Bytyqi, Electronics, , Determining heater/reflector focus 20190812_151316.jpg20190812_151258.jpg
Entry  Fri Aug 9 20:33:11 2019, Jon, Electronics, Ring Heater, Power-regulated heater ready to use IMG_3576.jpgIMG_3577.jpg
Entry  Tue Aug 6 19:22:28 2019, Jon, Electronics, Computing, QIL NFS server set up 
Entry  Thu Aug 1 15:20:39 2019, Edita Bytyqi, Lab Infrastructure, Optics, Reflector Mount and DC Supply 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg
Entry  Mon Jul 29 18:53:16 2019, Edita Bytyqi, Lab Infrastructure, Optics, Mounted Reflector and Heater 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg
Entry  Mon Jul 22 18:44:53 2019, Edita Bytyqi, Things to Buy, General, Need to Order Gloves 
    Reply  Thu Jul 25 09:13:36 2019, Jon, Things to Buy, General, Need to Order Gloves 
Entry  Wed Jul 24 16:25:13 2019, Edita Bytyqi, Lab Infrastructure, Optics, Updated 2-lens setup 20190724_161926.jpg
Entry  Mon Jul 22 18:46:23 2019, Edita Bytyqi, Lab Infrastructure, , Laser-Lens-HWS Setup 20190722_183933.jpg20190722_183928.jpg
Entry  Mon Jul 22 09:44:21 2019, Jon, Lab Infrastructure, Computing, Installed Amplifying VGA Splitter IMG_3522.jpgIMG_3421.jpg
Entry  Tue Jun 18 19:05:16 2019, Jon, Lab Infrastructure, General, Large optical table cleared and set up for point absorbers IMG_3421.jpg
Entry  Mon Jun 17 20:29:34 2019, Jon, Lab Infrastructure, Computing, Server rack cleaned up, new workstation installed IMG_3419.jpg
Entry  Thu May 23 11:36:49 2019, agupta, Lab Infrastructure, Borrowed, Borrowed Label Maker 
Entry  Fri Apr 12 17:40:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station BakeStation_Page_1.jpgBakeStation_Page_2.jpg
    Reply  Mon Apr 15 08:12:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station 
Entry  Fri Feb 8 10:48:33 2019, Aidan, Lab Infrastructure, General, Water damage repair work in the TCS Lab 
Entry  Tue Dec 4 16:57:08 2018, Aidan, Computing, Hartmann sensor, Updated GIT version of HWS code 
Entry  Fri Oct 26 09:49:47 2018, Aidan, Misc, Optics, Starting 80C cure of epoxy IMG_7054.jpg
Entry  Thu Aug 16 11:52:27 2018, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 
    Reply  Wed Oct 17 16:17:45 2018, awade, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 TCSIOCFILS.tar.gz
Entry  Fri Aug 3 15:46:12 2018, Aria Chaderjian, Laser, General, August 3, 2018 
Entry  Tue Jul 24 16:52:44 2018, Aria Chaderjian, Laser, General, July 23, 2018 and July 24, 2018 
Entry  Mon Jul 23 10:04:19 2018, Aria Chaderjian, Laser, General, July 20, 2018 37767216_2077953269190954_5080703241788850176_n.jpg
Entry  Fri Jul 13 16:42:50 2018, Aria Chaderjian, Laser, General, July 13, 2018 
Entry  Thu Jul 12 18:48:21 2018, Aria Chaderjian, Laser, General, July 12, 2018 
Entry  Tue Jul 10 17:49:13 2018, Aria Chaderjian, Laser, General, July 10, 2018 IMG_4518.jpgIMG_4517.jpg
Entry  Thu Jun 21 17:12:38 2018, Aidan, Laser, Hartmann sensor, Two inch PBS from Edmund Optics - effect on ETM HWS transmission PBS_Thorlabs_v_EdmundOptics.pdf
Entry  Thu Nov 9 14:18:56 2017, Aidan, Computing, DAQ, FB4 ip address has changed 
    Reply  Wed May 30 18:59:49 2018, awade, Computing, DAQ, FB4 ip address has changed 
Entry  Mon Feb 5 15:08:06 2018, Aidan, Computing, DAQ, Frame builder clock is totally wrong 
    Reply  Wed May 30 18:50:05 2018, awade, Computing, DAQ, Rebooted fb4 
Entry  Fri May 11 12:32:21 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher LED_test_01_20180511.pdf
    Reply  Fri May 11 16:18:47 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher LED_test_02_20180511.pdf
       Reply  Wed May 16 16:47:29 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher - D1800125-v5_SN01 HWS_LED_D1800125_V5_sn01.pdfHWS_LED_D1800125_V5_sn01.mHWS_D1800125-v5_sn01_characterize_20180516.tar
          Reply  Fri May 18 16:32:37 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher - D1800125-v5_SN01 
Entry  Thu Feb 8 15:42:13 2018, Aidan, Laser, Laser, Low power CO2 laser [400mW] beam size measurement L3_CO2_laser_beam_size.mL3_CO2_Laser_154507-154935.pdf
Entry  Thu Jan 18 10:09:50 2018, Jon Richardson, Laser, General, RIN Measurement of 400 mW CO2 Laser in Progress 
    Reply  Mon Jan 22 10:39:32 2018, Jon Richardson, Laser, General, RIN Measurement of 400 mW CO2 Laser in Progress SRM_CO2_RIN_v1.pdf
Entry  Tue Nov 14 19:08:00 2017, Jon Richardson, Computing, Network architecture, Rsync Server for Automatic LDAS Backups 
Entry  Tue Oct 31 14:37:49 2017, Aidan, Computing, DAQ, New Acromag units for AWC experiments - XT1221 ans XT1541 
Entry  Mon Oct 30 17:13:32 2017, Jon Richardson, Laser, Hartmann sensor, Write-Up of CO2 Projector Measurements awc_srm_actuator_v1.pdf
Entry  Thu Oct 26 10:21:28 2017, Aidan, Computing, , Beam size EPICS channels added to TCS-WS softIoc 
    Reply  Thu Oct 26 10:31:31 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc 
       Reply  Thu Oct 26 10:45:44 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc FullSizeRender_10.jpg
Entry  Wed Oct 25 15:34:14 2017, Jon Richardson, Computing, Frame Grabber, Mako CCD Camera Code is Fixed 
Entry  Tue Oct 24 15:05:57 2017, Jon Richardson, Computing, Electronics, Installed a Realtime Beam Profiler for the Mako CCD Camera 
ELOG V3.1.3-