  40   Thu May 20 10:44:13 2010 AidanElectronicsSLEDQPhotonics 980nm source power

dV = 0.385V

Responsivity= 0.65A/W

Transimpedance = 1.5E4 V/A

therefore power= 0.385V / (1.5E4 * 0.65 V/W) = 40uW

 

 

  41   Thu May 20 17:08:36 2010 AidanElectronicsSLEDSLED module - and driver - LIGO D1000892 - and Hartmann sensor

Verified that the test-point for the current limit pot on the driver (Wavelength Electronics - LDTC 0520) was at 0.5V. Driver is set to INTERNAL set point at the moment. This is down about 10% below the current limited point.

Voltage across TP7 and TP9 = 0.970V = LD Current Mon

Voltage across TP2 and TP3 = 0.017V = LD P Mon

 

--- Hartmann sensor ---

-set the sampling rate on the CCD to 16HZ. With the current alignment and intensity this gives as maximum intensity of around 3850 out of 4095. Thus the pixels are not saturated.

- centroid_image located some of the spots - see attached image of spots where those located by the algorithm and circled. I need to play with the threshold level and spot_radius to get this to work properly.

 

 

Attachment 1: 2010-05-20_hartmann_image_and_located_spot.jpg
2010-05-20_hartmann_image_and_located_spot.jpg
  45   Thu May 27 08:25:37 2010 AidanElectronicsHartmann sensorHartmann sensor cooling fins added - base piece removed

 8:10AM - I removed the base plate from the Hartmann sensor. I want to know what steady-state temperature the HWS achieves without the plate.

The photo below shows the current configuration.

11:22AM - (Digitizer - 52.2C, Sensor - 43.8C, Ambient - 21.8C)

Attachment 1: HWS_CONFIG2.jpg
HWS_CONFIG2.jpg
  46   Thu May 27 13:18:51 2010 AidanElectronicsHartmann sensorRemoved Cooling fins from Hartmann sensor

I removed the cooling fins from the Hartmann sensor to see what steady-state temperature it reached without any passive cooling elements. I also dropped the set-point temperature for the lab to help keep for getting too hot.

After nearly 3 hours the temperature is:

(Digitizer: 54.3C, Sensor: 46.6C, Ambient: 19.6C)

 

 

Attachment 1: HWS_CONFIG3.jpg
HWS_CONFIG3.jpg
  47   Thu May 27 15:42:06 2010 AidanElectronicsHartmann sensorHartmann sensor with just the base piece

I switched in just the base piece of the Hartmann sensor. The cooling fins are removed. I bolted the camera securely to the base plate and I bolted the plate securely to the table.

 5:00PM - (Digitizer = 41.9C, Sensor = 33.8C, Ambient = 19.3C)

 

Attachment 1: HWS_CONFIG4.jpg
HWS_CONFIG4.jpg
  48   Thu May 27 17:49:02 2010 AidanElectronicsHartmann sensorHartmann sensor cooling fins added - base piece added

 Back to Configuration 1 again - this time the fins were bolted very securely to the camera.

 7:25 PM - [about 2 hours later] - Digitizer = 39.7C, Sensor = 31.4C, Ambient = 19.0C

 

 

Attachment 1: HWS_CONFIG1-tight.jpg
HWS_CONFIG1-tight.jpg
  74   Sat Jul 24 10:50:14 2010 AidanElectronicsHartmann sensorLab Temperature and HWS temperature: pre-indium

 Hour-long trend puts the lab temperature at 19.51C

Dalsa temperature:

 

Camera Temperature on Digitizer Board: 41.0 Celsius
Camera Temperature on Sensor Board: 32.9 Celsius
OK>
 
There is currently no Indium in the HWS.

 

  77   Mon Jul 26 12:17:25 2010 AidanElectronicsHartmann sensorAdded Indium to HWS

 I added some 0.004" thick indium sheet to the copper heat spreaders and and the heat sinks on the side of the HWS to try and improve the thermal contact. Once installed the steady state temperature of the sensor was the same as before. It's possible that the surface of the copper is even more uneven than 0.004".

 

 

Attachment 1: indium-01.jpg
indium-01.jpg
Attachment 2: indium-03.jpg
indium-03.jpg
Attachment 3: indium-05.jpg
indium-05.jpg
Attachment 4: indium-02.jpg
indium-02.jpg
Attachment 5: indium-04.jpg
indium-04.jpg
  79   Tue Jul 27 08:31:10 2010 AidanElectronicsSLEDLong term SLED test - Day 1

 The measurement from the on-board PD of the Superlum SLED seems to be falling. This effect started around 5PM last night which is right about the time we moved the position of the PD that the SLED is illuminating on the optical table (via optical fiber).

Curiously, the current set point and delivered current to the SLED are dropping as well. 

Attachment 1: SLED_superlum_long_term_test_0002A.pdf
SLED_superlum_long_term_test_0002A.pdf
  80   Wed Jul 28 18:32:12 2010 AidanElectronicsSLEDSLED long term test - Day 2

Here's the data from the last 2 1/2 days of running the SLED. The decrease in photo-current measured by the on-board photo-detector is consistent with the decrease in the current set-point and the delivered current, but it is not clear why these should be changing.

Strictly speaking I should add some analysis that shows that delta_PD_voltage_measured = delta_I_set_measured * [delta_PD_voltage/delta_I_set (I_set)]_calculated ...

Attachment 1: SLED_superlum_long_term_test_0003A.pdf
SLED_superlum_long_term_test_0003A.pdf
  81   Thu Jul 29 10:09:19 2010 AidanElectronicsSLEDSLED long term test - Day 2

I've attached the Acceptance Test Report data from SUPERLUM for this SLED. I've also determined the expected percentage decrease in power/photo-current per mA drop in forward current.

The measured decrease in forward current over the last 2 1/2 days is around 1.4mA from around 111mA. The expected drop in power is thus (4.5% per mA)*(1.4mA) = 6.3%.

The drop in photo-current is around 37.5mA to 35mA = 2.5mA. The percentage drop is around 100*(2.5mA)/(36.3mA) = 6.9%. 

Therefore, the drop in measured power is consistent with what we would expect given the decrease in forward current (which is consistent with the drop in the set point). Why the set-point is dropping is still a mystery.

Quote:

Here's the data from the last 2 1/2 days of running the SLED. The decrease in photo-current measured by the on-board photo-detector is consistent with the decrease in the current set-point and the delivered current, but it is not clear why these should be changing.

Strictly speaking I should add some analysis that shows that delta_PD_voltage_measured = delta_I_set_measured * [delta_PD_voltage/delta_I_set (I_set)]_calculated ...

 

Attachment 1: superlum_SLED_ATR.pdf
superlum_SLED_ATR.pdf
  104   Tue Jan 25 16:38:16 2011 AidanElectronicsPre-amplifierL1 TCSY ISS Board transfer function

 I measured the AC and DC channel transfer functions of the eLIGO L1 TCSY ISS board for PD1 and PD2. The gain is quite high on the AC channels so I added +40dB of attenuation to the source from the SR785. As Frank pointed out, even though this isn't exactly +40dB at low frequencies, it still attenuates and that attenuation is common to both the input to the Channel 1 of the SR785 and the input to the ISS board.

The results are shown in the attached plot. I didn't bother including the phase, I'm just interested in the magnitude for calibration purposes.

 The original data files from the SR785 are attached below: 

Channel Name Filename
L1 TCSY PD1 - AC SRS003.78D
L1 TCSY PD2 - AC SRS004.78D
L1 TCSY PD1 - DC SRS005.78D
L1 TCSY PD2 - DC SRS006.78D

 

Attachment 1: L1TCS_ISS_boards_transfer_functions.pdf
L1TCS_ISS_boards_transfer_functions.pdf
Attachment 2: SRS003.78D
Attachment 3: SRS004.78D
Attachment 4: SRS005.78D
Attachment 5: SRS006.78D
  105   Tue Feb 8 13:02:26 2011 AidanElectronicsDelivery NoteThorlabs S322C 200W power head arrived

 The 200W Thermopile power head from Thorlabs arrive today. The scanned delivery note and calibration info are attached.

Attachment 1: Co2_200W_power_meter_delviery_note.pdf
Co2_200W_power_meter_delviery_note.pdf
Attachment 2: Co2_200W_power_meter_calibration_info.pdf
Co2_200W_power_meter_calibration_info.pdf
  109   Wed Feb 23 20:18:30 2011 AidanElectronicsHartmann sensorSuccessfully re-started the Hartmann sensor

 I reattached the Hartmann Sensor to the LENOVO machine that is running Ubuntu and turned it on (it's been disconnected for a couple of months). The /opt/EDTpdv/serial_cmd was able to communicate successfully with the camera.

  119   Tue Mar 1 17:05:45 2011 AidanElectronicsHartmann sensorDalsa 1M60 current draw

Steve and I measured the current drawn by the Dalsa 1M60 by connecting it to the BK Precision 1735 lab power supply that display current and voltage supplied. We tried the camera at a variety of different voltages. The results are presented below:

Voltage  Current(t<5s)  Current(5s<t<10s)   Current(t>10s)

12.7V       0.6A              0.8A              1.11A

15.0V       0.55A             0.69A             0.91A

18.0V       0.41A             0.57A             0.75A

20.0V       0.42A             0.52A             0.67A

Additionally, we tried running the other camera with the lab power supply. I varied the exposure mode and exposure time and checked the current drawn. The supplied voltage was 18.0V.

Exposure Mode 4: current = 0.67A

Exposure Mode 2: 58Hz, exposure time = 16 ms, current = 0.70A

Exposure Mode 2: 58Hz, exposure time = 100 us, current = 0.72A

Exposure Mode 2: 1Hz, exposure time = 998 ms, current = 0.68A

Exposure Mode 2: 1Hz, exposure time = 16 us, gm 0, current = 0.69A

Exposure Mode 2: 1Hz, exposure time = 16 us, gm 2, current = 0.69A

  150   Thu May 26 11:56:46 2011 AidanElectronicsLaserGreen Laser Pointer beam profile

This measurement was made with the Thorlabs DCC1545M-GL camera with an RG850 3mm long-pass filter over the CCD.

The beam radius (w) is 191 pixels, where the beam intensity = exp[-2 (x/w)^2 ]

The pixel size is 5.2um. Hence the beam size is 993.2um, which is basically near enough to 1mm radius.

 

Attachment 1: green_laser_pointer.bmp
Attachment 2: green_laser_pointer.pdf
green_laser_pointer.pdf
Attachment 3: Screen_shot_2011-05-26_at_12.28.20_PM.png
Screen_shot_2011-05-26_at_12.28.20_PM.png
  155   Fri Sep 2 21:41:01 2011 AidanElectronicsHartmann sensorRestarting long term test of QFLD-950-3S

9:40PM PDT - I've just restarted the long term measurement of the Hartmann sensor noise with the QFLD-950-3S.

 

  184   Wed Apr 26 15:29:25 2017 AidanElectronicsHartmann sensorLong term test of fiber launcher

I've started a long-term measurement of the HWS fiber-launcher. I'm interested in seeing how stable the output is. The HWS is currently running in the following configuration:

  • SLED: QFLD-635-1S (635nm, 1mW) - current driver set to 38.02mA, thermistor set point = 10.778kOhm
  • SLED coupled to patch cable
  • Patch cable coupled to Newport fiber launcher FPR1-C1A which contains a FPH-CA4 fiber optic chuck (FC/APC connector). All grub screws are tighten on this (two for holding chuck, one for roll motion, one for X translation lock and one for Y translation lock)
  • Output of fiber hits a 100m focal length lens (SPX043AR.16 BBAR 0.65 - 1.0um) placed approximately 100mm from the fiber output
  • Output of lens is projected approximately 125mm onto the HWS where it is centered on the HWS plate

The HWS is currently running at 57Hz. The HWS code is running on HWS (10.0.1.167). It is the same as the site code with some modifications to determine information about the Gaussian beam envelope. The following data is written to file on the HWS machine in files containing 10,000 cycles. Each cycle (or row) the following data is recorded:

  • GPS TIME
  • PRISM_X
  • PRISM_Y
  • SPHERICAL_POWER
  • CYLINDRICAL_POWER 
  • Envelope peak intensity
  • Envelope X centroid
  • Envelope Y centroid
  • Envelope X width
  • Envelope Y width

These are saved to files on the HWS machine: ~/framearchive/C4/HWSlongterm/<GPSTIME>_CIT_HWS.txt

  185   Wed May 24 09:58:17 2017 AidanElectronicsElectronicsTemperature sensor batteries swapped in TCS Lab

I noticed that the TCS lab temperature sensor batteries died. Apparently they died two days ago. I swapped in some new batteries this morning.
 

  187   Thu Jul 13 10:11:57 2017 awadeElectronicsBorrowedBorrowed newport TrueRMS Supermeter

I lent your fancy Newport TrueRMS Supermeter with the thermocouple plugs on the top to the SURF student Jordon.  He has it in the cryo lab or the EE workshop with one of the PSL lab temperature probes.

Attachment 1: 2017-07-13_10.06.28.jpg
2017-07-13_10.06.28.jpg
Attachment 2: 2017-07-13_10.06.29.jpg
2017-07-13_10.06.29.jpg
  238   Tue Aug 6 19:22:28 2019 JonElectronicsComputingQIL NFS server set up

I've started building the NFS server for the QIL cymac. It's sitting on the workbench in the TCS lab next to the rack. Please don't move it or any of the parts behind it.

  239   Fri Aug 9 20:33:11 2019 JonElectronicsRing HeaterPower-regulated heater ready to use

Despite some considerable time spent, I was not able to get the Omega SCR controllers working. The first unit definitely arrived damaged. None of its LED indicator lights ever functioned, despite those on the second controller working fine under the same setup. I tried swapping in the second controller, but it has no voltage output and a red LED is illuminated which, according to the manual, means "malfunction on trigger board" or "open SCR."  Either way, the remedy is to "consult factory."

Since we have get moving with data collection, I installed a simple variable transformer (borrowed from the 40m) which steps up/down the AC voltage from 0-120 V with the turn of a knob. I soldered the leads of one of the heaters to a standard power cable which plugs directly into the transformer. I have tested it and confirmed it to work.

Attachment 1: IMG_3576.jpg
IMG_3576.jpg
Attachment 2: IMG_3577.jpg
IMG_3577.jpg
  240   Mon Aug 12 21:15:12 2019 Edita BytyqiElectronics Determining heater/reflector focus

I took images of the heat pattern projected on a piece of paper produced by the semi-circle reflector. I used 108V to drive current throught he heater. I tested the reflector without any coating and then with the dull and shiny sides of Al foil. I wasn't able to test the focal-point cut reflector because I had to glue a screw to it with epoxy which cures overnight. I will do these measurements tomorrow. Figure 2 shows the setup I used to get the data. The shiny side of Al foil is better at IR, so we will use that for the wavefront measurements.

Attachment 1: 20190812_151316.jpg
20190812_151316.jpg
Attachment 2: 20190812_151258.jpg
20190812_151258.jpg
  241   Fri Aug 16 17:05:14 2019 Edita BytyqiElectronics FLIR Images of new reflector focusing heat

We got 11 new semi-circle cut reflectors of radius ~3.6 cm. I glued a screw to the back of one reflector using the same epoxy as for the previous reflectors. Due to the bigger ROC of the reflector, a tight focus is achievable at greater distances (~15 cm).

  255   Wed Jul 13 15:19:49 2022 JCElectronicsGeneralDesktop Computer

[JC]

The desktop computer is now running Debian Linux

  113   Thu Feb 24 14:23:58 2011 AidanLab InfrastructureHartmann sensorHartmann Sensor box cut down to size

 I reduced the height of the Hartmann sensor box. This is what it looks like now:

 

Attachment 1: P1000109.jpg
P1000109.jpg
Attachment 2: P1000110.jpg
P1000110.jpg
Attachment 3: P1000111.jpg
P1000111.jpg
Attachment 4: P1000113.jpg
P1000113.jpg
  126   Fri Mar 11 13:11:33 2011 AidanLab InfrastructureDelivery NoteMore Bosch connectors have arrived

 See attached delivery note ...

Attachment 1: Packing_List_05.pdf
Packing_List_05.pdf
  127   Wed Mar 16 15:05:47 2011 AidanLab InfrastructureDelivery NoteMore Bosch equipment has arrived

30mm T-junctions, grounding straps and T-slot covers have arrived

Quote:

 See attached delivery note ...

 

Attachment 1: Packing_List_06.pdf
Packing_List_06.pdf Packing_List_06.pdf Packing_List_06.pdf
  143   Thu Apr 28 22:48:47 2011 AidanLab InfrastructureElectronicsBNC Cables from HWS table to rack

 I labelled and strung 8 of the 16 custom 40' BNC cables from L-Com between the HWS table and the BNC feed-through on the rack. Each cable is labelled HWS TABLE CHxx where 01<= xx <= 08. I'm going to leave the other 8 until we have room in the BNC feedthrough on the rack.

  190   Wed Oct 11 20:19:06 2017 Jon RichardsonLab InfrastructureHartmann sensorInitial Characterization of the SRM Adaptive Wavefront Control

Today I made the first characterization measurements of the mocked-up adaptive wavefront control system planned for the signal recycling mirrors.

The Setup

Inside the light-tight enclosure on the center table, I've assembled and aligned a 10.2 micron CO2 projector which provides a heating beam of up to 150 mW incident on an SRM-like test optic. A co-aligned 633 nm probe beam and Hartmann wavefront sensor are used to measure the resulting thermal lens. I've written and installed new software on the machine hws (10.0.1.167) for viewing the wavefront distortion in real time, as shown in the below screenshot. This viewer is launched from the terminal via the command $stream_gradient_CIT

Screenshot of a thermal lens forming on the test optic, as viewed from the real-time software.
To the right is the induced optical path difference across the surface of the test optic, and to the left is its gradient.  

There is also a second utility program for displaying the raw Hartmann sensor CCD image in real time, which is useful for aligning the probe beam. It is launched by the terminal command $stream_intensity_CIT

Initial Thermal Lens Measurements

Lens Formation Time Scale

First, I made a time-resolved measurement of the thermal lens formation on the test optic at maximum heating beam power (150 mW). The lens appears to reach steady-state after 30 s of heating. When the heating beam is turned off, the lens decays on a very similar time scale.

Lens Strength v. Incident Heating Power

Second, I measured the thermal lens strength as a function of incident heating beam power, which I measured via a power meter placed directly in front of the test optic. Below is the approximate maximum optical path difference induced at several heating beam powers.

Incident Power (mW) Maximum Optical Path Difference (nm)
150 +/- 15 35 +/- 5
85 +/- 2 25 +/- 5
50 +/- 4 15 +/- 5
10 +/- 1 5 +/- 5

The above optical path differences are approximate and were read-off from the live display. I recorded Hartmann sensor frame data during all of these measurements and will be analyzing it further.

  191   Fri Oct 13 15:52:41 2017 AidanLab InfrastructureGeneralBroadband mirror BB2-E03 reflectivity at 532nm

I measured the reflectivity of a possible HWS replacement mirror at 532nm. Thorlabs BB2-EO3

Incident power = 1.28mW

Reflected power = 0.73mW

R = 56% at 45 degrees AOI.

 

Attachment 1: IMG_1223.JPG
IMG_1223.JPG
Attachment 2: IMG_1213.JPG
IMG_1213.JPG
  225   Fri Feb 8 10:48:33 2019 AidanLab InfrastructureGeneralWater damage repair work in the TCS Lab

Caltech Facilities has determined that the walls in the SE corner of the TCS Lab in West Bridge were water damaged during last weekend’s rain. They are going to remove the plaster from the walls and dehumidify the area for a week or so. All tables in the room are going to be covered with plastic for this process. In the short term I’ve shutdown all the equipment in the lab (including FB4). The 2-micron cavity-testing fabrication has been moved next door to the QIL.

  226   Fri Apr 12 17:40:58 2019 aaronLab InfrastructureGeneralMeasurements for Bake Station

I drew up one way we could set up the three available bake ovens in the TCS lab on the single oil pump. 

If this looks feasible to others, we can move the ovens into the TCS lab. Duo and I will be occupied at KNI during Tuesday and Monday morning, so the usual lab cleanup time may not be the best. Perhaps Monday afternooon we can at least get the ovens out of the hallway and get one of them set up for baking.

Attachment 1: BakeStation_Page_1.jpg
BakeStation_Page_1.jpg
Attachment 2: BakeStation_Page_2.jpg
BakeStation_Page_2.jpg
  227   Mon Apr 15 08:12:58 2019 aaronLab InfrastructureGeneralMeasurements for Bake Station

My preference is to have tubes back towards the wall where possible. We might be able to drill a large diameter hole in the table top to accommodate them.

We have to get confirmation that the exhaust can be extracted - otherwise this whole thing is moot.

Quote:

I drew up one way we could set up the three available bake ovens in the TCS lab on the single oil pump. 

If this looks feasible to others, we can move the ovens into the TCS lab. Duo and I will be occupied at KNI during Tuesday and Monday morning, so the usual lab cleanup time may not be the best. Perhaps Monday afternooon we can at least get the ovens out of the hallway and get one of them set up for baking.

 

  228   Thu May 23 11:36:49 2019 aguptaLab InfrastructureBorrowedBorrowed Label Maker

I have borrowed TCS's label maker in CTN for few days. If you need it, you can take it from the top of blue cabinets.

  229   Mon Jun 17 20:29:34 2019 JonLab InfrastructureComputingServer rack cleaned up, new workstation installed

In anticipation of the point absorber SURF project, I cleaned up the server rack and installed a new workstation today.

The workstation replaces the old one, whose hard drive had failed, with a more powerful machine. The hostname (tcs-ws), IP address (10.0.1.168), user name (controls), and standard password (written in the secret place) are all the same as before.

I moved the control consol from its old spot in the back corner of the lab to the bench beside the rack. This is a more convenient location because the Hartmann sensor realtime GUIs can now be easily seen from the optical tables. I mounted the HWS machine in the rack as well and reconnected the video multiplexer to all the machines.

I tested the Hartmann sensor Python software and confirmed it to be working. It required a minor bug fix to the realtime gradient field GUI code. It seems that since this script was last run, the input data file type has switched from pickled numpy to HDF5.

Attachment 1: IMG_3419.jpg
IMG_3419.jpg
  230   Tue Jun 18 19:05:16 2019 JonLab InfrastructureGeneralLarge optical table cleared and set up for point absorbers

Aidan and I continued the lab clean-up today. There's still more to do, but we did fully clear the large optical table which formerly housed the 50 W CO2 laser. I moved the optical enclosure over from the small table to serve as the area for the point absorber experiment. Inside it I mounted the Hartmann sensor and a 532 nm Thorlabs LED source. The LED still needs collimating/focusing optics to be installed.

Attachment 1: IMG_3421.jpg
IMG_3421.jpg
  231   Mon Jul 22 09:44:21 2019 JonLab InfrastructureComputingInstalled Amplifying VGA Splitter

The VGA signal outputted by the multiplexer is too weak to drive two monitors. This has required video cables to be manually switched back and forth between the monitor mounted above the laser table and the desktop console.

Today I solved this problem by installing an amplifying (active) VGA splitter on the video output of the multiplexer. One output of the amplifier goes to the desktop monitor and the other to the laser table. We can now monitor the HWS realtime GUIs directly above the optical setup, with no cable swapping.

Attachment 1: IMG_3522.jpg
IMG_3522.jpg
Attachment 2: IMG_3421.jpg
IMG_3421.jpg
  233   Mon Jul 22 18:46:23 2019 Edita BytyqiLab Infrastructure Laser-Lens-HWS Setup

Today, I set up a system consisting of the 520 nm laser, a 2'' mirror and two lenses of focal lengths f1 = 40 cm and f2 = 20 cm. The goal was to collimate the beam coming from the laser, so it goes parallel through the test optic at a radius of ~2.5 cm and then focus it to a radius of ~ 1.2 cm to fit the CCD dimensions of the HWS. The mirror was placed about 1 cm close to the laser and the first lens is setup at a distance~f1=40cm from the mirror. The test optic is placed between the two lenses and the second lens is placed about 10 cm from the CCD. The distance between the two lenses isn't important and could change in the future. The lenses and mirrors are all labeled.

I measured the approximate angle of divergence (0.06 rad) of the laser by taking the beam diameter at different positions along the propagation axis. This allowed for the ABCD matrix calculations to be finalized and the focal lengths of the lenses be chosen accordingly. 

In order to have more space in the box, I removed everything that was not necessary to the side.

Attachment 1: 20190722_183933.jpg
20190722_183933.jpg
Attachment 2: 20190722_183928.jpg
20190722_183928.jpg
  234   Wed Jul 24 16:25:13 2019 Edita BytyqiLab InfrastructureOpticsUpdated 2-lens setup

The previous 2-lens setup focused the beam to a tight spot, however due to the divergence angle of the laser beam, a significant amount of power was not being captured by the fiirst lens at a distance of 40 cm from the source. The divergence angle seems to be bigger than 0.06 by a factor of 2, so a f = 20 cm lens was used to collimate the beam and a f = 30 cm lens was used to focus it. A mirror was used to reflect the beam, so we obtain steering control. Additionally, the focusing lens was placed on a small 1-axis stage in order to control the distance of the lens from the CCD, providing control over the focused beam size.

Note: The 30 cm lens was cleaned with methanol, however it still has some residue on the surface. The beam imaged to the Harrtmann Sensor looks good, however the lens will be cleaned by using a different solvent or replaced by a different 30 cm lens. The 3 lenses at the edge of the box will stay inside in order to prevent contamination, however they will not be used in the design.

Attachment 1: 20190724_161926.jpg
20190724_161926.jpg
  236   Mon Jul 29 18:53:16 2019 Edita BytyqiLab InfrastructureOpticsMounted Reflector and Heater

Since we set up the 2-lens system focusing the laser beam to the CCD, the next step was to mount the spherical reflector (31 mm wide) and the heater (~3 mm diameter). I used a small 3-axis stage to mount the heater, providing 3 degrees of freedom that would allow to manipulate the height of the heater, its position with respect to the reflector (left-right and in-out). The reflector was mounted in such a way that we can control its rotation angle, height and horizontal displacement. The current design is not quite sophisticated as it is just a first test, however I will look into different tools in the lab to see if I can use less mounts to get the same degrees of freedom.

The new heaters are supposed to be heated using AC. We used a DC power supply and ran ~30V through the wire, however only about ~50 mA of current was running through it. Jon will look into the specs of the new heaters to see if the power supply was the problem.

Attachment 1: 20190729_185214.jpg
20190729_185214.jpg
Attachment 2: 20190729_185156.jpg
20190729_185156.jpg
Attachment 3: 20190729_185153.jpg
20190729_185153.jpg
Attachment 4: 20190729_185139.jpg
20190729_185139.jpg
Attachment 5: 20190729_185112.jpg
20190729_185112.jpg
  237   Thu Aug 1 15:20:39 2019 Edita BytyqiLab InfrastructureOpticsReflector Mount and DC Supply

Yesterday, we were able to take some data using the 120 V DC power supply. The reflectors cut at the focal point and radius were both tested; the semi-circle cut proved to give a better focus, likely because roughly half the heat is lost using the focal-point reflectors. For upcoming tests, the semicircle reflectors will be used. We varied the surface shine by using the dull and reflective side of Al foil, as well as using the machined Al itself. The best result was given by using the more reflective side of Al foil.

Figure 1 shows the steady-state surface deformation profile detected by the HWS. The heaters don't have a uniform distribution along the wire, so more heat is radiated in the center of it, thus more of it is being focused to the center of the test optic. The data needs to be analyzed to determine the radius of the focus. Our rough estimate is about ~1.5 - 2 cm. We cannot collect any more data until we get a new power supply (AC 120 V).

Today, I came up with a new design for mounting the reflectors. I used a big 3-axis stage and a small 4-axis stage. This provides 5 degrees of freedom: 3 translational and 2 rotational, which is what we need for fine-tuning the focus and directing it at different angles incident to the test optic. The only problem with this design is that the 3-axis stage is too tall for the box, so the lid won't close.There is a smaller one available, but I have to figure out a way to increase its height, since the screw size is different from the ones on the pedestals available.

Additionally, Chub used metal-to-metal epoxy to glue a screw to the back of a reflector. I will wait until tomorrow to test it, because it is a slow acting epoxy. If it works, I have the necessary tools to do the same with the other reflectors. With the current deisgn the reflector wil be screwed in to where the round screw is in the stage. If it heats up a lot and affects the material of the stages, a small optical post (top of stage) will be used to make up for the absorbed heat.

 

Attachment 1: 20190731_170920.jpg
20190731_170920.jpg
Attachment 2: 20190801_145836.xcf
Attachment 3: 20190801_145836.jpg
20190801_145836.jpg
Attachment 4: 20190801_150635.jpg
20190801_150635.jpg
Attachment 5: 20190801_145842.jpg
20190801_145842.jpg
  242   Tue Sep 3 10:49:57 2019 AidanLab InfrastructureGeneralExhaust duct added for new bake area in TCS lab

Facilities came in on Friday and teed off a new duct to provide exhaust for the proposed new vacuum bake area in the TCS Lab. Photos are attached. 

We installed a plastic sheet between the work area and the rest of the lab (the rest of the lab was overpressurized relative to the work area). Also, they use a vacuum when doing any drilling.

 

Attachment 1: IMG_1627.jpg
IMG_1627.jpg
Attachment 2: IMG_1629.jpg
IMG_1629.jpg
Attachment 3: IMG_1628.jpg
IMG_1628.jpg
Attachment 4: IMG_1626.jpg
IMG_1626.jpg
  244   Tue Jun 15 08:47:27 2021 AidanLab InfrastructureGeneralCleaned up HWS table in preparation for lab move

I cleaned up the HWS table in preparation for replacement with the 4x10 table. We still need to move the cabinet and get the enclosure out of the way.

 

 

Attachment 1: IMG_3056.jpg
IMG_3056.jpg
  247   Thu Aug 12 16:13:44 2021 AidanLab InfrastructureFloodCarpentry shop removed wet plaster sections from the wall - it's drying for a few days

The carpentry shop removed wet plaster sections from the wall following the flood (process was gentle scraping of wet plaster flakes, supervised by me). The wet section of wall needs a few days to dry and then they will plaster and paint it.

 

Attachment 1: IMG_4139.jpg
IMG_4139.jpg
  250   Wed Apr 27 11:41:53 2022 AidanLab InfrastructureGeneralLab clean-up to get ready for PD testing in old TCS Lab

We (Aidan, Koji, Radhika, Aaron) partially tidied up the TCS Lab. The front table is clean and ready to recieve PD tesitng optics, electronics and vacuum hardware. We moved all electronics units (oscilloscopes, power supplies, etc) to the rack in the NE corner of the lab. The back table was partially tidied up. We need to schedule cleaning of the remaining tables in the lab and also an inventory and disposal of obsolete equipment in all the cupboards.

 

Attachment 1: IMG_8599.jpg
IMG_8599.jpg
Attachment 2: IMG_8598.jpg
IMG_8598.jpg
Attachment 3: IMG_8596.jpg
IMG_8596.jpg
Attachment 4: IMG_8595.jpg
IMG_8595.jpg
Attachment 5: IMG_8600.jpg
IMG_8600.jpg
  251   Wed May 11 19:46:21 2022 Aidan, Radhika, JordanLab InfrastructureVacuum chamberLeak cleaning on IR labs vacuum chamber - suspects

[Aidan, Jordan, Radhika]

Radhika and Jordan identified some particulates (hair and flecks of foil) on the O-ring on the IR labs dewer. Additionally, we saw a scratch in the O-ring groove and a nick on the metal of the base of the dewer where it meets the O-ring. All were in the leaky vicinity previously identified by the He testing.

We set up a cradle to hold the dewer while we are working on it. Still needs vertical supports.

R & J replaced the O-ring with a new one with Crytox applied. 

Attachment 1: IMG_8812.jpg
IMG_8812.jpg
Attachment 2: IMG_8799.jpg
IMG_8799.jpg
Attachment 3: IMG_8789.jpg
IMG_8789.jpg
Attachment 4: IMG_8805.jpg
IMG_8805.jpg
  253   Thu Jun 23 10:53:17 2022 JCLab InfrastructureGeneralSeat For Photodiode Testing

[JC, Chub, Radhika]

Chub and I ordered a few parts from McMaster in order build a handrail-like stopper to keep the dewar from falling over. We also cut off the excess 8020 which was leaning over the table to fit. To hold down the support for the Dewar, Radhika and I decided to use C-clamps from the EE shop.

Attachment 1: 62AE8A4B-F817-4A03-A2F1-AE48B97FB935.jpg
62AE8A4B-F817-4A03-A2F1-AE48B97FB935.jpg
Attachment 2: IMG_1392_2.jpg
IMG_1392_2.jpg
  256   Thu Jan 12 11:52:47 2023 KojiLab InfrastructureGeneralHow to move the large engine hoist through the narrow door

How to move the large engine hoist through the narrow door

See http://nodus.ligo.caltech.edu:8080/Mariner/122

  257   Tue Feb 28 09:44:43 2023 AidanLab InfrastructureGeneralAdded lighting and tidied West Desk

I added LED stip lighting above the desk on the West wall. I also tidied that desk up (mostly in the drawers).

 

Attachment 1: IMG_3670.jpg
IMG_3670.jpg