Entry  Thu May 20 10:44:13 2010, Aidan, Electronics, SLED, QPhotonics 980nm source power 
dV = 0.385V
Responsivity= 0.65A/W
Transimpedance = 1.5E4 V/A
Entry  Thu May 20 17:08:36 2010, Aidan, Electronics, SLED, SLED module - and driver - LIGO D1000892 - and Hartmann sensor 2010-05-20_hartmann_image_and_located_spot.jpg
Verified that the test-point for the current limit pot on the driver (Wavelength Electronics - LDTC 0520) was at 0.5V. Driver is set to INTERNAL set
point at the moment. This is down about 10% below the current limited point.
Voltage across TP7 and TP9 = 0.970V = LD Current Mon
Entry  Thu May 27 08:25:37 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor cooling fins added - base piece removed HWS_CONFIG2.jpg
 8:10AM - I removed the base plate from the Hartmann sensor. I want to know what steady-state temperature the HWS achieves without the plate.
The photo below shows the current configuration.
11:22AM - (Digitizer - 52.2C, Sensor - 43.8C, Ambient - 21.8C)
Entry  Thu May 27 13:18:51 2010, Aidan, Electronics, Hartmann sensor, Removed Cooling fins from Hartmann sensor HWS_CONFIG3.jpg
I removed the cooling fins from the Hartmann sensor to see what steady-state temperature it reached without any passive cooling elements. I also dropped
the set-point temperature for the lab to help keep for getting too hot.
After nearly 3 hours the temperature is:
Entry  Thu May 27 15:42:06 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor with just the base piece HWS_CONFIG4.jpg
I switched in just the base piece of the Hartmann sensor. The cooling fins are removed. I bolted the camera securely to the base plate and I bolted the
plate securely to the table.
 5:00PM - (Digitizer = 41.9C, Sensor = 33.8C, Ambient = 19.3C)
Entry  Thu May 27 17:49:02 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor cooling fins added - base piece added HWS_CONFIG1-tight.jpg
 Back to Configuration 1 again - this time the fins were bolted very securely to the camera.
 7:25 PM - [about 2 hours later] - Digitizer = 39.7C, Sensor = 31.4C, Ambient = 19.0C
 
Entry  Sat Jul 24 10:50:14 2010, Aidan, Electronics, Hartmann sensor, Lab Temperature and HWS temperature: pre-indium 
 Hour-long trend puts the lab temperature at 19.51C
Dalsa temperature:
 
Entry  Mon Jul 26 12:17:25 2010, Aidan, Electronics, Hartmann sensor, Added Indium to HWS indium-01.jpgindium-03.jpgindium-05.jpgindium-02.jpgindium-04.jpg
 I added some 0.004" thick indium sheet to the copper heat spreaders and and the heat sinks on the side of the HWS to try and improve the thermal
contact. Once installed the steady state temperature of the sensor was the same as before. It's possible that the surface of the copper is even more uneven
than 0.004".
Entry  Tue Jul 27 08:31:10 2010, Aidan, Electronics, SLED, Long term SLED test - Day 1 SLED_superlum_long_term_test_0002A.pdf
 The measurement from the on-board PD of the Superlum SLED seems to be falling. This effect started around 5PM last night which is right about the
time we moved the position of the PD that the SLED is illuminating on the optical table (via optical fiber).
Curiously, the current set point and delivered current to the SLED are dropping as well. 
Entry  Wed Jul 28 18:32:12 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 SLED_superlum_long_term_test_0003A.pdf
Here's the data from the last 2 1/2 days of running the SLED. The decrease in photo-current measured by the on-board photo-detector is consistent with
the decrease in the current set-point and the delivered current, but it is not clear why these should be changing.
Strictly speaking I should add some analysis that shows that delta_PD_voltage_measured = delta_I_set_measured * [delta_PD_voltage/delta_I_set (I_set)]_calculated
    Reply  Thu Jul 29 10:09:19 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 superlum_SLED_ATR.pdf
I've attached the Acceptance Test Report data from SUPERLUM for this SLED. I've also determined the expected percentage decrease in power/photo-current
per mA drop in forward current.
The measured decrease in forward current over the last 2 1/2 days is around 1.4mA from around 111mA. The expected drop in power is thus (4.5% per
Entry  Tue Jan 25 16:38:16 2011, Aidan, Electronics, Pre-amplifier, L1 TCSY ISS Board transfer function L1TCS_ISS_boards_transfer_functions.pdfSRS003.78DSRS004.78DSRS005.78DSRS006.78D
 I measured the AC and DC channel transfer functions of the eLIGO L1 TCSY ISS board for PD1 and PD2. The gain is quite high on the AC channels so
I added +40dB of attenuation to the source from the SR785. As Frank pointed out, even though this isn't exactly +40dB at low frequencies, it still attenuates
and that attenuation is common to both the input to the Channel 1 of the SR785 and the input to the ISS board.
Entry  Tue Feb 8 13:02:26 2011, Aidan, Electronics, Delivery Note, Thorlabs S322C 200W power head arrived Co2_200W_power_meter_delviery_note.pdfCo2_200W_power_meter_calibration_info.pdf
 The 200W Thermopile power head from Thorlabs arrive today. The scanned delivery note and calibration info are attached.
Entry  Wed Feb 23 20:18:30 2011, Aidan, Electronics, Hartmann sensor, Successfully re-started the Hartmann sensor 
 I reattached the Hartmann Sensor to the LENOVO machine that is running Ubuntu and turned it on (it's been disconnected for a couple of months).
The /opt/EDTpdv/serial_cmd was able to communicate successfully with the camera.
Entry  Tue Mar 1 17:05:45 2011, Aidan, Electronics, Hartmann sensor, Dalsa 1M60 current draw 
Steve and I measured the current drawn by the Dalsa 1M60 by connecting it to the BK Precision 1735 lab power supply that display current and voltage
supplied. We tried the camera at a variety of different voltages. The results are presented below:
Voltage  Current(t<5s)  Current(5s<t<10s)   Current(t>10s) 
Entry  Thu May 26 11:56:46 2011, Aidan, Electronics, Laser, Green Laser Pointer beam profile green_laser_pointer.bmpgreen_laser_pointer.pdfScreen_shot_2011-05-26_at_12.28.20_PM.png
This measurement was made with the Thorlabs DCC1545M-GL camera with an RG850 3mm long-pass filter over the CCD.
The beam radius (w) is 191 pixels, where the beam intensity = exp[-2 (x/w)^2 ]
The pixel size is 5.2um. Hence the beam size is 993.2um, which is basically near enough to 1mm radius.
Entry  Fri Sep 2 21:41:01 2011, Aidan, Electronics, Hartmann sensor, Restarting long term test of QFLD-950-3S 
9:40PM PDT - I've just restarted the long term measurement of the Hartmann sensor noise with the QFLD-950-3S.
 
Entry  Wed Apr 26 15:29:25 2017, Aidan, Electronics, Hartmann sensor, Long term test of fiber launcher 
I've started a long-term measurement of the HWS fiber-launcher. I'm interested in seeing how stable the output is. The HWS is currently running
in the following configuration:


SLED: QFLD-635-1S (635nm, 1mW) - current driver set to 38.02mA, thermistor set point = 10.778kOhm
SLED coupled to patch cable
Patch
Entry  Wed May 24 09:58:17 2017, Aidan, Electronics, Electronics, Temperature sensor batteries swapped in TCS Lab 
I noticed that the TCS lab temperature sensor batteries died. Apparently they died two days ago. I swapped in some new batteries this morning.
 
Entry  Thu Jul 13 10:11:57 2017, awade, Electronics, Borrowed, Borrowed newport TrueRMS Supermeter 2017-07-13_10.06.28.jpg2017-07-13_10.06.29.jpg
I lent your fancy Newport TrueRMS Supermeter with the thermocouple plugs on the top to the SURF student Jordon.  He has it in the cryo lab or the
EE workshop with one of the PSL lab temperature probes.
Entry  Tue Aug 6 19:22:28 2019, Jon, Electronics, Computing, QIL NFS server set up 
I've started building the NFS server for the QIL cymac. It's sitting on the workbench in the TCS lab next to the rack. Please don't move
it or any of the parts behind it.
Entry  Fri Aug 9 20:33:11 2019, Jon, Electronics, Ring Heater, Power-regulated heater ready to use IMG_3576.jpgIMG_3577.jpg
Despite some considerable time spent, I was not able to get the Omega SCR controllers
working. The first unit definitely arrived damaged. None of its LED indicator lights ever functioned, despite those on the second controller
working fine under the same setup. I tried swapping in the second controller, but it has no voltage output and a red LED is illuminated which, according
Entry  Mon Aug 12 21:15:12 2019, Edita Bytyqi, Electronics, , Determining heater/reflector focus 20190812_151316.jpg20190812_151258.jpg
I took images of the heat pattern projected on a piece of paper produced by the semi-circle reflector. I used 108V to drive current throught he
heater. I tested the reflector without any coating and then with the dull and shiny sides of Al foil. I wasn't able to test the focal-point cut reflector
because I had to glue a screw to it with epoxy which cures overnight. I will do these measurements tomorrow. Figure 2 shows the setup I used to get
Entry  Fri Aug 16 17:05:14 2019, Edita Bytyqi, Electronics, , FLIR Images of new reflector focusing heat 
We got 11 new semi-circle cut reflectors of radius ~3.6 cm. I glued a screw to the back of one reflector using the same epoxy as for the previous reflectors.
Due to the bigger ROC of the reflector, a tight focus is achievable at greater distances (~15 cm).
Entry  Wed Jul 13 15:19:49 2022, JC, Electronics, General, Desktop Computer  
[JC]

The desktop computer is now running Debian Linux
Entry  Thu Feb 24 14:23:58 2011, Aidan, Lab Infrastructure, Hartmann sensor, Hartmann Sensor box cut down to size P1000109.jpgP1000110.jpgP1000111.jpgP1000113.jpg
 I reduced the height of the Hartmann sensor box. This is what it looks like now:
 
Entry  Fri Mar 11 13:11:33 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch connectors have arrived Packing_List_05.pdf
 See attached delivery note ...
    Reply  Wed Mar 16 15:05:47 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch equipment has arrived Packing_List_06.pdf
30mm T-junctions, grounding straps and T-slot covers have arrived


    
        
            Quote:
        
        
            
Entry  Thu Apr 28 22:48:47 2011, Aidan, Lab Infrastructure, Electronics, BNC Cables from HWS table to rack 
 I labelled and strung 8 of the 16 custom 40' BNC cables from L-Com between the HWS table and the BNC feed-through on the rack. Each cable is labelled
HWS TABLE CHxx where 01<= xx <= 08. I'm going to leave the other 8 until we have room in the BNC feedthrough on the rack.
Entry  Wed Oct 11 20:19:06 2017, Jon Richardson, Lab Infrastructure, Hartmann sensor, Initial Characterization of the SRM Adaptive Wavefront Control thermal_lens.png
Today I made the first characterization measurements of the mocked-up adaptive wavefront control system planned for the signal recycling mirrors.

The Setup

Inside the light-tight enclosure on the center table, I've assembled and aligned a 10.2 micron CO2 projector
which provides a heating beam of up to 150 mW incident on an SRM-like test optic. A co-aligned 633 nm probe beam and Hartmann wavefront sensor
Entry  Fri Oct 13 15:52:41 2017, Aidan, Lab Infrastructure, General, Broadband mirror BB2-E03 reflectivity at 532nm IMG_1223.JPGIMG_1213.JPG
I measured the reflectivity of a possible HWS replacement mirror at 532nm. Thorlabs
BB2-EO3

Incident power = 1.28mW
Entry  Fri Feb 8 10:48:33 2019, Aidan, Lab Infrastructure, General, Water damage repair work in the TCS Lab 
Caltech Facilities has determined that the walls in the SE corner of the TCS Lab in West Bridge were water damaged during last weekend’s rain.
They are going to remove the plaster from the walls and dehumidify the area for a week or so. All tables in the room are going to be covered with plastic
for this process. In the short term I’ve shutdown all the equipment in the lab (including FB4). The 2-micron cavity-testing fabrication has been
Entry  Fri Apr 12 17:40:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station BakeStation_Page_1.jpgBakeStation_Page_2.jpg
I drew up one way we could set up the three available bake ovens in the TCS lab on the single oil pump. 

If this looks feasible to others, we can move the ovens into the TCS lab. Duo and I will be occupied at KNI during Tuesday and Monday morning,
so the usual lab cleanup time may not be the best. Perhaps Monday afternooon we can at least get the ovens out of the hallway and get one of them set up
    Reply  Mon Apr 15 08:12:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station 
My preference is to have tubes back towards the wall where possible. We might be able to drill a large diameter hole in the table top to accommodate
them.

We have to get confirmation that the exhaust can be extracted - otherwise this whole thing is moot.
Entry  Thu May 23 11:36:49 2019, agupta, Lab Infrastructure, Borrowed, Borrowed Label Maker 
I have borrowed TCS's label maker in CTN for few days. If you need it, you can take it from the top of blue cabinets.
Entry  Mon Jun 17 20:29:34 2019, Jon, Lab Infrastructure, Computing, Server rack cleaned up, new workstation installed IMG_3419.jpg
In anticipation of the point absorber SURF project, I cleaned up the server rack and installed a new workstation today.

The workstation replaces the old one, whose hard drive had failed, with a more powerful machine. The hostname (tcs-ws), IP address (10.0.1.168),
user name (controls), and standard password (written in the secret place) are all the same as before.
Entry  Tue Jun 18 19:05:16 2019, Jon, Lab Infrastructure, General, Large optical table cleared and set up for point absorbers IMG_3421.jpg
Aidan and I continued the lab clean-up today. There's still more to do, but we did fully clear the large optical table which formerly housed the
50 W CO2 laser. I moved the optical enclosure over from the small table to serve as the area for the point absorber experiment. Inside it I mounted
the Hartmann sensor and a 532 nm Thorlabs LED source. The LED still needs collimating/focusing optics to be installed.
Entry  Mon Jul 22 09:44:21 2019, Jon, Lab Infrastructure, Computing, Installed Amplifying VGA Splitter IMG_3522.jpgIMG_3421.jpg
The VGA signal outputted by the multiplexer is too weak to drive two monitors. This has required video cables to be manually switched back and forth
between the monitor mounted above the laser table and the desktop console.

Today I solved this problem by installing an amplifying (active) VGA splitter on the video output of the multiplexer. One output of the
Entry  Mon Jul 22 18:46:23 2019, Edita Bytyqi, Lab Infrastructure, , Laser-Lens-HWS Setup 20190722_183933.jpg20190722_183928.jpg
Today, I set up a system consisting of the 520 nm laser, a 2'' mirror and two lenses of focal lengths f1 = 40 cm and f2 = 20 cm. The goal was
to collimate the beam coming from the laser, so it goes parallel through the test optic at a radius of ~2.5 cm and then focus it to a radius of ~
1.2 cm to fit the CCD dimensions of the HWS. The mirror was placed about 1 cm close to the laser and the first lens is setup at a distance~f1=40cm from
Entry  Wed Jul 24 16:25:13 2019, Edita Bytyqi, Lab Infrastructure, Optics, Updated 2-lens setup 20190724_161926.jpg
The previous 2-lens setup focused the beam to a tight spot, however due to the divergence angle of the laser beam, a significant amount of power was
not being captured by the fiirst lens at a distance of 40 cm from the source. The divergence angle seems to be bigger than 0.06 by a factor of 2, so a
f = 20 cm lens was used to collimate the beam and a f = 30 cm lens was used to focus it. A mirror was used to reflect the beam, so we obtain steering control.
Entry  Mon Jul 29 18:53:16 2019, Edita Bytyqi, Lab Infrastructure, Optics, Mounted Reflector and Heater 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg
Since we set up the 2-lens system focusing the laser beam to the CCD, the next step was to mount the spherical reflector (31 mm wide) and the heater
(~3 mm diameter). I used a small 3-axis stage to mount the heater, providing 3 degrees of freedom that would allow to manipulate the height of the heater,
its position with respect to the reflector (left-right and in-out). The reflector was mounted in such a way that we can control its rotation angle, height
Entry  Thu Aug 1 15:20:39 2019, Edita Bytyqi, Lab Infrastructure, Optics, Reflector Mount and DC Supply 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg
Yesterday, we were able to take some data using the 120 V DC power supply. The reflectors cut at the focal point and radius were both tested; the semi-circle
cut proved to give a better focus, likely because roughly half the heat is lost using the focal-point reflectors. For upcoming tests, the semicircle reflectors
will be used. We varied the surface shine by using the dull and reflective side of Al foil, as well as using the machined Al itself. The best result was
Entry  Tue Sep 3 10:49:57 2019, Aidan, Lab Infrastructure, General, Exhaust duct added for new bake area in TCS lab IMG_1627.jpgIMG_1629.jpgIMG_1628.jpgIMG_1626.jpg
Facilities came in on Friday and teed off a new duct to provide exhaust for the proposed new vacuum bake area in the TCS Lab. Photos are attached. 

We installed a plastic sheet between the work area and the rest of the lab (the rest of the lab was overpressurized relative to the work area).
Also, they use a vacuum when doing any drilling.
Entry  Tue Jun 15 08:47:27 2021, Aidan, Lab Infrastructure, General, Cleaned up HWS table in preparation for lab move IMG_3056.jpg
I cleaned up the HWS table in preparation for replacement with the 4x10 table. We still need to move the cabinet and get the enclosure out of the way.

 

 
Entry  Thu Aug 12 16:13:44 2021, Aidan, Lab Infrastructure, Flood, Carpentry shop removed wet plaster sections from the wall - it's drying for a few days IMG_4139.jpg
The carpentry shop removed wet plaster sections from the wall following the flood (process was gentle scraping of wet plaster flakes, supervised
by me). The wet section of wall needs a few days to dry and then they will plaster and paint it.

 
Entry  Wed Apr 27 11:41:53 2022, Aidan, Lab Infrastructure, General, Lab clean-up to get ready for PD testing in old TCS Lab IMG_8599.jpgIMG_8598.jpgIMG_8596.jpgIMG_8595.jpgIMG_8600.jpg
We (Aidan, Koji, Radhika, Aaron) partially tidied up the TCS Lab. The front table is clean and ready to recieve PD tesitng optics, electronics and
vacuum hardware. We moved all electronics units (oscilloscopes, power supplies, etc) to the rack in the NE corner of the lab. The back table was partially
tidied up. We need to schedule cleaning of the remaining tables in the lab and also an inventory and disposal of obsolete equipment in all the cupboards.
Entry  Wed May 11 19:46:21 2022, Aidan, Radhika, Jordan, Lab Infrastructure, Vacuum chamber, Leak cleaning on IR labs vacuum chamber - suspects IMG_8812.jpgIMG_8799.jpgIMG_8789.jpgIMG_8805.jpg
[Aidan, Jordan, Radhika]

Radhika and Jordan identified some particulates (hair and flecks of foil) on the O-ring on the IR labs dewer. Additionally, we saw a scratch
in the O-ring groove and a nick on the metal of the base of the dewer where it meets the O-ring. All were in the leaky vicinity previously identified by
Entry  Thu Jun 23 10:53:17 2022, JC, Lab Infrastructure, General, Seat For Photodiode Testing 62AE8A4B-F817-4A03-A2F1-AE48B97FB935.jpgIMG_1392_2.jpg
[JC, Chub, Radhika]

Chub and I ordered a few parts from McMaster in order build a handrail-like stopper to keep the dewar from falling over. We also cut off the
excess 8020 which was leaning over the table to fit. To hold down the support for the Dewar, Radhika and I decided to use C-clamps from the EE shop.
Entry  Fri Nov 6 20:09:47 2009, Aidan, Laser, Laser, Test 
 Does this work?
    Reply  Thu Dec 10 22:23:47 2009, Not Aidan, Laser, Laser, Test 
Yes.


    
        