40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog, Page 3 of 6  Not logged in ELOG logo
Entry  Thu May 20 10:44:13 2010, Aidan, Electronics, SLED, QPhotonics 980nm source power 
Entry  Thu May 20 17:08:36 2010, Aidan, Electronics, SLED, SLED module - and driver - LIGO D1000892 - and Hartmann sensor 2010-05-20_hartmann_image_and_located_spot.jpg
Entry  Thu May 27 08:25:37 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor cooling fins added - base piece removed HWS_CONFIG2.jpg
Entry  Thu May 27 13:18:51 2010, Aidan, Electronics, Hartmann sensor, Removed Cooling fins from Hartmann sensor HWS_CONFIG3.jpg
Entry  Thu May 27 15:42:06 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor with just the base piece HWS_CONFIG4.jpg
Entry  Thu May 27 17:49:02 2010, Aidan, Electronics, Hartmann sensor, Hartmann sensor cooling fins added - base piece added HWS_CONFIG1-tight.jpg
Entry  Sat Jul 24 10:50:14 2010, Aidan, Electronics, Hartmann sensor, Lab Temperature and HWS temperature: pre-indium 
Entry  Mon Jul 26 12:17:25 2010, Aidan, Electronics, Hartmann sensor, Added Indium to HWS indium-01.jpgindium-03.jpgindium-05.jpgindium-02.jpgindium-04.jpg
Entry  Tue Jul 27 08:31:10 2010, Aidan, Electronics, SLED, Long term SLED test - Day 1 SLED_superlum_long_term_test_0002A.pdf
Entry  Wed Jul 28 18:32:12 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 SLED_superlum_long_term_test_0003A.pdf
    Reply  Thu Jul 29 10:09:19 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 superlum_SLED_ATR.pdf
Entry  Tue Jan 25 16:38:16 2011, Aidan, Electronics, Pre-amplifier, L1 TCSY ISS Board transfer function L1TCS_ISS_boards_transfer_functions.pdfSRS003.78DSRS004.78DSRS005.78DSRS006.78D
Entry  Tue Feb 8 13:02:26 2011, Aidan, Electronics, Delivery Note, Thorlabs S322C 200W power head arrived Co2_200W_power_meter_delviery_note.pdfCo2_200W_power_meter_calibration_info.pdf
Entry  Wed Feb 23 20:18:30 2011, Aidan, Electronics, Hartmann sensor, Successfully re-started the Hartmann sensor 
Entry  Tue Mar 1 17:05:45 2011, Aidan, Electronics, Hartmann sensor, Dalsa 1M60 current draw 
Entry  Thu May 26 11:56:46 2011, Aidan, Electronics, Laser, Green Laser Pointer beam profile green_laser_pointer.bmpgreen_laser_pointer.pdfScreen_shot_2011-05-26_at_12.28.20_PM.png
Entry  Fri Sep 2 21:41:01 2011, Aidan, Electronics, Hartmann sensor, Restarting long term test of QFLD-950-3S 
Entry  Wed Apr 26 15:29:25 2017, Aidan, Electronics, Hartmann sensor, Long term test of fiber launcher 
Entry  Wed May 24 09:58:17 2017, Aidan, Electronics, Electronics, Temperature sensor batteries swapped in TCS Lab 
Entry  Thu Jul 13 10:11:57 2017, awade, Electronics, Borrowed, Borrowed newport TrueRMS Supermeter 2017-07-13_10.06.28.jpg2017-07-13_10.06.29.jpg
Entry  Tue Aug 6 19:22:28 2019, Jon, Electronics, Computing, QIL NFS server set up 
Entry  Fri Aug 9 20:33:11 2019, Jon, Electronics, Ring Heater, Power-regulated heater ready to use IMG_3576.jpgIMG_3577.jpg
Entry  Mon Aug 12 21:15:12 2019, Edita Bytyqi, Electronics, , Determining heater/reflector focus 20190812_151316.jpg20190812_151258.jpg
Entry  Fri Aug 16 17:05:14 2019, Edita Bytyqi, Electronics, , FLIR Images of new reflector focusing heat 
Entry  Thu Feb 24 14:23:58 2011, Aidan, Lab Infrastructure, Hartmann sensor, Hartmann Sensor box cut down to size P1000109.jpgP1000110.jpgP1000111.jpgP1000113.jpg
Entry  Fri Mar 11 13:11:33 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch connectors have arrived Packing_List_05.pdf
    Reply  Wed Mar 16 15:05:47 2011, Aidan, Lab Infrastructure, Delivery Note, More Bosch equipment has arrived Packing_List_06.pdf
Entry  Thu Apr 28 22:48:47 2011, Aidan, Lab Infrastructure, Electronics, BNC Cables from HWS table to rack 
Entry  Wed Oct 11 20:19:06 2017, Jon Richardson, Lab Infrastructure, Hartmann sensor, Initial Characterization of the SRM Adaptive Wavefront Control thermal_lens.png
Entry  Fri Oct 13 15:52:41 2017, Aidan, Lab Infrastructure, General, Broadband mirror BB2-E03 reflectivity at 532nm IMG_1223.JPGIMG_1213.JPG
Entry  Fri Feb 8 10:48:33 2019, Aidan, Lab Infrastructure, General, Water damage repair work in the TCS Lab 
Entry  Fri Apr 12 17:40:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station BakeStation_Page_1.jpgBakeStation_Page_2.jpg
    Reply  Mon Apr 15 08:12:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station 
Entry  Thu May 23 11:36:49 2019, agupta, Lab Infrastructure, Borrowed, Borrowed Label Maker 
Entry  Mon Jun 17 20:29:34 2019, Jon, Lab Infrastructure, Computing, Server rack cleaned up, new workstation installed IMG_3419.jpg
Entry  Tue Jun 18 19:05:16 2019, Jon, Lab Infrastructure, General, Large optical table cleared and set up for point absorbers IMG_3421.jpg
Entry  Mon Jul 22 09:44:21 2019, Jon, Lab Infrastructure, Computing, Installed Amplifying VGA Splitter IMG_3522.jpgIMG_3421.jpg
Entry  Mon Jul 22 18:46:23 2019, Edita Bytyqi, Lab Infrastructure, , Laser-Lens-HWS Setup 20190722_183933.jpg20190722_183928.jpg
Entry  Wed Jul 24 16:25:13 2019, Edita Bytyqi, Lab Infrastructure, Optics, Updated 2-lens setup 20190724_161926.jpg
Entry  Mon Jul 29 18:53:16 2019, Edita Bytyqi, Lab Infrastructure, Optics, Mounted Reflector and Heater 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg
Entry  Thu Aug 1 15:20:39 2019, Edita Bytyqi, Lab Infrastructure, Optics, Reflector Mount and DC Supply 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg
Entry  Tue Sep 3 10:49:57 2019, Aidan, Lab Infrastructure, General, Exhaust duct added for new bake area in TCS lab IMG_1627.jpgIMG_1629.jpgIMG_1628.jpgIMG_1626.jpg
Entry  Tue Jun 15 08:47:27 2021, Aidan, Lab Infrastructure, General, Cleaned up HWS table in preparation for lab move IMG_3056.jpg
Entry  Thu Aug 12 16:13:44 2021, Aidan, Lab Infrastructure, Flood, Carpentry shop removed wet plaster sections from the wall - it's drying for a few days IMG_4139.jpg
Entry  Wed Apr 27 11:41:53 2022, Aidan, Lab Infrastructure, General, Lab clean-up to get ready for PD testing in old TCS Lab IMG_8599.jpgIMG_8598.jpgIMG_8596.jpgIMG_8595.jpgIMG_8600.jpg
Entry  Wed May 11 19:46:21 2022, Aidan, Radhika, Jordan, Lab Infrastructure, Vacuum chamber, Leak cleaning on IR labs vacuum chamber - suspects IMG_8812.jpgIMG_8799.jpgIMG_8789.jpgIMG_8805.jpg
Entry  Fri Nov 6 20:09:47 2009, Aidan, Laser, Laser, Test 
    Reply  Thu Dec 10 22:23:47 2009, Not Aidan, Laser, Laser, Test 
Entry  Thu Feb 11 18:04:08 2010, Aidan, Laser, Ring Heater, Ring heater time constant 
Entry  Mon May 24 19:17:32 2010, Aidan, Laser, Hartmann sensor, Replaced Brass Plate with Invar Hartmann Plate 
ELOG V3.1.3-