Entry  Fri Jun 25 10:47:08 2010, Aidan, Misc, aLIGO Modeling, Uploaded aLIGO axicon+ITM COMSOL model to the 40m SVN aLIGO_axicon_spacing_post-magnification_optimization.jpg
I added a COMSOL model of the aLIGO ITM being heated by an axicon-formed annulus to the 40m SVN. The model assumes a fixed input beam size into an axicon
pair and then varies the distance between the axicons. The output is imaged onto the ITM with varying magnitudes. The thermal lens is determined in the
ITM and added  to the self-heating thermal lens (assuming 1W absorption, I think - need to check). The power in the annulus is varied until the sum
    Reply  Fri Jun 25 10:59:43 2010, Aidan, Misc, aLIGO Modeling, Uploaded aLIGO axicon+ITM COMSOL model to the 40m SVN Screen_shot_2010-06-25_at_11.01.38_AM.png
Here are the results in the annulus thickness vs annulus diameter space ...


    
        
            Quote:
        
        
            
Entry  Tue Jun 5 17:25:43 2012, Alex Mauney, Misc, aLIGO Modeling, 6/5/12 Daily Summary 
- Had a meeting to talk about the basics of LIGO (esp. TCS) and discuss the project
- Created COMSOL model for the test mass with incident Gaussian beam.
- Added a ring heater to the previous file
Entry  Wed Jun 6 16:54:09 2012, Alex Mauney, Misc, aLIGO Modeling, 6/6/12 Daily Summary 
- Got access to and started working with SIS on Rigel1
- Fixed SVN issues
- Refined COMSOL model parameters and worked on a better way to implement the heating ring to get the astigmatic heating pattern.
Entry  Thu Jun 7 16:50:16 2012, Alex Mauney, Misc, aLIGO Modeling, 6/7/12 Daily Summary 
- Created a COMSOL model with thermal deformations
- Added non-symmetrical heating to cause astigmatism
- Worked on a method to compute the optical path length changes in COMSOL
Entry  Fri Jun 8 16:36:47 2012, Alex Mauney, Misc, aLIGO Modeling, 6/8/12 Daily Summary 
- Tried to fix COMSOL error using the (ts) module, ended up emailing support as the issue is new in 4.3
- Managed to get a symmetric geometric distortion by fixing the x and y movements of the mirror to be zero (need to look for a better way to do
this as this may be unphysical)
Entry  Mon Jun 11 17:11:01 2012, Alex Mauney, Misc, aLIGO Modeling, 6/11/12 Daily Summary 
- Fixed the (ts) model, got strange results that indicate that the antisymmetric heating mode is much more prominent than previously thought
- Managed to get COMSOL data through matlab and into SIS
 
Entry  Wed Jun 13 16:36:14 2012, Alex Mauney, Misc, aLIGO Modeling, 6/12 and 6/13 Daily Summary 
- Realized that the strange deformations that we were seeing only occur on the face nearest the ring heater, and not on the face we are worried about
(the HR face)
- Read papers by Morrison et al. and Kogelnik to get a better understanding of the mathematics and operations of the optical cavity modeled in
Entry  Thu Jun 14 16:51:03 2012, Alex Mauney, Misc, aLIGO Modeling, 6/14/12 Daily Summary SIS_Outputs.txtAssymetric_Heating_Line_Graph.png
- Plugged the output of the model with uniform heating into SIS using both modification of the radius of curvature, and direct importation of deflection
data
- Generated a graph for asymmetric heating and did the same
Entry  Mon Jun 18 16:30:36 2012, Alex Mauney, Misc, aLIGO Modeling, 6/18/12 Daily Summary 
- Verified that the SIS output does match satisfy the equations for Gaussian beam propagation
- Investigated how changing the amount of data points going into SIS changed the output, as well as how changes in the astigmatic heating effect
the output
Entry  Tue Jun 19 16:24:52 2012, Alex Mauney, Misc, aLIGO Modeling, 6/19/12 Daily Summary 
- Did more modeling for different levels of heating and different mesh densities for the SIS input.
- Lots of orientation stuff
- Started on progress report.
Entry  Wed Jun 20 16:44:58 2012, Alex Mauney, Misc, aLIGO Modeling, 6/20/12 Daily Summary TS_model_deformation_line_graph_2W_10%.pngTS_model_deformation_line_graph_2W_10%_sym.pngTS_model_deformation_line_graph_2W_10%_antisym.pngTS_model_deformation_contour_graph_2W_10%.pngHTSM_model_deformation_contour_graph_2W_10%.png
- Attended a lot of meetings (Safety, LIGO Orientation)
- Finished draft of week 3 report (images attached)
 
Entry  Thu Jun 21 16:54:45 2012, Alex Mauney, Misc, aLIGO Modeling, 6/21/12 Daily Summary 
- Paper edits and more data generation for the paper (lower resolution grid data)
- Attended a talk on LIGO
 
Entry  Wed Jun 27 16:43:56 2012, Alex Mauney, Misc, aLIGO Modeling, 6/27/12 Daily Summary 
Plan for building the model
- Find the fields that would be incident on the beam splitter from each arm (This is done already)
- Propagate these through until they get to the OMC using the TELESCOPE function in SIS
Entry  Thu Jun 28 16:27:37 2012, Alex Mauney, Misc, aLIGO Modeling, 6/28/12 Daily Summary 
- Finished the MatLab code that both combines two fields and simulates the adjustment of the beamsplitter to minimize the power out (with a small offset).
- Added the signal recycling telescope to the SIS code that generates the fields
To Do: Make the OMC cavity in SIS
Entry  Mon Jul 9 16:54:17 2012, Alex Mauney, Misc, aLIGO Modeling, 7/9/12 Summary 
Made a COMSOL model that can include CO2 laser heating, self heating, and ring heating
Figured out how to run SIS out of a script and set up commands to run the two SIS stages of the model
Entry  Thu May 20 10:44:13 2010, Aidan, Electronics, SLED, QPhotonics 980nm source power 
dV = 0.385V
Responsivity= 0.65A/W
Transimpedance = 1.5E4 V/A
Entry  Thu May 20 17:08:36 2010, Aidan, Electronics, SLED, SLED module - and driver - LIGO D1000892 - and Hartmann sensor 2010-05-20_hartmann_image_and_located_spot.jpg
Verified that the test-point for the current limit pot on the driver (Wavelength Electronics - LDTC 0520) was at 0.5V. Driver is set to INTERNAL set
point at the moment. This is down about 10% below the current limited point.
Voltage across TP7 and TP9 = 0.970V = LD Current Mon
Entry  Wed May 26 06:47:02 2010, Aidan, Laser, SLED, Switched off SLED - 6:40AM 
 
Entry  Sun Jul 25 16:24:56 2010, Aidan, Computing, SLED, Superlum SLED test integrated with DAQ - new channel names 
 I added some new channels to the Athena DAQ that record the diagnostic channels from the Superlum SLED.

    C4:TCS-ATHENA_I_SET_VOLTS:  - the set current signal in Volts (1V = 1A)
    C4:TCS-ATHENA_I_ACTUAL_VOLTS:   - a
signal proportional to the actual current flowing to the SLED (1V = 1A)
    C4:TCS-ATHENA_I_LIM_VOLTS: - the current limit signal in volts (1V
Entry  Mon Jul 26 09:42:30 2010, Aidan, Computing, SLED, Long term test on SLED started - Day 0 SLED_superlum_long_term_test_0001A.pdfSLED_superlum_long_term_test_0001B.pdf
 I set up the SLED to test its long term performance. The test began, after a couple of false starts, around 9:15AM this morning.
The output of the fiber-optic patch cord attached to the SLED is illuminating a photo-detector. The zero-level on the PD was 72.7mV (with the lights
on). Once the PD was turned on the output was ~5.50 +/- 0.01V. This is with roughly 900uW exiting the SLED.
Entry  Tue Jul 27 08:31:10 2010, Aidan, Electronics, SLED, Long term SLED test - Day 1 SLED_superlum_long_term_test_0002A.pdf
 The measurement from the on-board PD of the Superlum SLED seems to be falling. This effect started around 5PM last night which is right about the
time we moved the position of the PD that the SLED is illuminating on the optical table (via optical fiber).
Curiously, the current set point and delivered current to the SLED are dropping as well. 
Entry  Wed Jul 28 18:32:12 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 SLED_superlum_long_term_test_0003A.pdf
Here's the data from the last 2 1/2 days of running the SLED. The decrease in photo-current measured by the on-board photo-detector is consistent with
the decrease in the current set-point and the delivered current, but it is not clear why these should be changing.
Strictly speaking I should add some analysis that shows that delta_PD_voltage_measured = delta_I_set_measured * [delta_PD_voltage/delta_I_set (I_set)]_calculated
    Reply  Thu Jul 29 10:09:19 2010, Aidan, Electronics, SLED, SLED long term test - Day 2 superlum_SLED_ATR.pdf
I've attached the Acceptance Test Report data from SUPERLUM for this SLED. I've also determined the expected percentage decrease in power/photo-current
per mA drop in forward current.
The measured decrease in forward current over the last 2 1/2 days is around 1.4mA from around 111mA. The expected drop in power is thus (4.5% per
Entry  Sat Jul 31 11:54:20 2010, Aidan, Computing, SLED, SLED Test Day 5 - Re-tuned current set-point control voltage 
Main Points

    Re-set SLED current set-point control voltage to 0.111V
    SLED current set-point voltage drops by about 5mV when the SLED
is dis-engaged
    Resetting was around 11:45AM PDT 31st-Jul-2010

I turned off the SLED for 10s and reset the current set-point
Entry  Mon Aug 9 10:58:37 2010, Aidan, Laser, SLED, SLED 15-day trend SLED_superlum_long_term_test_0005A_annotated_15-day_result.pdf
 Here's a plot of the 15-day output of the SLED.
Currently there is an 980nm FC/APC fiber-optic patch-cord attached to the SLED. It occurred to me this morning that even though the patch cord
is angle-cleaved, there may be some back-reflection than desired because the SLED output is 830nm (or thereabouts) while the patch cord is rated for 980nm.
Entry  Thu Feb 4 14:05:59 2010, Aidan, Electronics, Ring Heater, Ring heater transfer function measurement 240mHz-5Hz 
I've been trying to measure the ring heater transfer function (current to emitted power) by sweeping the supply voltage and measuring the emitted power
with a photodector positioned right next to the ring heater.
Last night the voltage was sweeping with a 1000mV setting on the SR785 which was fed into the Voltage Control of the Kepco Bipolar Operational
    Reply  Thu Feb 4 15:26:37 2010, Aidan, Electronics, Ring Heater, Ring heater transfer function measurement 240mHz-5Hz 


    
        
         
  
            Quote:
            
        
        
            
            I've
Entry  Thu Feb 4 19:45:56 2010, Aidan, Misc, Ring Heater, Ring heater transfer function - increasing collection area low-emissivity-tube.jpg
I mounted the thinner Aluminium Watlow heater inside a 14" long, 1" inner diameter cylinder. The inner surface was lined with Aluminium foil
to provide a very low emissivity surface and scatter a lot of radiation out of the end. ZEMAX simulations show this could increase the flux on a PD by
60-100x. 
Entry  Thu Feb 11 18:04:08 2010, Aidan, Laser, Ring Heater, Ring heater time constant 
I've been looking to see what the time constant of the ring heater is. The attached plot shows the voltage measured by the photodiode in response to
the heater turning on and off with a period of 30 minutes.
The time constant looks to be on the order of 600s.
Entry  Thu Feb 11 21:46:23 2010, Aidan, Electronics, Ring Heater, Ring heater time constant measurement - start time 
After leaving the ring heater off for several hours I turned on a 40V, 0.2A supply at a gps time of 949 988 700
The channel recording the PD response is C2:ATF-TCS_PD_HGCDTE_OUT.
However, there is a delay between the time at which something is supposed to be recorded and the time at which it is recorded. I looked
Entry  Fri Feb 12 11:39:28 2010, Aidan, Electronics, Ring Heater, Ring heater transfer function watlow_heater_transfer_fn.jpg
I applied a step function to the silver WATLOW heater and measured the response with the photodiode. The power spectrum of the derivative of the PD response
is attached. The voltage isn't calibrated, but that's okay because right now we're just interested in the shape of the transfer function. It looks like
a single pole around 850uHz. The noise floor is too great above 4 or 5 mHz to say anything about the transfer function.
Entry  Fri Feb 12 21:00:06 2010, Aidan, Electronics, Ring Heater, Ring heater step function response - time series silver_watlow_heater_step_function_response_2010-02-12.pdf
Hideously slow internet at airport is making me write a brief entry. This is the times series of the hesilver watlow heater radiative response to a step
function.
Laso United airlines are a bit cheap ....
Entry  Thu Feb 24 14:20:55 2011, Aidan, Misc, Ring Heater, aLIGO H2 Ring Heater Pics aLIGO_Ring_Heaters.zip
 Here are some pictures of the ring heater segments destined for the H2 Y-arm this year.
 These still need to be put onto ResourceSpace.
Entry  Fri Aug 9 20:33:11 2019, Jon, Electronics, Ring Heater, Power-regulated heater ready to use IMG_3576.jpgIMG_3577.jpg
Despite some considerable time spent, I was not able to get the Omega SCR controllers
working. The first unit definitely arrived damaged. None of its LED indicator lights ever functioned, despite those on the second controller
working fine under the same setup. I tried swapping in the second controller, but it has no voltage output and a red LED is illuminated which, according
Entry  Fri Feb 5 12:42:19 2010, Steve, Electronics, Pre-amplifier, Changes to board 
Test entry
Entry  Mon Feb 8 10:45:50 2010, Steve O'Connor, Electronics, Pre-amplifier, replace Pot with fixed Resistor 
 

            
    Reply  Mon Feb 8 17:44:38 2010, Aidan, Electronics, Pre-amplifier, replace Pot with fixed Resistor 


    
        
            Quote:
        
        
            

            
Entry  Tue Jan 25 16:38:16 2011, Aidan, Electronics, Pre-amplifier, L1 TCSY ISS Board transfer function L1TCS_ISS_boards_transfer_functions.pdfSRS003.78DSRS004.78DSRS005.78DSRS006.78D
 I measured the AC and DC channel transfer functions of the eLIGO L1 TCSY ISS board for PD1 and PD2. The gain is quite high on the AC channels so
I added +40dB of attenuation to the source from the SR785. As Frank pointed out, even though this isn't exactly +40dB at low frequencies, it still attenuates
and that attenuation is common to both the input to the Channel 1 of the SR785 and the input to the ISS board.
Entry  Thu Sep 1 15:51:38 2011, Aidan, Laser, Ordering, Access Lasy50 50W laser arrived. 
 The 50W Access Laser is now in the lab. We need to wire up the interlock to the laser, plumb the chiller lines to the power supply and to the laser
head and also wire up all the electrical and electronics cables. Additionally, we will need to plumb the flow meter and attach a circuit to it that triggers
the interlock if the flow falls too low.
Entry  Fri Oct 26 09:49:47 2018, Aidan, Misc, Optics, Starting 80C cure of epoxy IMG_7054.jpg
I've started an 80C cure of two materials bonded by EPOTEK 353ND. The objective is to see (after curing) how much the apparent glass transition
temperature is increased over a room-temperature cure.
Entry  Wed Jul 24 16:25:13 2019, Edita Bytyqi, Lab Infrastructure, Optics, Updated 2-lens setup 20190724_161926.jpg
The previous 2-lens setup focused the beam to a tight spot, however due to the divergence angle of the laser beam, a significant amount of power was
not being captured by the fiirst lens at a distance of 40 cm from the source. The divergence angle seems to be bigger than 0.06 by a factor of 2, so a
f = 20 cm lens was used to collimate the beam and a f = 30 cm lens was used to focus it. A mirror was used to reflect the beam, so we obtain steering control.
Entry  Mon Jul 29 18:53:16 2019, Edita Bytyqi, Lab Infrastructure, Optics, Mounted Reflector and Heater 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg
Since we set up the 2-lens system focusing the laser beam to the CCD, the next step was to mount the spherical reflector (31 mm wide) and the heater
(~3 mm diameter). I used a small 3-axis stage to mount the heater, providing 3 degrees of freedom that would allow to manipulate the height of the heater,
its position with respect to the reflector (left-right and in-out). The reflector was mounted in such a way that we can control its rotation angle, height
Entry  Thu Aug 1 15:20:39 2019, Edita Bytyqi, Lab Infrastructure, Optics, Reflector Mount and DC Supply 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg
Yesterday, we were able to take some data using the 120 V DC power supply. The reflectors cut at the focal point and radius were both tested; the semi-circle
cut proved to give a better focus, likely because roughly half the heat is lost using the focal-point reflectors. For upcoming tests, the semicircle reflectors
will be used. We varied the surface shine by using the dull and reflective side of Al foil, as well as using the machined Al itself. The best result was
Entry  Sun Apr 24 18:31:18 2011, Aidan, Computing, Network architecture, Added hosts and network drives on TCS machines 
Under edit ...
I added the names of the network machines to the /etc/hosts file on princess_sparkle, tcs_daq and tcs_ws.
I also added the /cvs drive on fb1 to the /etc/fstab file on princess_sparkle so that can be accessed from those machines.
Entry  Mon Apr 25 16:28:27 2011, Aidan, Joe, Computing, Network architecture, Fixed problem network drive fb1:/cvs on Ubuntu & CentOS machines 
With Joe's help we fixed the failure of princess_sparkle to mount the fb1:/cvs directory when relying on /etc/fstab.
First we changed the mounting options in fstab to the following:
fb1:/cvs        /cvs            nfs    
Entry  Thu Dec 15 14:02:01 2016, Aidan, Computing, Network architecture, Correct network settings for Ubuntu 14 in /etc/network/interfaces IMG_8148.JPG
These settings work to get a computer onto the TCS/ATF network.
    Reply  Fri Dec 16 10:41:33 2016, Aidan, Computing, Network architecture, Correct network settings for Ubuntu 14 in /etc/network/interfaces 
Spelt out in a searchable fashion:

auto <portname>

iface <portname> inet static
Entry  Tue Nov 14 19:08:00 2017, Jon Richardson, Computing, Network architecture, Rsync Server for Automatic LDAS Backups 
I implemented an access point for LDAS to pull data from the TCS lab EPICS frame archive (fb4:/frames) via rsync. The setup is analogous to what is already
running at the 40m for automated backups. Here are the implementation details in case we want to replicate this in other W. Bridge labs.

Two lab machines are needed, the frame builder machine (fb4; 10.0.1.156) and a second machine to handle the network interfacing with the outside
Entry  Fri Nov 6 20:09:47 2009, Aidan, Laser, Laser, Test 
 Does this work?