Entry  Mon Jul 26 16:23:03 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room IMG_3881.MOV
 



Koji: QIL/TCS entrance flooding. Check your lab
    Reply  Wed Aug 25 11:28:56 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 
11:29AM - Lab has flooded again this morning. I'm calling PMA. Looks to be the same issue as before.




Quote:



 
       Reply  Thu Aug 26 09:00:39 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 20210825_-_TCS_Lab_Flood_-_compressed.pdf
Some photos of water and clean-up.

Summary: I came into the lab around 11:30AM and found water on the floor in the changing room outside QIL/TCS. Turns out the condesation overflow
pipe from the AC blew out again. This time near the ceiling. Water was on the floor but also had sprayed a little onto the tool chest and East optical
Entry  Thu Aug 12 16:13:44 2021, Aidan, Lab Infrastructure, Flood, Carpentry shop removed wet plaster sections from the wall - it's drying for a few days IMG_4139.jpg
The carpentry shop removed wet plaster sections from the wall following the flood (process was gentle scraping of wet plaster flakes, supervised
by me). The wet section of wall needs a few days to dry and then they will plaster and paint it.

 
Entry  Tue Jul 27 08:39:33 2021, Aidan, Misc, Flood, Tuesday (27-Jul) morning check - lab looks okay Image_Pasted_at_2021-7-27_08-38-2.jpegImage_Pasted_at_2021-7-27_08-38.jpeg
I checked the lab this morning. It was dry and there wall was in the same state as yesterday.
Entry  Tue Jun 15 08:47:27 2021, Aidan, Lab Infrastructure, General, Cleaned up HWS table in preparation for lab move IMG_3056.jpg
I cleaned up the HWS table in preparation for replacement with the 4x10 table. We still need to move the cabinet and get the enclosure out of the way.

 

 
Entry  Wed Oct 30 12:13:14 2019, Jon, Misc, Delivery Note, New lab hardware IMG_3782.jpgIMG_3783.jpgIMG_3784.jpgIMG_3785.jpg
Ian and I moved some new hardware into the lab, shown in the below photos. It is from the shipment of loaned
equipment recently returned by Whitman College. 

Attachment 1:
Entry  Tue Sep 3 10:49:57 2019, Aidan, Lab Infrastructure, General, Exhaust duct added for new bake area in TCS lab IMG_1627.jpgIMG_1629.jpgIMG_1628.jpgIMG_1626.jpg
Facilities came in on Friday and teed off a new duct to provide exhaust for the proposed new vacuum bake area in the TCS Lab. Photos are attached. 

We installed a plastic sheet between the work area and the rest of the lab (the rest of the lab was overpressurized relative to the work area).
Also, they use a vacuum when doing any drilling.
Entry  Fri Aug 16 17:05:14 2019, Edita Bytyqi, Electronics, , FLIR Images of new reflector focusing heat 
We got 11 new semi-circle cut reflectors of radius ~3.6 cm. I glued a screw to the back of one reflector using the same epoxy as for the previous reflectors.
Due to the bigger ROC of the reflector, a tight focus is achievable at greater distances (~15 cm).
Entry  Mon Aug 12 21:15:12 2019, Edita Bytyqi, Electronics, , Determining heater/reflector focus 20190812_151316.jpg20190812_151258.jpg
I took images of the heat pattern projected on a piece of paper produced by the semi-circle reflector. I used 108V to drive current throught he
heater. I tested the reflector without any coating and then with the dull and shiny sides of Al foil. I wasn't able to test the focal-point cut reflector
because I had to glue a screw to it with epoxy which cures overnight. I will do these measurements tomorrow. Figure 2 shows the setup I used to get
Entry  Fri Aug 9 20:33:11 2019, Jon, Electronics, Ring Heater, Power-regulated heater ready to use IMG_3576.jpgIMG_3577.jpg
Despite some considerable time spent, I was not able to get the Omega SCR controllers
working. The first unit definitely arrived damaged. None of its LED indicator lights ever functioned, despite those on the second controller
working fine under the same setup. I tried swapping in the second controller, but it has no voltage output and a red LED is illuminated which, according
Entry  Tue Aug 6 19:22:28 2019, Jon, Electronics, Computing, QIL NFS server set up 
I've started building the NFS server for the QIL cymac. It's sitting on the workbench in the TCS lab next to the rack. Please don't move
it or any of the parts behind it.
Entry  Thu Aug 1 15:20:39 2019, Edita Bytyqi, Lab Infrastructure, Optics, Reflector Mount and DC Supply 20190731_170920.jpg20190801_145836.xcf20190801_145836.jpg20190801_150635.jpg20190801_145842.jpg
Yesterday, we were able to take some data using the 120 V DC power supply. The reflectors cut at the focal point and radius were both tested; the semi-circle
cut proved to give a better focus, likely because roughly half the heat is lost using the focal-point reflectors. For upcoming tests, the semicircle reflectors
will be used. We varied the surface shine by using the dull and reflective side of Al foil, as well as using the machined Al itself. The best result was
Entry  Mon Jul 29 18:53:16 2019, Edita Bytyqi, Lab Infrastructure, Optics, Mounted Reflector and Heater 20190729_185214.jpg20190729_185156.jpg20190729_185153.jpg20190729_185139.jpg20190729_185112.jpg
Since we set up the 2-lens system focusing the laser beam to the CCD, the next step was to mount the spherical reflector (31 mm wide) and the heater
(~3 mm diameter). I used a small 3-axis stage to mount the heater, providing 3 degrees of freedom that would allow to manipulate the height of the heater,
its position with respect to the reflector (left-right and in-out). The reflector was mounted in such a way that we can control its rotation angle, height
Entry  Mon Jul 22 18:44:53 2019, Edita Bytyqi, Things to Buy, General, Need to Order Gloves 
Small/Medium size gloves need to be ordered in order to handle the optics carefully.
    Reply  Thu Jul 25 09:13:36 2019, Jon, Things to Buy, General, Need to Order Gloves 
New gloves are ordered for the TCS and QIL labs. They arrive tomorrow (Friday).




Quote:



Small/Medium size gloves need to be ordered in order to handle the optics carefully.
Entry  Wed Jul 24 16:25:13 2019, Edita Bytyqi, Lab Infrastructure, Optics, Updated 2-lens setup 20190724_161926.jpg
The previous 2-lens setup focused the beam to a tight spot, however due to the divergence angle of the laser beam, a significant amount of power was
not being captured by the fiirst lens at a distance of 40 cm from the source. The divergence angle seems to be bigger than 0.06 by a factor of 2, so a
f = 20 cm lens was used to collimate the beam and a f = 30 cm lens was used to focus it. A mirror was used to reflect the beam, so we obtain steering control.
Entry  Mon Jul 22 18:46:23 2019, Edita Bytyqi, Lab Infrastructure, , Laser-Lens-HWS Setup 20190722_183933.jpg20190722_183928.jpg
Today, I set up a system consisting of the 520 nm laser, a 2'' mirror and two lenses of focal lengths f1 = 40 cm and f2 = 20 cm. The goal was
to collimate the beam coming from the laser, so it goes parallel through the test optic at a radius of ~2.5 cm and then focus it to a radius of ~
1.2 cm to fit the CCD dimensions of the HWS. The mirror was placed about 1 cm close to the laser and the first lens is setup at a distance~f1=40cm from
Entry  Mon Jul 22 09:44:21 2019, Jon, Lab Infrastructure, Computing, Installed Amplifying VGA Splitter IMG_3522.jpgIMG_3421.jpg
The VGA signal outputted by the multiplexer is too weak to drive two monitors. This has required video cables to be manually switched back and forth
between the monitor mounted above the laser table and the desktop console.

Today I solved this problem by installing an amplifying (active) VGA splitter on the video output of the multiplexer. One output of the
Entry  Tue Jun 18 19:05:16 2019, Jon, Lab Infrastructure, General, Large optical table cleared and set up for point absorbers IMG_3421.jpg
Aidan and I continued the lab clean-up today. There's still more to do, but we did fully clear the large optical table which formerly housed the
50 W CO2 laser. I moved the optical enclosure over from the small table to serve as the area for the point absorber experiment. Inside it I mounted
the Hartmann sensor and a 532 nm Thorlabs LED source. The LED still needs collimating/focusing optics to be installed.
Entry  Mon Jun 17 20:29:34 2019, Jon, Lab Infrastructure, Computing, Server rack cleaned up, new workstation installed IMG_3419.jpg
In anticipation of the point absorber SURF project, I cleaned up the server rack and installed a new workstation today.

The workstation replaces the old one, whose hard drive had failed, with a more powerful machine. The hostname (tcs-ws), IP address (10.0.1.168),
user name (controls), and standard password (written in the secret place) are all the same as before.
Entry  Thu May 23 11:36:49 2019, agupta, Lab Infrastructure, Borrowed, Borrowed Label Maker 
I have borrowed TCS's label maker in CTN for few days. If you need it, you can take it from the top of blue cabinets.
Entry  Fri Apr 12 17:40:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station BakeStation_Page_1.jpgBakeStation_Page_2.jpg
I drew up one way we could set up the three available bake ovens in the TCS lab on the single oil pump. 

If this looks feasible to others, we can move the ovens into the TCS lab. Duo and I will be occupied at KNI during Tuesday and Monday morning,
so the usual lab cleanup time may not be the best. Perhaps Monday afternooon we can at least get the ovens out of the hallway and get one of them set up
    Reply  Mon Apr 15 08:12:58 2019, aaron, Lab Infrastructure, General, Measurements for Bake Station 
My preference is to have tubes back towards the wall where possible. We might be able to drill a large diameter hole in the table top to accommodate
them.

We have to get confirmation that the exhaust can be extracted - otherwise this whole thing is moot.
Entry  Fri Feb 8 10:48:33 2019, Aidan, Lab Infrastructure, General, Water damage repair work in the TCS Lab 
Caltech Facilities has determined that the walls in the SE corner of the TCS Lab in West Bridge were water damaged during last weekend’s rain.
They are going to remove the plaster from the walls and dehumidify the area for a week or so. All tables in the room are going to be covered with plastic
for this process. In the short term I’ve shutdown all the equipment in the lab (including FB4). The 2-micron cavity-testing fabrication has been
Entry  Tue Dec 4 16:57:08 2018, Aidan, Computing, Hartmann sensor, Updated GIT version of HWS code 
I changed the HWS code to the new git.ligo HWS version.


Object files are in ~/hws
scripts are in ~/hws-server
utilities are still in old git repo moved to ~/.HWS_code_temporary_home


I've
set up some symbolic links to these directories to mimic the old directory structure, so ..
Entry  Fri Oct 26 09:49:47 2018, Aidan, Misc, Optics, Starting 80C cure of epoxy IMG_7054.jpg
I've started an 80C cure of two materials bonded by EPOTEK 353ND. The objective is to see (after curing) how much the apparent glass transition
temperature is increased over a room-temperature cure.
Entry  Thu Aug 16 11:52:27 2018, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 

Thermcouple reader is plugged into an Acromag ADC (10.0.1.55)
acromag1 is now reading this in:

~/modbus/iocBoot/iocTest/test_acromag.cmd
(contains ip address of ADC)
~/modbus/db/TEMPMONCHANS.db (contains the EPICS channel definitions and calibration of thermocouple reader)


C4:AWC-TEMPMON_C
(output channel)


Restored work done in http://nodus.ligo.caltech.edu:8080/TCS_Lab/201
    Reply  Wed Oct 17 16:17:45 2018, awade, Aidan, Computing, DAQ, Added AWC thermocouple reader back to acromag1 TCSIOCFILS.tar.gz
Acromag IOC process was removed from PSL lab acromag1 computer a few months ago.  Aidan needs them again but it would be better if it were run from
TCS lab computers.

An instance of the modbus IOC is now running on tcs-ws within a docker container.  Docker is named tcslabioc.  Configuration files
Entry  Fri Aug 3 15:46:12 2018, Aria Chaderjian, Laser, General, August 3, 2018 
To the best of my ability, calculated the magnification of the plane of the test optic relative to the HWS (2.3) and input this value.

Increased the temperature slightly and saved data points of defocus to txt files when temperature leveled out. This was a slow process, as it
takes a while for things to level out. I only got up to about 28.5C, and will need to continue this process.
Entry  Tue Jul 24 16:52:44 2018, Aria Chaderjian, Laser, General, July 23, 2018 and July 24, 2018 
Attached the grid array of the HWS.

Applied voltage (5V, 7V, 9.9V, 14V) to the heater pad and took measurements of T and spherical power (aka defocus).

The adhesive of the temperature sensor isn't very sticky. The first time I did it it peeled off. (Second time partially peeled off).
Entry  Mon Jul 23 10:04:19 2018, Aria Chaderjian, Laser, General, July 20, 2018 37767216_2077953269190954_5080703241788850176_n.jpg
With Jon's help, I changed the setup to include a mode-matching telescope built from the f=60mm (1 inch diameter) lens and the f=100mm lens. These
lenses are located after the last gold mirror and before the test optic. The height of the beam was also adjusted so that it is more centered on these
lenses. Note: these two lenses cannot be much further apart from each other than they currently are, or the beam will be too large for the f=100mm lens.
Entry  Fri Jul 13 16:42:50 2018, Aria Chaderjian, Laser, General, July 13, 2018 
The table is set up. The HWS and SLED were moved slightly, and a minimal angle between the test mirror and HWS was achieved.

There are two possible locations for the f=60mm lens that will achieve appropriate magnification onto the HWS: 64cm or 50 cm from the
f=200mm lens. 
Entry  Thu Jul 12 18:48:21 2018, Aria Chaderjian, Laser, General, July 12, 2018 
The beam reflecting off the test mirror was clipping the lens between gold mirror and test mirror, so I reconfigured some of the optics, unfortunately resulting
in a larger angle of incidence.

From the test mirror, the beam size increases much too rapidly to fit onto the 2-inch diameter lens with f=8 that was meant to resize the beam
Entry  Tue Jul 10 17:49:13 2018, Aria Chaderjian, Laser, General, July 10, 2018 IMG_4518.jpgIMG_4517.jpg
Went down to the lab and showed Rana the setup. He's fine with me being down there as long as I let someone know. He also recommended using an adjustable
mount  (three screws) for the test mirror instead of the mount with top bolt and two nubs on the bottom - he thinks the one with three screws as constraints
for the silica will be easier to model (and be more symmetric constraints)
Entry  Thu Jun 21 17:12:38 2018, Aidan, Laser, Hartmann sensor, Two inch PBS from Edmund Optics - effect on ETM HWS transmission PBS_Thorlabs_v_EdmundOptics.pdf
I'm considering the 86-711 2" 532nm PBS from Edmund Optics for the ETM HWS at the sites.

https://www.edmundoptics.com/optics/polarization/linear-polarizers/532nm-50mm-diameter-high-energy-laser-line-polarizer/

The effect on the transmission through the system, compared to the THorlabs PBS, is shown in the attached plot.
Entry  Thu Nov 9 14:18:56 2017, Aidan, Computing, DAQ, FB4 ip address has changed 
We've had trouble logging into FB4. I access the computer directly in the AWC lab and found that the IP address had changed from 10.0.1.156 to 10.0.1.161.

I'm not sure how this happened. It's possible that the IP address is not set to a static value and FB4 was rebooted. I'm not familar
with Debian so I don't know where to look to find whether the IP address is static or not.
    Reply  Wed May 30 18:59:49 2018, awade, Computing, DAQ, FB4 ip address has changed 
Maybe you've resolved this now. I moved the DHCP allocation to 10.0.1.160 and above around that time because a bunch of misc devices were starting
to populate the dynamically allocated IP space around there.  I'd say FB4 was not setup with a manual IP at the time.

 
Entry  Mon Feb 5 15:08:06 2018, Aidan, Computing, DAQ, Frame builder clock is totally wrong 
The framebuilder on FB4 thinks the current time is 26-Jan-2018 6:18AM UTC. The date command on FB4 yields the correct date and time (5-Feb-2018 15:17
PST).

There is a major error with the framebuilder clock.
    Reply  Wed May 30 18:50:05 2018, awade, Computing, DAQ, Rebooted fb4 
Time was still off by nine days as of yesterday.  I tried rebooting remotely to see if time would correct to system clock.  It didn't and
fb4 hung.

Just manually restarted the box.  Now dataviewer is showing a 'Time Now'  of 5 Jan 1980.   
Entry  Fri May 11 12:32:21 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher LED_test_01_20180511.pdf
 [Aidan, Marie]

We tested the output of the fiber launcher D1800125-v3. We were using a 6mm spacer in the SM1 lens tube and 11mm spacer in the SM05 lens tube
and the 50 micron core fiber.
    Reply  Fri May 11 16:18:47 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher LED_test_02_20180511.pdf
And here's the output of the fiber launcher when I fixed it at 313mm from the camera, attached an iris to the front and slowly reduced the aperture
of the iris.

The titles reflect the calculated second moment of the intensity profiles (an estimate of the equivalent Gaussian beam radius). The iris is successful
       Reply  Wed May 16 16:47:29 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher - D1800125-v5_SN01 HWS_LED_D1800125_V5_sn01.pdfHWS_LED_D1800125_V5_sn01.mHWS_D1800125-v5_sn01_characterize_20180516.tar
Here is the output from D1800125-v5_SN01.




Quote:



And here's the output of the fiber launcher when I fixed it at 313mm from the camera, attached an iris to
          Reply  Fri May 18 16:32:37 2018, Aidan, Laser, Hartmann sensor, HWS green LED fiber launcher - D1800125-v5_SN01 
Title was wrong - this is actually config [12,2,4,125]




Quote:



Here is the output from D1800125-v5_SN01.
Entry  Thu Feb 8 15:42:13 2018, Aidan, Laser, Laser, Low power CO2 laser [400mW] beam size measurement L3_CO2_laser_beam_size.mL3_CO2_Laser_154507-154935.pdf
I did a beam size/beam propagation measurement of the low power CO2 laser (Access Laser L3, SN:154507-154935)

 
Entry  Thu Jan 18 10:09:50 2018, Jon Richardson, Laser, General, RIN Measurement of 400 mW CO2 Laser in Progress 
The 400 mW CO2 laser on the Hartmann table is currently configured for a measurement of its relative intensity noise. It is aligned to a TCS CO2P photodetector
powered by a dual DC power supply beside the light enclosure. I got some data last night with the laser current dialed back for low output power (0.5-10 mW
incident), but still need to analyze it. In the meantime please don't remove parts from the setup, as I may need to repeat the measurement with better
    Reply  Mon Jan 22 10:39:32 2018, Jon Richardson, Laser, General, RIN Measurement of 400 mW CO2 Laser in Progress SRM_CO2_RIN_v1.pdf
Attached for reference is the RIN measurement from the initial data.




Quote:



The 400 mW CO2 laser on the Hartmann table is currently configured for a measurement of its relative intensity
Entry  Tue Nov 14 19:08:00 2017, Jon Richardson, Computing, Network architecture, Rsync Server for Automatic LDAS Backups 
I implemented an access point for LDAS to pull data from the TCS lab EPICS frame archive (fb4:/frames) via rsync. The setup is analogous to what is already
running at the 40m for automated backups. Here are the implementation details in case we want to replicate this in other W. Bridge labs.

Two lab machines are needed, the frame builder machine (fb4; 10.0.1.156) and a second machine to handle the network interfacing with the outside
Entry  Tue Oct 31 14:37:49 2017, Aidan, Computing, DAQ, New Acromag units for AWC experiments - XT1221 ans XT1541 
I set up an Acromag DAC today with the fixed IP address 10.0.1.56. Last Friday Andrew and Antonio set up an ADC unit with fixed IP address 10.0.1.55.
The former is for outputting a control voltager that goes to the driver for the heater on composite mirror we are testing. The latter is used to read
the temperature of the thermocouple on the composite mirror. The thermocouple to voltage conversion is achieved with a Type
Entry  Mon Oct 30 17:13:32 2017, Jon Richardson, Laser, Hartmann sensor, Write-Up of CO2 Projector Measurements awc_srm_actuator_v1.pdf
For archive purposes, attached is a write-up of all the HWS measurements I've made to date for the SRM CO2 projector mock-up.
Entry  Thu Oct 26 10:21:28 2017, Aidan, Computing, , Beam size EPICS channels added to TCS-WS softIoc 
I've added a softIoc to TCS-WS to capture the beam size from the MAKO camera. The IOC is run using ...

controls@tcs-ws:~$ softIoc -S EPICS_IOC/iocBoot/iocfirst/st.cmd &

The st.cmd contains the following text:
    Reply  Thu Oct 26 10:31:31 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc 
These are also being written to frames on FB4.




Quote:



I've added a softIoc
       Reply  Thu Oct 26 10:45:44 2017, Aidan, Computing, DAQ, Beam size EPICS channels added to TCS-WS softIoc FullSizeRender_10.jpg
See attached photo for how data is written to frames ...




Quote:



These are also being
Entry  Wed Oct 25 15:34:14 2017, Jon Richardson, Computing, Frame Grabber, Mako CCD Camera Code is Fixed 
I fixed a bug in how the raw Mako CCD camera images are being read into memory. The bmp files turn out to have a block memory layout that broke my in-place
reader.
Entry  Tue Oct 24 15:05:57 2017, Jon Richardson, Computing, Electronics, Installed a Realtime Beam Profiler for the Mako CCD Camera 
Aidan found a C demo code for acquiring a single image from the Mako CCD camera and saving it to disk (SynchronousGrab -- aliased on tcs-ws as makoGrab).
I wrapped that inside my realtime HWS beam profiler code to create a realtime beam profiler for the Mako camera. The interface is identical to that for
the HWS.
Entry  Fri Oct 13 18:35:29 2017, Jon Richardson, Computing, Electronics, Installed Maku Ethernet CCD Camera IMG_2287.JPG
I installed the Maku Gigabit CCD camera driver software on the hws-ws machine. The camera viewer can be opened from the terminal (from any directory)
with the command

$ZimbaViewer
    Reply  Tue Oct 24 10:19:53 2017, Jon Richardson, Computing, Electronics, Installed Maku Ethernet CCD Camera 
There is an SDK for the camera with compiled examples. For a really quick image grab from the command line, use the following:

/opt/Vimba_2_1/VimbaC/Examples/Bin/x86_64bit/SynchronousGrab

This will produce a BMP image. We should probably recompile the C code to produce a 16-bit TIFF image.
Entry  Mon Oct 23 19:02:42 2017, Jon Richardson, Laser, Hartmann sensor, Mitigated Heating Beam Losses 
There were known to be huge (65%) heating beam power losses on the SRM AWC table, somewhere between the CO2 laser and the test optic. Today I profiled
the setup with a power meter, looking for the dominant source of losses. It turned out to be a 10" focusing lens which had the incorrect coating for
10.2 microns. I swapped this lens with a known ZnSe 10" FL lens (Laser Research Optics LX-15A0-Z-ET6.0) and confirmed the power transmittance to be
Entry  Fri Oct 13 15:52:41 2017, Aidan, Lab Infrastructure, General, Broadband mirror BB2-E03 reflectivity at 532nm IMG_1223.JPGIMG_1213.JPG
I measured the reflectivity of a possible HWS replacement mirror at 532nm. Thorlabs
BB2-EO3

Incident power = 1.28mW
Entry  Wed Oct 11 20:19:06 2017, Jon Richardson, Lab Infrastructure, Hartmann sensor, Initial Characterization of the SRM Adaptive Wavefront Control thermal_lens.png
Today I made the first characterization measurements of the mocked-up adaptive wavefront control system planned for the signal recycling mirrors.

The Setup

Inside the light-tight enclosure on the center table, I've assembled and aligned a 10.2 micron CO2 projector
which provides a heating beam of up to 150 mW incident on an SRM-like test optic. A co-aligned 633 nm probe beam and Hartmann wavefront sensor
Entry  Wed Oct 11 19:14:16 2017, Jon Richardson, Computing, Electronics, Replaced TCS Monitor 
I replaced the dead 24" monitor on the work bench, which is connected to the video multiplexer. Mike Pedraza was kind enough to bring us us
a new one and take away the old one.
Entry  Thu Sep 21 18:56:53 2017, awade, Misc, Borrowed, Borrowed thorlabs power meter 
Borrowed thorlabs power meter on 21 Sep 2017.  It is on the south table of the ATF lab.
Entry  Thu Jul 13 10:11:57 2017, awade, Electronics, Borrowed, Borrowed newport TrueRMS Supermeter 2017-07-13_10.06.28.jpg2017-07-13_10.06.29.jpg
I lent your fancy Newport TrueRMS Supermeter with the thermocouple plugs on the top to the SURF student Jordon.  He has it in the cryo lab or the
EE workshop with one of the PSL lab temperature probes.
Entry  Mon Jun 5 16:41:59 2017, Aidan, Laser, Hartmann sensor, HWS long term measurement results. HWS_envelope_long_term.pdfHWS_optical_parameters_long_term.pdfHWS_envelope_long_term_mm.pdfIMG_9836.JPG
The data from the long-term measurement of the HWS is presented here. The beam envelope moves by, at most, about 0.3 pixels, or around 3.6 microns.
The fiber-launcher is about 5" away from the HWS. Therefore, the motion corresponds to around 30 micro-radians (if it is a tilt). The beam displacement
is around 4 microns.
ELOG V3.1.3-