40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog  Not logged in ELOG logo
Message ID: 96     Entry time: Tue Sep 28 17:53:40 2010
Author: Aidan 
Type: Laser 
Category: Hartmann sensor 
Subject: Crude alignment of cross-sampling measurement 

I've set up a crude alignment of the cross-sampling system (optical layout to come). This was just a sanity check to make sure that the beam could successfully get to the Hartmann sensor. The next step is to replace the crappy beam-splitter with one that is actually 50/50.

Attached is an image from the Hartmann sensor.

Attachment 1: 2010_09_28-HWS_cross_sample_expt_crude_alignment_01.pdf  61 kB  | Hide | Hide all
2010_09_28-HWS_cross_sample_expt_crude_alignment_01.pdf
ELOG V3.1.3-