40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog  Not logged in ELOG logo
Entry  Mon Jul 26 16:23:03 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room IMG_3881.MOV
    Reply  Wed Aug 25 11:28:56 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 
       Reply  Thu Aug 26 09:00:39 2021, Aidan, Misc, Flood, Lab flooded from broken pipe leading to sump room 20210825_-_TCS_Lab_Flood_-_compressed.pdf
Message ID: 249     Entry time: Thu Aug 26 09:00:39 2021     In reply to: 248
Author: Aidan 
Type: Misc 
Category: Flood 
Subject: Lab flooded from broken pipe leading to sump room 

Some photos of water and clean-up.

Summary: I came into the lab around 11:30AM and found water on the floor in the changing room outside QIL/TCS. Turns out the condesation overflow pipe from the AC blew out again. This time near the ceiling. Water was on the floor but also had sprayed a little onto the tool chest and East optical table. A few optics got wet on the table. Initial inspection looks like electronics were spared with the exception of the "broken" spectrum analyzer that was on the floor. 

Facilities came in and cleaned up the water. A small amount got into QIL but stayed near the door as the lab floor slopes up from the door area. They fixed the pipe and were looking into whether there was a blockage cuasing this problem. PMA was notified and John Denhart is coordinating follow-up.

Triage effort: given the AC was still active, John and I strung a temporary tarp across the two tables to block any spray.

Quote:

11:29AM - Lab has flooded again this morning. I'm calling PMA. Looks to be the same issue as before.

Quote:

 

Koji: QIL/TCS entrance flooding. Check your lab

Anchal: Can someone take a look at CTN too?

Koij: TCS needs more people @aidan

Koji: CTN ok

Aidan: On my way

Shruti: Cryo seems fine

Aidan: There was a leak in a pipe in the wall of B265A. It was coming from the building air conditioner condensation overflow. Facilities has fixed the pipe and is working on clean-up

 

 

Attachment 1: 20210825_-_TCS_Lab_Flood_-_compressed.pdf  863 kB  Uploaded Thu Aug 26 10:14:05 2021  | Hide | Hide all
20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf 20210825_-_TCS_Lab_Flood_-_compressed.pdf
ELOG V3.1.3-