40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog  Not logged in ELOG logo
Message ID: 247     Entry time: Thu Aug 12 16:13:44 2021
Author: Aidan 
Type: Lab Infrastructure 
Category: Flood 
Subject: Carpentry shop removed wet plaster sections from the wall - it's drying for a few days 

The carpentry shop removed wet plaster sections from the wall following the flood (process was gentle scraping of wet plaster flakes, supervised by me). The wet section of wall needs a few days to dry and then they will plaster and paint it.

 

Attachment 1: IMG_4139.jpg  1.161 MB  Uploaded Thu Aug 12 17:16:27 2021  | Hide | Hide all
IMG_4139.jpg
ELOG V3.1.3-