40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  TCS elog  Not logged in ELOG logo
Message ID: 179     Entry time: Fri Jun 29 15:51:24 2012
Author: Aditi Mittal 
Type: Misc 
Category: LIGO 3G 
Subject: Summary June 28 and 29, 2012 

 -Discussed the project outline for next 6 weeks.

-made a write up for the tasks. (attached)

-Analyzed the variation of temperature of the test mass with input power for different lengths of the shield. 

Attachment 1: pipelength_power.xlsx  14 kB
Attachment 2: 6week_plan.doc  39 kB
ELOG V3.1.3-