40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  ATF eLog  Not logged in ELOG logo
Entry  Mon May 3 17:32:29 2021, Radhika, Summary, 2um Photodiodes, Updated PD testing schematic / measurement table QIL_PD_testing.graffleQIL_PD_testing.pdfScreen_Shot_2021-05-03_at_17.16.20.png
    Reply  Wed May 5 00:34:14 2021, rana, Summary, 2um Photodiodes, Updated PD testing schematic / measurement table 
       Reply  Mon May 10 15:38:36 2021, rana, Summary, 2um Photodiodes, Keithley connections Screen_Shot_2021-05-10_at_3.37.29_PM.png
Message ID: 2566     Entry time: Mon May 10 15:38:36 2021     In reply to: 2564
Author: rana 
Type: Summary 
Category: 2um Photodiodes 
Subject: Keithley connections 

Note that the back panel connectors are Triax, not the usual Coax.

ELOG V3.1.3-