40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 9 of 13
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
623 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
,
12
,
13
Next
Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO
Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending
Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom
Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components
Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed
Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending
Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending
Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending
Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican
Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending
Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich
Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate
Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan
Tue Apr 5 18:14:55 2016, Koji, General, Loan / Lending, QPD Lending Crackle
Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement
Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory
Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement
Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT
Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn
Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending
Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup
Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup
Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup
Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes
Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed
Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm
6x
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab
Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking
Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection
Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)
6x
Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)
8x
Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)
7x
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
,
12
,
13
Next
ELOG V3.1.3-