40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 9 of 13  Not logged in ELOG logo
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
Entry  Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom 
Entry  Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components 
Entry  Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed 
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
    Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
    Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
Entry  Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican 
    Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
Entry  Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich 
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
Entry  Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan 
Entry  Tue Apr 5 18:14:55 2016, Koji, General, Loan / Lending, QPD Lending Crackle 
Entry  Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement 
Entry  Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory 
Entry  Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement  
Entry  Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT 
Entry  Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn 
    Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
Entry  Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned DSC_0082.jpgDSC_0084.jpg
    Reply  Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
Entry  Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup 
    Reply  Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup 
    Reply  Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup 
Entry  Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes 
Entry  Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed DSC_0360.JPG
Entry  Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
Entry  Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December 
Entry  Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg
Entry  Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab 40mLabModIndexSetup.pdf
    Reply  Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab modulation_depth.pdfmodulation_depth_zoom.pdf
Entry  Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion 
Entry  Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items 
Entry  Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg
Entry  Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding  
    Reply  Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding  
Entry  Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking temp_profile.pdfbake.xlsx
Entry  Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection 
    Reply  Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
    Reply  Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
    Reply  Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
    Reply  Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)  IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg
Entry  Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection A_Mirror_selection.pdf
Entry  Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs 
Entry  Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG
Entry  Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg
Entry  Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR CM1_IMG_7699.jpgCM2_IMG_7697.jpg
    Reply  Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd misalignment4.pdf
    Reply  Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table 
ELOG V3.1.3-