Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan
|
Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List
|
Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched
|
Wed Jun 20 20:37:45 2012, Zach, Optics, Configuration, Topology / parameter selection 8x
|
Thu Jun 21 03:07:27 2012, Zach, Optics, Configuration, Parameter selection / mode definition 
|
Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July
|
Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO
|
Fri Jun 29 11:26:04 2012, Zach, Optics, Characterization, RoC measurement setup 
|
Sun Jul 22 15:56:53 2012, Zach, Optics, Characterization, RoC measurement setup 
|
Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references
|
Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!]
|
Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!]
|
Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect  
|
Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier
|
Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log
|
Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts
|
Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack 
|
Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools 
|
Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts
|
Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts
|
Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup 
|
Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response
|
Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup 
|
Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup 
|
Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF
|
Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions
|
Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!]
|
Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!]
|
Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked  
|
Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1) 
|
Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!]
|
Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!]
|
Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement
|
Thu Nov 8 19:47:55 2012, Koji, Electronics, Configuration, Solder for PZTs
|
Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy
|
Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate
|
Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement 
|
Sat Nov 17 02:31:34 2012, Koji, Optics, Characterization, Mirror T test
|
Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement 
|
Mon Nov 19 13:33:14 2012, Koji, Optics, Characterization, Resuming testing mirror RoCs
|
Mon Nov 26 01:40:00 2012, Koji, Optics, Characterization, More RoC measurement
|
Thu Nov 29 21:18:23 2012, Koji, Optics, General, OMC Mounting Prisms have come 
|
Tue Dec 18 20:04:40 2012, Koji, Optics, Characterization, Prism Thickness Measurement
|
Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot
|
Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot
|
Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired  
|
Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!]
|
Mon Dec 31 03:10:09 2012, Koji, Optics, General, SolidWorks model of the OMC breadboard 
|
Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement
|
Wed Jan 2 07:35:55 2013, Koji, Optics, Characterization, Thickness of a curved mirror
|
Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test 
|
Sun Jan 6 23:22:21 2013, Koji, Mechanics, General, SolidWorks model of the OMC suspension 
|
Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism
|
Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration
|
Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator
|
Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed
|
Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection
|
Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m 
|
Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test
|
Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test 
|
Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test
|
Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final
|
Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Tue Mar 5 19:37:00 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details
|
Wed Mar 6 23:24:58 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details   
|
Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts    
|
Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 
|
Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test
|
Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing
|
Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD
|
Wed Mar 20 09:38:02 2013, Zach, Optics, Characterization, [LLO] OMC test bench modified
|
Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered
|
Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC  
|
Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued   
|
Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement 
|
Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing   
|
Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building
|
Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
|
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
|
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
|
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
|
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
|
Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints
|
Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration
|
Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface  
|
Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
|
Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test
|
Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built
|
Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity
|
Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test 
|
Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure 
|
Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress  
|
Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber
|
Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber
|
Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken
|
Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links
|
Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO
|
Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement
|
Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned 
|
Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing
|
Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures
|
Wed Apr 10 00:40:30 2013, Zach, Optics, Configuration, fauxMC locked
|
Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress
|
Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue)
|
Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued 
|
Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation
|
Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement
|
Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement
|
Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement
|
Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement
|
Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued
|
Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure
|
Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing
|
Fri May 3 21:09:08 2013, Koji, General, General, OMC is back
|
Mon May 6 19:31:51 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts   
|
Wed May 8 15:08:57 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts   
|
Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress
|
Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress
|
Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing
|
Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking
|
Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven
|
Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule
|
Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule
|
Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule
|
Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount
|
Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting
|
Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment
|
Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment  
|
Fri May 31 14:07:54 2013, Koji, Optics, Characterization, Transverse Mode Spacing measurement afte the baking 
|
Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests
|
Mon Jun 3 21:19:03 2013, Koji, General, General, Planning
|
Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram
|
Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT
|
Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out 
|
Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived
|
Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test  
|
Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed
|
Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA
|
Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status
|
Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis
|
Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6
|
Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp
|
Sat Jul 6 17:10:07 2013, Koji, Mechanics, Characterization, PZT Response analysis 
|
Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4
|
Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6
|
Tue Apr 16 09:43:58 2013, Koji, Optics, Configuration, Mirror list for L1OMC
|
Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002)
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
|
Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started
|
Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment
|
Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing
|
Thu Aug 22 15:40:15 2013, Koji, Electronics, Configuration, PZT endurance test   
|
Fri Aug 23 19:24:32 2013, Koji, Electronics, Configuration, PZT endurance test (II)
|
Tue Aug 27 17:02:31 2013, Koji, Mechanics, Characterization, Spot position measurement on the diode mounts
|
Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment 
|
Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV)
|
Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment 
|
Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing
|
Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions   
|
Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing 
|
Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed
|
Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab.
|
Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping
|
Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done 
|
Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing
|
Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget
|
Tue Oct 15 18:50:08 2013, Koji, Optics, Characterization, QPD alignment
|
Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment
|
Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling
|
Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment
|
Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed
|
Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement
|
Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy
|
Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos
|
Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC
|
Mon Mar 3 02:46:21 2014, Koji, General, Characterization, Spot positions scanned
|
Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation
|
Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment
|
Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity 
|
Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity 
|
Fri May 16 00:13:36 2014, Koji, Optics, Characterization, Cavity mirror gluing part 1
|
Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued 
|
Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued
|
Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued
|
Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed
|
Fri Jun 27 18:51:33 2014, Koji, General, General, Supply
|
Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly
|
Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking
|
Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking
|
Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement
|
Sun Jul 6 02:46:20 2014, Koji, Optics, Characterization, OMC power budget
|
Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept  
|
Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept
|
Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination
|
Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination
|
Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps
|
Tue Jul 8 18:54:54 2014, Koji, Mechanics, Characterization, PZT characterization 
|
Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire
|
Mon Jul 7 01:36:03 2014, Koji, General, General, To Do
|
Thu Jul 10 08:34:57 2014, Koji, General, General, To Do
|
Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD
|
Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD
|
Sun Jul 13 17:46:28 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:00:42 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:34:16 2014, Koji, Optics, Characterization, OMC backscatter measurement 
|
Thu Jul 17 02:19:20 2014, Koji, Mechanics, Characterization, I1OMC vibration test 6x
|
Sun Jul 20 17:19:50 2014, Koji, Mechanics, Characterization, I1OMC vibration test ~ 2nd round 9x
|
Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO
|
Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom
|
Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components
|
Wed Aug 27 23:13:13 2014, Koji, Optics, Characterization, Collection of the power budgetting info
|
Mon Jul 21 01:02:43 2014, Koji, Mechanics, Characterization, Some structual mode analysis 6x
|
Tue Sep 9 20:59:19 2014, Koji, Mechanics, Characterization, Structural mode analysis for the PZT mirror 6x
|
Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed
|
Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican
|
Wed Jul 15 22:23:17 2015, Koji, Electronics, AM Stabilized EOM Driver, E1400445 first look 
|
Sat Jul 18 11:37:21 2015, Koji, Electronics, AM Stabilized EOM Driver, D0900848 power board ~ oscillation issue solved 6x
|
Wed Jul 22 09:43:01 2015, Koji, Electronics, AM Stabilized EOM Driver, Power supply test of the EOM/AOM Driver
|
Wed Jul 22 10:15:14 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117
|
Sat Jul 25 17:24:11 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117 7x
|
Tue Jul 28 18:36:50 2015, Koji, Electronics, AM Stabilized EOM Driver, RF test of the EOM/AOM Driver S1500117  
|
Thu Aug 20 01:35:01 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test 
|
Wed Aug 26 11:31:33 2015, Koji, Electronics, General, OMC DCPD in-vacuum electronics chain test
|
Sun Sep 6 16:50:51 2015, Koji, Electronics, General, Unit test of the EOM/AOM Driver S1500118 
|
Mon Aug 10 02:11:47 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151  
|
Mon Aug 10 11:39:40 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151
|
Mon Aug 10 11:57:17 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151
|
Mon Aug 10 12:09:49 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151
|
Fri Aug 28 01:08:14 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ Calibration 
|
Fri Aug 28 02:14:53 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement
|
Tue Sep 8 10:55:31 2015, Koji, Electronics, AM Stabilized EOM Driver, RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement
|
Tue Sep 8 11:18:10 2015, Koji, Optics, Characterization, PBS Transmission measurement  
|
Wed Sep 9 01:58:34 2015, Koji, Optics, Characterization, PBS Transmission measurement
|
Thu Sep 10 04:03:42 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)   
|
Wed Sep 23 17:49:50 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)
|
Tue Dec 15 13:38:34 2015, Koji, Electronics, Characterization, EOM Driver linearity check 
|
Tue Dec 15 13:39:13 2015, Koji, Electronics, Characterization, Phase noise measurement of aLIGO EOM drivers 
|
Tue Dec 15 13:42:37 2015, Koji, Optics, Characterization, Dimensions / packaging of HQE PDs   
|
Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich
|
Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate
|
Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan
|
Sun Mar 6 02:13:28 2016, Koji, Optics, Characterization, PD glass reflections 
|
Sat Feb 20 19:11:22 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs  
|
Sun Mar 13 21:22:27 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs
|
Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison)
|
Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE 
|
Tue Apr 5 18:14:55 2016, Koji, General, Loan / Lending, QPD Lending Crackle
|
Sat Mar 26 17:39:50 2016, Koji, Electronics, Characterization, HQEPD dark noise
|
Sat Mar 26 18:22:24 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs
|
Tue Apr 5 18:22:40 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs
|
Tue Apr 5 21:20:15 2016, Koji, Electronics, Characterization, More dark noise measurement
|
Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement
|
Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory
|
Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement
|
Mon Aug 15 10:09:10 2016, Koji, General, General, Prev H1 OMC shipped to CIT
|
Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn
|
Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 7x
|
Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC)
|
Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs
|
Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
|
Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
|
Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
|
Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
|
Thu Jan 19 20:57:53 2017, Koji, Supply, General, Purchase
|
Thu Feb 16 17:23:12 2017, Koji, Supply, General, Purchase
|
Tue May 16 19:05:18 2017, Koji, Optics, Configuration, OMC SN002 fix - temporary optics
|
Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup
|
Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup
|
Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup
|
Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing 6x
|
Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps?
|
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002    
|
Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes
|
Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed
|
Tue Mar 28 21:04:27 2017, Koji, Electronics, Characterization, PDH amp 6x
|
Sat Jul 29 18:44:38 2017, rana, Electronics, Characterization, PDH amp
|
Sat Jul 29 21:42:51 2017, Koji, Electronics, Characterization, PDH amp
|
Fri Sep 8 15:14:05 2017, Koji, Facility, General, Preparation for the plumbing work 7x
|
Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
|
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
|
Thu Feb 22 20:21:02 2018, Koji, Optics, Characterization, aLIGO EOM test
|
Mon Apr 2 17:27:04 2018, Koji, Optics, Characterization, aLIGO EOM test
|
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
|
Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test
|
Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison
|
Wed May 30 16:40:38 2018, Koji, Mechanics, Characterization, EOM mount stability test
|
Wed May 30 17:44:23 2018, Koji, Optics, Characterization, 3IFO EOM surface check    
|
Mon Jul 2 12:29:01 2018, Koji, Electronics, Characterization, Impedances of individual components (3IFO EOM)    
|
Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit)
|
Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM
|
Mon Jul 2 11:30:22 2018, Koji, Electronics, Characterization, 3IFO EOM impedance measurement 
|
Wed Jul 4 18:30:51 2018, Koji, Electronics, Characterization, EOM circuit models    
|
Thu Jul 26 20:57:07 2018, Koji, Electronics, Characterization, 9MHz port tuned impedance  
|
Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed  
|
Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab
|
Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab 
|
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
|
Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror   
|
Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
|
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
|
Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002
|
Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable
|
Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect
|
Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation
|
Sat Feb 2 16:17:13 2019, Koji, Optics, Characterization, Summary: OMC(001) HOM structure recalculation   
|
Sat Feb 2 20:03:19 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (before mirror replacement)   
|
Sat Feb 2 20:28:21 2019, Koji, Optics, Characterization, Summary: OMC(003) HOM structure recalculation   
|
Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)   
|
Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items
|
Thu Mar 28 16:36:52 2019, Koji, Mechanics, Characterization, OMC(002) PZT characterization 
|
Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase
|
Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images  
|
Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment   
|
Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment 
|
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed  
|
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
|
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
|
Thu Apr 11 12:15:31 2019, Koji, Mechanics, Configuration, PZT sub assy mirror orientations 
|
Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing 
|
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking 
|
Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection
|
Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
|
Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
|
Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
|
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)   
|
Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection
|
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
|
Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection
|
Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection
|
Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC
|
Tue Apr 16 11:36:36 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 9x
|
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
|
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
|
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard    
|
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
|
Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics  
|
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking 
|
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking    
|
Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking
|
Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions 
|
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR 
|
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
|
Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors  
|
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
|
Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow
|
Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
|
Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
|
Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture 
|
Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy
|
Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 
|
Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? 
|
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
|
Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test 
|
Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test)
|
Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test 
|
Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test 
|
Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
|
Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH
|
Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement 6x
|
Mon Jul 1 12:49:42 2019, Koji, Optics, Characterization, Scattering measurement of A and C mirrors 
|
Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom 
|
Thu Jan 10 18:37:50 2013, Koji, Optics, Characterization, Wedging of the PZTs
|
Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August 
|
Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation 
|
Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly  
|
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
|
Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding 
|
Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding
|
Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding
|
Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!
|
Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) 
|
Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)   
|
Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake 
|
Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 
|
Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019
|
Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav
|
Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
|
Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending
|
Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending
|
Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending
|
Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending    
|
Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending
|
Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending
|
Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending
|
Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending
|
Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven
|
Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check
|
Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake 
|
Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake  
|
Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake
|
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
|
Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A
|
Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting    
|
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
|
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
|
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
|
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
|
Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs
|
Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs   
|
Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs   
|
Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs
|
Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs
|
Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
|
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts 
|
Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
|
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
|
Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs
|
Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement    
|
Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement 
|
Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs
|
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
|
Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test    
|
Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2  
|
Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
|
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
|
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
|
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
|
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
|
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
|
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
|
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
|
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
|
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 
|
Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand
|
Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint
|
Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1)    
|
Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  
|
Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3)  
|
Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4)  
|
Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5)
|
Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  
|
Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed 
|
Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) 
|
Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
|
Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
|
Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1)    
|
Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
|
Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
|
Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup  
|
Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment    
|
Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation    
|
Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation
|
Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep  
|
Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement
|
Mon Sep 26 14:27:49 2022, Koji, General, General, LLO OMC ICS work
|
Mon Nov 7 21:16:16 2022, Camille, Optics, Configuration, Setting up the fiber couplers  
|
Mon Nov 7 22:00:33 2022, Koji, Optics, Configuration, Setting up the fiber couplers
|
Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order
|
Mon Nov 14 08:34:45 2022, Camille, Optics, Characterization, transmission measurements through OMC #1 (before cleaning) 
|
Mon Nov 14 09:27:13 2022, Koji, Optics, Characterization, transmission measurements through OMC #1 (before cleaning)
|
Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning 
|
Thu Nov 17 19:50:00 2022, Koji, Optics, Characterization, Conclusion on the cleaning of OMC #001
|
Fri Nov 18 18:41:05 2022, Camille Makarem, General, General, 2nd deep cleaning of OMC #1
|
Mon Nov 21 19:13:35 2022, Koji, General, General, Transmission measurement (2nd deep cleaning of OMC #1) 
|
Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
|
Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
|
Fri Dec 2 11:42:03 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants   
|
Fri Dec 2 12:38:15 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants 
|
Fri Dec 2 23:58:33 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants 
|
Mon Dec 5 20:09:39 2022, Koji, Optics, General, (re)starting the OMC #4 build
|
Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission  
|
Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial    
|
Mon Dec 19 18:51:50 2022, Koji, Optics, Characterization, TMS measurement with the PZT voltages altered    
|
Wed Jan 25 23:51:04 2023, Koji, General, General, The items packed for Downs
|
Thu Jan 26 23:07:14 2023, Koji, Optics, General, OMC #4: Input beam dump bonding
|
Thu Jan 26 23:16:35 2023, Koji, Optics, Configuration, OMC #4: Top side bonding.    
|
Tue Nov 15 07:46:58 2022, Camille Makarem, Optics, General, cleaning OMC #1
|
Tue Nov 15 10:58:53 2022, Koji, Optics, General, OMC #1 damaged black glass removal   
|
Tue Nov 15 11:12:24 2022, Koji, Optics, General, OMC #1 fogging on the AR side of BS1 cleaned   
|
Thu Jan 26 23:46:13 2023, Koji, Optics, General, OMC #1 input beam dump bonding 
|
Sat Jan 28 00:38:56 2023, Koji, Mechanics, General, OMC #1 cable bracket replacement / OMC #1 repair completed    
|
Sat Jan 28 00:46:21 2023, Koji, Mechanics, General, OMC #4: Replaced the locks of the transport fixture
|
Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture 
|
Wed Feb 1 01:33:03 2023, Koji, Mechanics, General, 5th OMC Transport Fixture
|
Wed Feb 1 01:39:41 2023, Koji, Mechanics, General, DCPD housing / QPD housing 
|
Wed Feb 1 01:44:14 2023, Koji, General, General, OMC (004) plan
|
Thu Jan 19 23:45:44 2023, Koji, Optics, General, OMC #4: cavity mirror bonding
|
Mon Jan 23 19:51:20 2023, Koji, Optics, General, OMC #4: cavity mirror bonding   
|
Thu Jan 26 22:57:19 2023, Koji, Optics, General, OMC #4: One Invar block bonded with tilt 
|
Thu Feb 2 03:09:41 2023, Koji, Optics, General, OMC #4: One Invar block bonded with tilt 
|
Sat Feb 4 03:16:10 2023, Koji, Optics, General, OMC #4: One Invar block bonded with tilt
|
Sat Feb 4 03:22:46 2023, Koji, Facility, General, Ready for the HEPA enclosure expansion  
|
Sat Feb 4 03:33:22 2023, Koji, General, General, OMC Lab Inventory  
|
Wed Feb 8 16:10:52 2023, Stephen, Optics, Characterization, A+ OMC, Parallelism of HR Prisms 7x
|
Thu Feb 9 15:54:41 2023, Thejas , Optics, Characterization, A+ OMC, Parallelism of HR Prisms 19x
|
Tue Feb 14 10:45:00 2023, Thejas , Optics, Characterization, A+ OMC Prism perpendicularity 27x
|
Tue Feb 14 22:52:35 2023, Thejas , Optics, Characterization, A+ OMC Prism perpendicularity of HR Prisms and BS 18x
|
Sat Feb 4 03:30:02 2023, Koji, Electronics, General, OMC cables #4 arrived
|
Wed Feb 15 16:00:46 2023, Stephen, Electronics, General, OMC cables #4 inspected
|
Wed Feb 15 17:40:21 2023, Thejas , Optics, Characterization, A+ OMC perpendicularity of hole prisms 20x
|
Fri Feb 17 17:11:28 2023, Thejas , Optics, Characterization, A+ OMC beam-splitter prisms wedge angle measurement 11x
|
Fri Feb 17 17:25:39 2023, Thejas , Optics, Characterization, A+ OMC Breadboard measuerements  
|
Fri Feb 17 17:41:57 2023, Thejas , Electronics, Characterization, A+ OMC Piezos wedge angle
|
Mon Feb 27 17:40:27 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
|
Wed Mar 1 10:23:10 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
|
Mon Mar 6 12:25:08 2023, Koji, Facility, General, HEPA Enclosure improvement 
|
Mon Mar 6 16:02:56 2023, Thejas , Optics, General, OMC test setup locking
|
Tue Mar 7 10:20:55 2023, Thejas , Optics, Characterization, A+ OMC Curved mirror radius of curvature   
|
Tue Mar 7 23:00:16 2023, Thejas , Optics, Characterization, OMC Lab clean up 
|
Wed Mar 8 17:27:51 2023, Thejas , Optics, Characterization, A+ OMC Curvature minimum of curved optics
|
Fri Mar 10 10:23:08 2023, Thejas, Optics, Characterization, A+ OMC curved mirror radius of curvature   
|
Fri Mar 10 11:12:57 2023, Thejas , Optics, Characterization, A+ OMC Curvature minimum of curved optics
|
Tue Mar 14 10:41:06 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
|
Tue Mar 14 12:12:41 2023, Koji , Optics, Characterization, A+ OMC curved mirror characterization
|
Tue Mar 14 18:24:03 2023, Thejas , Optics, Characterization, A+ OMC Curved mirror radius of curvature  
|
Tue Mar 14 20:06:03 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Wed Mar 15 15:28:24 2023, Thejas , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Wed Mar 15 17:07:35 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Fri Mar 17 15:01:21 2023, Koji , Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Fri Mar 24 07:38:54 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors
|
Fri Mar 24 07:47:37 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors 
|
Tue Mar 28 11:21:27 2023, Camille Makarem, Optics, Characterization, Sagitta measurements of curved mirrors
|
Mon Apr 3 11:06:47 2023, Thejas , Optics, Characterization, Flat mirror flatness
|
Tue Apr 4 16:14:06 2023, Koji, Optics, Loan / Lending, C7 mirror to Downs
|
Wed Apr 5 22:09:30 2023, Koji, Facility, General, HEPA Enclosure extension  
|
Thu Apr 13 07:47:28 2023, Camille Makarem, Optics, Characterization, Zygo setup for curved mirror measurements
|
Fri Apr 14 15:52:53 2023, Camille Makarem, Optics, Characterization, Determining the curvature bottom of the curved mirrors
|
Fri Apr 14 16:36:29 2023, Thejas, Optics, Characterization, Determining the curvature bottom of the curved mirrors 21x
|
Mon Apr 17 17:56:25 2023, Thejas , Optics, Characterization, A+ OMC Piezos wedge angle 19x
|
Tue Apr 18 07:59:46 2023, Madeline Lesovsky, General, General, Test Cure Bake - Curved Mirror Subassembly Bonding 6x
|
Tue Apr 11 16:18:25 2023, Thejas, Optics, Characterization, A+ OMC Curved mirror radius of curvature  
|
Wed Apr 19 14:28:08 2023, Thejas, Optics, Characterization, A+ OMC Curved mirror radius of curvature
|
Mon Apr 24 15:29:48 2023, Camille Makarem, Optics, , summary of zygo setups 6x
|
Fri Apr 28 13:25:40 2023, Thejas , Optics, General, aLIGO OMC Unit-4 
|
Fri Apr 28 14:24:03 2023, Thejas , Optics, Characterization, A+ OMC Matching
|
Thu May 11 10:46:17 2023, Thejas , General, Characterization, aLIGO OMC
|
Wed Apr 26 14:43:44 2023, Stephen, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
|
Fri May 12 10:00:06 2023, Camille Makarem, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
|
Mon May 15 14:20:03 2023, Thejas , Optics, Characterization, A+ OMC ROC 21x
|
Mon May 15 14:24:41 2023, Thejas , Optics, Characterization, A+ OMC ROC
|
Thu May 4 15:12:14 2023, Koji, General, Characterization, OMC (004): Final Testing
|
Tue May 16 10:26:12 2023, Koji, General, Characterization, OMC (004): Final Testing
|
Wed Apr 26 13:23:00 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - QPD Calibration 
|
Mon May 1 13:30:40 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - PD Calibration 
|
Tue May 2 12:49:43 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
|
Thu May 4 11:39:19 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
|
Fri May 5 18:37:31 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt 
|
Tue May 16 13:07:11 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - DC Response Qualitative Results, Batch 1
|
Tue May 23 16:30:09 2023, Thejas , Electronics, Characterization, A+ OMC Piezos LA coupling
|
Fri Jun 2 13:28:09 2023, Camille Makarem, Electronics, , PZT op-lev measurements 
|
Fri May 19 16:09:31 2023, Stephen, General, General, A+ OMC Build Progress, Week of 2023.05.15
|
Fri Jun 2 17:15:44 2023, Stephen, General, General, A+ OMC Build Progress, Weeks of 2023.05.22 and 2023.05.29
|
|