Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
|
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)   
|
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
|
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard    
|
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
|
Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture 
|
Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy
|
Wed May 15 19:07:53 2019, Koji, Clean, General, What is this??? 
|
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
|
Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
|
Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH
|
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
|
Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding 
|
Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding
|
Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) 
|
Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding
|
Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!
|
Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)   
|
Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake 
|
Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 
|
Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019
|
Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
|
Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake 
|
Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake  
|
Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending
|
Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending
|
Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check
|
Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake
|
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
|
Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting    
|
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
|
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
|
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
|
Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture 
|
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
|
Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
|
Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs
|
Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement    
|
Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement 
|
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts 
|
Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
|
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
|
Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test    
|
Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
|
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
|
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
|
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
|
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
|
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
|
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
|
|