40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 9 of 9  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  10   Mon Jul 23 17:15:14 2012 KojiCleanGeneralTalking with MargotI consulted with Margot about the cleaning
of the optics

    Optics are considered
  
  9   Sun Jul 22 15:56:53 2012 ZachOpticsCharacterizationRoC measurement setupHere is a more detailed version of
the setup, so that we can gather the parts
we will need.
 detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip 
  8   Wed Jul 18 23:20:13 2012 KojiOpticsCharacterizationMode scan results of ELIGONic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found.
  
  7   Sat Jul 14 02:16:07 2012 KojiGeneralGeneralPlan Update: JulyFacility/Supplies

    Work in progress
 P7071878.jpg 
  6   Fri Jun 29 11:26:04 2012 ZachOpticsCharacterizationRoC measurement setupHere is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method".
 RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip 
  5   Thu Jun 21 03:07:27 2012 ZachOpticsConfigurationParameter selection / mode definitionEDIT 2 (ZK): As with the   geom_bowtie.pnggeom_non-bowtie.png 
  4   Wed Jun 20 20:37:45 2012 ZachOpticsConfigurationTopology / parameter selectionEDIT (ZK): All the plots here were generated  8x 
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  2   Sat Jun 16 08:53:09 2012 KojiGeneralGeneralTo Do ListFacility

    Work
    
  
  1   Fri Jun 15 15:45:49 2012 KojiGeneralGeneralOMC PlanLIGO Document G1200683-v1:

aLIGO OMC fabrication and testing
  
ELOG V3.1.3-