  443   Wed Aug 24 03:20:59 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (2)Bonding  11x 
  444   Wed Aug 24 03:26:43 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (3)Inspection

 
 8x 
  445   Wed Aug 24 11:29:47 2022 KojiGeneralGeneralOMC #002 ready for shipment[Stephen Koji]

The OMC #002 is ready for
shipment.
 IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg 
  446   Thu Aug 25 14:22:08 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationInspected the past LLO add-on mass configuration.

There are unknown masses at the
DCPD side. It looks like a small SS mass
 DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG 
  447   Thu Aug 25 20:05:00 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationHere is the balance mass info for the LLO
OMC#001 analyzed from the photographs


Added masses are: 50+10g,
 balance_mass_config_LLO.pdf 
  448   Fri Aug 26 22:29:02 2022 KojiGeneralGeneralTool Shipping PrepShipping preparation for the LLO
trip

Started
July 15, 2022 and finished Aug 30. So it
 PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg 
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  450   Mon Sep 26 14:27:49 2022 KojiGeneralGeneralLLO OMC ICS workOMC
#001


ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
  
  452   Mon Nov 7 22:00:33 2022 KojiOpticsConfigurationSetting up the fiber couplersFiber matching: 43.2/56.7 = 76%
S/P-pol ratio 0.7/43.2 = 1.6%

 
  
  453   Fri Nov 11 19:07:48 2022 KojiSupplyGeneralSupply OrderClean Supply Ordered


TexWipe TX8410 AlphaSat
Vectra Alpha 10 50 sheets x 12 pk  (VWR
  
  455   Mon Nov 14 09:27:13 2022 KojiOpticsCharacterizationtransmission measurements through OMC #1 (before cleaning)The measured total optical loss of the
OMC was

1st:   0.015 +/- 0.003
 OMC_Powerbudget.xlsx 
  457   Tue Nov 15 10:58:53 2022 KojiOpticsGeneralOMC #1 damaged black glass removal[Camille, Koji]

The damaged black glass was removed
from the OMC breadboard leaving the glass
 PXL_20221114_222641455.jpgPXL_20221114_222544330.jpgPXL_20221114_222555849.jpgPXL_20221114_233748631.jpg 
  458   Tue Nov 15 11:12:24 2022 KojiOpticsGeneralOMC #1 fogging on the AR side of BS1 cleaned[Camille, Koji]

Photo of the BS1 AR cleaning process

Attachment 1: Before cleaning.
 PXL_20221114_225338114.jpgPXL_20221114_232824245.jpgPXL_20221114_233714774.jpgPXL_20221114_233748631.jpg 
  459   Thu Nov 17 18:56:22 2022 KojiOpticsGeneral Transmission measurements of OMC #1 after deep cleaning[Camille, Koji]

- Removed the first contact we
left on Monday.
 PXL_20221117_232145418.jpgScreen_Shot_2022-11-17_at_19.02.31.png 
  460   Thu Nov 17 19:50:00 2022 KojiOpticsCharacterizationConclusion on the cleaning of OMC #001Conclusion on the cleaning of OMC
#001

- After a couple of first contact
 OMC_loss.pdf 
  462   Mon Nov 21 19:13:35 2022 KojiGeneralGeneralTransmission measurement (2nd deep cleaning of OMC #1)OMC Transmission measurement after
the 2nd deep cleaning

The 2nd deep cleaning didn't
 PXL_20221122_030736513.jpgOMC_loss.pdf 
  463   Tue Nov 29 15:54:47 2022 KojiGeneralConfigurationWindows laptop for WincamD Beam'R2 recoveryAaron took the set to Cryo lab

 
  
  464   Fri Dec 2 11:42:03 2022 KojiOpticsCharacterizationOMC #1 cleaning for water soluble contaminants[Camille, Koji] Log of the work
on Nov 30, 2022

 


The
following is the notes from GariLynn




 PXL_20221130_234101575.jpgPXL_20221130_234013958.jpgPXL_20221201_021727724.jpgScreen_Shot_2022-12-02_at_12.43.02.png 
  465   Fri Dec 2 12:38:15 2022 KojiOpticsCharacterizationOMC #1 cleaning for water soluble contaminantsAnother set of FC cleaning was applied
to FM1/FM2/CM1/CM2 and SM2. Some FC strings
are visible on SM2. So I decided to clean
 PXL_20221202_034932211.jpgOMC_loss.pdf 
  466   Fri Dec 2 23:58:33 2022 KojiOpticsCharacterizationOMC #1 cleaning for water soluble contaminantsThe second trial of the water scrub

A bright scatter is visible on
FM1, so I tried water scrub on FM1. This
 PXL_20221203_063327268.jpgOMC_loss.pdf 
  467   Mon Dec 5 20:09:39 2022 KojiOpticsGeneral(re)starting the OMC #4 build[Camille Koji]

We started buikding the
OMC #4. 
 PXL_20221205_233712211.jpg 
  468   Fri Dec 9 13:13:13 2022 KojiOpticsCharacterizationFSR/TMS/Spot Positions/Transmission[Camille Koji]

We quickly measured the basic parameters
of the OMC as is.
 HOM_plot_PZT.pdfOMC4_spot.pngPXL_20221208_233706115.jpg 
  469   Mon Dec 12 19:04:40 2022 KojiOpticsCharacterizationFSR/TMS/Spot Positions/Transmission 2nd trial[Camille Koji]

We replaced CM2 with a PZT mirror
subassembly serialized by PZT "13"
 PXL_20221212_235351320.jpgOMC4_spot.pngHOM_plot_PZT.pdfPXL_20221213_000406843.jpgScreen_Shot_2022-12-12_at_19.36.10.png 
  470   Mon Dec 19 18:51:50 2022 KojiOpticsCharacterizationTMS measurement with the PZT voltages altered[Camille, Koji] Log of
the work on Dec 15, 2023

The vertical and horizontal
 Cav_scan_response_PZT1_0_Pitch.pdfCav_scan_response_PZT1_0_Yaw.pdfOMC_20221215.pdfHOM_plot_PZT0_0.pdfHOM_PZTV_PZT1_0V.pdf 
  471   Thu Jan 19 23:45:44 2023 KojiOpticsGeneralOMC #4: cavity mirror bonding[Koji, Camille]

We worked on the bonding of the
flat mirrors for the OMC cavity with UV epoxy.
  
  472   Mon Jan 23 19:51:20 2023 KojiOpticsGeneralOMC #4: cavity mirror bonding[Camille, Koji]

We continued to bond two CM mirrors
and the other two steering mirrors for QPD2.
 HOM_plot_PZT0_0.pdfPXL_20230124_032358482.MP.jpgPXL_20230124_032452805.MP.jpgPXL_20230124_032425638.jpg 
  473   Wed Jan 25 23:51:04 2023 KojiGeneralGeneralThe items packed for DownsQty1 1/2 mounts
Qty2 prism mounts
Qty6 gluing fixures
 PXL_20230127_055920944.jpg 
  474   Thu Jan 26 22:57:19 2023 KojiOpticsGeneralOMC #4: One Invar block bonded with tilt[Camille, Koji]

The bottom side template was separated
into two pieces and successfully removed
 PXL_20230126_221425695.jpgPXL_20230126_221522416.jpg 
  475   Thu Jan 26 23:07:14 2023 KojiOpticsGeneralOMC #4: Input beam dump bonding[Camille, Koji]

During the second UV epoxy session,
we did not bond the input beam dump. This
 PXL_20230126_221556977.jpg 
  476   Thu Jan 26 23:16:35 2023 KojiOpticsConfigurationOMC #4: Top side bonding.[Camille, Koji]
 PXL_20230126_235309334.jpgPXL_20230127_053008237.jpgPXL_20230127_053020709_2.jpgPXL_20230127_053042809.MP_2.jpgPXL_20230127_053058275_2.jpg 
  477   Thu Jan 26 23:46:13 2023 KojiOpticsGeneralOMC #1 input beam dump bondingA beam dump was stacked on the base of
the previous beam dump. The angle was determined
so that the main transmission goes through
 PXL_20230127_052955482.jpgPXL_20230127_052949869.jpg 
  478   Sat Jan 28 00:38:56 2023 KojiMechanicsGeneralOMC #1 cable bracket replacement / OMC #1 repair completedThe AL metal bracket was replaced with
a PEEK version.

Attachments 1/2: Before the replacement.
 PXL_20230128_011405446.jpgPXL_20230128_011401778.jpgPXL_20230128_013509885.jpgPXL_20230128_014001006.jpgPXL_20230128_014035044.jpg 
  479   Sat Jan 28 00:46:21 2023 KojiMechanicsGeneralOMC #4: Replaced the locks of the transport fixture Yesterday, we noticed that we could not
close the transport fixture for OMC #4. We
could not fully rotate the knobs of the locks.
 PXL_20230128_022952669.jpg 
  480   Wed Feb 1 01:33:03 2023 KojiMechanicsGeneral5th OMC Transport FixtureThe transport fixture was brought to the
40m clean room to use as an assembly reference.
 PXL_20230201_005912224.jpg 
  481   Wed Feb 1 01:39:41 2023 KojiMechanicsGeneralDCPD housing / QPD housingInserted 4-40 and 2-56 helicoils into the
DCPD/QPD housings for the 4th OMC. The retainer
caps were also fastened to the housings.
 PXL_20230201_021505299.jpgPXL_20230201_021455728.jpg 
  482   Wed Feb 1 01:44:14 2023 KojiGeneralGeneralOMC (004) plan2/1 2:30PM~ Bonding reinforcement (Last
EP30-2 gluing)

2/2 1:00PM~ Peripheral attachment
  
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  300   Mon Jul 2 15:27:31 2018 Rich AbbottElectronicsGeneralWork on EOM (3rd IFO unit)Koji, Rich

We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO
 EOM3_aLIGO_3rdIfo.JPG 
  301   Tue Jul 3 12:07:47 2018 Rich AbbottElectronicsCharacterizationNotes on 3rd IFO EOMAttached please see my notes summarizing
the models for the electrodes and inductors
within the 3rd IFO EOM
 EOM_Analysis2.pdf 
  305   Wed Aug 8 17:32:56 2018 Rich AbbottGeneralCharacterizationModulation Index Test Setup at 40m LabAttached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator
 40mLabModIndexSetup.pdf 
  290   Thu Nov 30 12:18:41 2017 StephenGeneralGeneralPreparation for Modal Testing on 4 DecemberNorna Robertson, Stephen Appert || 
29 Nov 2017, 2 pm to 4 pm  || 
227 Downs, CIT
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  358   Thu May 9 16:07:18 2019 StephenMechanicsGeneralImprovements to OMC Bonding Fixture[Stephen, Koji]

As mentioned in eLOG
331, either increased thermal cycling
 image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG 
  367   Tue May 28 12:14:20 2019 StephenOpticsGeneralCM PZT Assembly Debonding of EP30-2 in Acetone[LiyuanZ, StephenA]

Downs B119

Summary:
 8x 
  371   Thu Aug 22 12:35:53 2019 StephenOpticsCharacterizationWedging of the debonded PZTs 2019 AugustWedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first
 IMG_4775.JPGIMG_4770.JPG 
  375   Wed Sep 18 22:30:11 2019 StephenSupplyGeneralEP30-2 Location and StatusHere is a summary of the events of the
last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that
 IMG_5217.JPG 
  376   Wed Sep 18 23:16:06 2019 StephenSupplyGeneralItems staged at 40m Bake Lab for PZT Subassembly BondingThe following items are presently staged
at the 40m Bake Lab (see photo indicating
current location) (noting items broght by
 IMG_5216.JPGIMG_5215.JPG 