+
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
|
Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 
|
Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions 
| +
Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
| +
Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
| +
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
|
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard    
| +
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping
| +
Sun Jun 25 21:04:35 2023, Koji, General, Characterization, Optical assembly/testing of OMC (004) completed   
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
| +
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
| +
Tue Sep 8 11:18:10 2015, Koji, Optics, Characterization, PBS Transmission measurement  
| +
Wed Sep 9 01:58:34 2015, Koji, Optics, Characterization, PBS Transmission measurement
| +
Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment
|
Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement
|
Sun Mar 6 02:13:28 2016, Koji, Optics, Characterization, PD glass reflections 
|
Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment
|
Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation
| +
Tue Mar 28 21:04:27 2017, Koji, Electronics, Characterization, PDH amp 6x
| +
Sat Jul 29 18:44:38 2017, rana, Electronics, Characterization, PDH amp
| +
Sat Jul 29 21:42:51 2017, Koji, Electronics, Characterization, PDH amp
|
Sat Jan 12 22:49:11 2019, Koji, Optics, Characterization, PM-SM patch cable mode cleaning effect
|
Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement
| +
Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4
| +
Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6
| +
Tue May 16 13:07:11 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - DC Response Qualitative Results, Batch 1
| +
Tue May 2 12:49:43 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
| +
Thu May 4 11:39:19 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt
| +
Fri May 5 18:37:31 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - First measurement attempt 
| +
Mon May 1 13:30:40 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - PD Calibration 
| +
Wed Apr 26 13:23:00 2023, Stephen, Optics, Characterization, PZT DC Response with Shadow Sensor - QPD Calibration 
|
Mon Jul 17 10:15:56 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 1 of 2) 10x
|
Wed Jul 19 08:38:07 2023, Camille Makarem, Electronics, Characterization, PZT Reliability Test Results (part 2 of 2)    
|
Sat Jul 6 17:10:07 2013, Koji, Mechanics, Characterization, PZT Response analysis 
|
Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly  
|
Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO
| +
Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing
| +
Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures
|
Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued   
|
Tue Jul 8 18:54:54 2014, Koji, Mechanics, Characterization, PZT characterization 
|
Fri Feb 1 12:52:12 2019, Koji, Mechanics, General, PZT deformation simulation
| +
Thu Aug 22 15:40:15 2013, Koji, Electronics, Configuration, PZT endurance test   
| +
Fri Aug 23 19:24:32 2013, Koji, Electronics, Configuration, PZT endurance test (II)
|
Thu Aug 24 16:09:46 2023, Camille Makarem, Optics, General, PZT length-to-angle coupling 
|
Fri Jun 2 13:28:09 2023, Camille Makarem, Electronics, , PZT op-lev measurements 
|
Thu Apr 11 12:15:31 2019, Koji, Mechanics, Configuration, PZT sub assy mirror orientations 
|
Thu Jan 10 20:45:00 2019, Koji, Optics, Characterization, PZT test cable
|
Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire
|
|