  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lendingGabriele:

PZT HV Amp

Evan:
  
  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending- The laser was removed and shipped to
LHO today.

- UV illuminator / fused silica
  
  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lendingShipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super
Spot MK III)
 C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG 
  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lendingKate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
  
  268   Fri Sep 9 14:34:31 2016 KojiGeneralGeneralItem lendingTo 40m

First Contact Kit by Calum

Class A Kapton sheets
  
  389   Thu Feb 27 14:31:13 2020 KojiGeneralGeneralItem lendingItem lending as per Ian's request:
Particle Counter from OMC Lab to QIL

 
 P_20200227_134755_vHDR_On.jpg 
  390   Mon Aug 10 15:29:54 2020 KojiGeneralGeneralItem lendingThe particle counter came back to the OMC
lab on Aug 10, 2020

 
  
  615   Tue Aug 22 15:51:15 2023 KojiGeneralGeneralInventory: C30655 PDsDuring the OMC(004) assembly, the stock
situation for Excelitas C30655 PDs was checked.

PD Cage H
  
  125   Mon May 13 14:59:16 2013 KojiMechanicsGeneralInvar shim gluingThe invar reinforcement shims were glued
on the glass brackets on the breadboard.
  
  401   Fri Nov 20 18:51:23 2020 KojiGeneralGeneralInstrument loanFEMTO DLPCA200 low noise preamp (brand
new)

Keithley Source Meter 2450 (brand
  
  266   Tue Aug 23 23:36:54 2016 KojiOpticsCharacterizationInspection of the damaged CM1 (prev H1OMC)1. Calum and GariLynn checking the CM1
defect from the front side.
2. Same as above
 7x 
  267   Thu Aug 25 02:17:09 2016 KojiOpticsCharacterizationInspection of the damaged CM1 (prev H1OMC)Initial inspection results by Calum, et
al.
https://dcc.ligo.org/LIGO-E1600268
  
  358   Thu May 9 16:07:18 2019 StephenMechanicsGeneralImprovements to OMC Bonding Fixture[Stephen, Koji]

As mentioned in eLOG
331, either increased thermal cycling
 image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG 
  31   Thu Oct 18 20:23:33 2012 KojiOpticsCharacterizationImproved measurementSignificant
improvement has been achieved in the RoC
 Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf 
  299   Mon Jul 2 12:29:01 2018 KojiElectronicsCharacterizationImpedances of individual components (3IFO EOM)[Rich Koji]

The impedances of the individual
components from the 3IFO EOM (before modification)
 impedance_coils.pdfimpedance_xtals.pdfq_coils.pdfcomponent_models.pdfliso_models.zip 
  403   Sun Nov 22 13:49:12 2020 KojiElectronicsCharacterizationImpedance Measurement for InGaAs QPDsTo know any anomaly to the junction
capacitance of the QPD segments, the RF impedances
were tested with a hand-made impedance measurement.
 impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf 
  366   Thu May 23 23:27:38 2019 KojiOpticsCharacterizationIGHQEX3000 high power testLaserComponents IGHQEX3000 (Cage
B2: Serial# B1-23) was exposed to the beam
with the optical power from 1.6mW to 332mW.
 HQEPD_high_power_test.pdfpd_images.png 
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  211   Sun Jul 20 17:19:50 2014 KojiMechanicsCharacterizationI1OMC vibration test ~ 2nd roundImproved
vibration measurement of the OMC
Improvement
 9x 
  210   Thu Jul 17 02:19:20 2014 KojiMechanicsCharacterizationI1OMC vibration testSummary
- The breadboard has a resonance
at 1.2kHz. The resonant freq may be chagned
 6x 
  186   Sat May 17 07:40:14 2014 KojiOpticsCharacterizationI1OMC cavity mirrors gluedI1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m
(nominal 1.132m)
 Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf 
  205   Thu Jul 10 23:22:28 2014 KojiOpticsCharacterizationI1OMC QPDQPD#             
QPD1      
QPD2
  
  206   Fri Jul 11 00:06:33 2014 KojiOpticsCharacterizationI1OMC PDDCPD#            
DCPD1      DCPD2
Housing#         
  
  160   Thu Aug 29 18:55:36 2013 KojiMechanicsGeneralI1 OMC top side gluing (UV)The glass components for the I1 OMC top
side were glued by the UV glue.
Breadboard SN#4
  
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  38   Thu Nov 8 20:12:10 2012 KojiOpticsConfigurationHow many glass components we need for a plateOptical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
  
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  429   Wed Jul 27 10:34:09 2022 KojiGeneralGeneralHigh QE PD: QE measurements 2- DLPCA-200 trans-impedance amplifier was
calibrated.
  Keithley source meter 2450
 IMG_1119.JPGIMG_1120.JPG 
  427   Tue Jul 26 00:12:58 2022 KojiGeneralGeneralHigh QE PD: QE measurements- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage
 IMG_1118.JPG 
  262   Fri Jul 22 22:24:05 2016 KojiGeneralGeneralHQEPD inventoryAs of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
  
  256   Sat Mar 26 17:39:50 2016 KojiElectronicsCharacterizationHQEPD dark noiseDark noise measurement for 6 HQEPDs and
1 C30665. All of these showed sufficiently
low dark current noise levels compared with
 PD_dark_current.pdf 
  254   Sun Mar 13 22:02:09 2016 KojiOpticsCharacterizationHQEPD QE measurement (direct comaprison)Direct comparison of the PD responsibities

We
can expect 5% increase of the QE with the
  
  255   Sat Mar 26 01:49:48 2016 KojiOpticsCharacterizationHQEPD QECalibration
of the transimpedance

Use KEITHLEY 2450 as a calibrated
 QE1.pngQE2.png 
  198   Sun Jul 6 03:56:40 2014 KojiOpticsCharacterizationHOM measurement with PZT vol sweptCavity FSR/TMS measurement (2014/7/5) with
PZT voltages swept from 0V to 200V (50V step)
 Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf 
  199   Sun Jul 6 08:31:14 2014 KojiOpticsCharacterizationHOM measurement with PZT vol swept3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier
is the 32nd-order carrier mode. Very good.
 HOM_plot.pdf 
  500   Mon Mar 6 12:25:08 2023 KojiFacilityGeneralHEPA Enclosure improvementChub, JC, and co worked on the HEPA enclosure
improvement.
 20230306_081449.jpg20230306_081518.jpg 
  519   Wed Apr 5 22:09:30 2023 KojiFacilityGeneralHEPA Enclosure extensionChub finished the HEPA enclosure extension
project.
 20230405_120322.jpg20230405_120308.jpg20230405_120033.jpg 
  368   Mon Jun 24 12:54:58 2019 KojiCleanGeneralHEPA BOOTHhttps://www.airscience.com/purair-flow-laminar-flow-cabinets   
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  163   Fri Aug 30 12:24:28 2013 KojiOpticsCharacterizationH1OMC Spot positionsBeam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm
 DCPD1.pngDCPD2.pngQPD1.pngQPD2.png 
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  159   Thu Aug 29 02:52:50 2013 KojiOpticsCharacterizationH1OMC Curved Mirror AlignmentCavity
parameter was measured with 50V bias on PZT1
(CM1)
 Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf 
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  154   Wed Aug 21 08:31:21 2013 KojiOpticsCharacterizationH1 OMC cavity alignmentAlignment of the H1 OMC cavity mirrors
- The cavity mirrors as well as the
first steering mirror were aligned on the
  
  170   Mon Oct 14 15:50:55 2013 KojiOpticsCharacterizationH1 OMC Power budgetLHO OMC power budget

    
 OMC_power_budget.pdf 
  169   Mon Oct 14 13:40:16 2013 KojiOpticsCharacterizationH1 OMC Optical testingSince the middle of September, the optical
tests of H1 OMC were took place.
Here is summary of the progress.
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  263   Fri Aug 12 14:58:17 2016 KojiGeneralConfigurationH1 OMC DCPD replacement Preparation of 3rd OMC for the
use in H1

New DCPD(T) = B1-01
  