OMC elog, Page 9 of 9
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
432 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
ID
Date
Author
Type
Category
Subject
Text
32
Wed Nov 7 01:28:20 2012
Koji
Optics
Characterization
Wedge angle test (A1)
Wedge
angle test
Result: Wedge angle of Prism A1:
31
Thu Oct 18 20:23:33 2012
Koji
Optics
Characterization
Improved measurement
Significant
improvement has been achieved in the RoC
30
Wed Oct 17 20:36:04 2012
Koji
Optics
General
RoC test cavity locked
The RoC test setup has been built on
the optical table at ATF.
29
Tue Oct 16 15:51:01 2012
Koji
General
General
Plan Update: October [!]
Completed work of the previous months:
[Jul]
[Aug]
28
Tue Oct 16 15:50:09 2012
Koji
General
General
Work completed in August/September [!]
Work done
27
Tue Oct 16 14:50:54 2012
jamie, jeff
General
General
OMC breadboard/plate measurement dimensions
We have measured the dimensions and mass
of the OMC glass plates/breadboards:
26
Fri Oct 12 17:15:19 2012
Koji
Optics
General
Loan from the 40m / ATF
HWP set
25
Tue Oct 9 05:03:15 2012
Koji
Electronics
General
OMC Test Electronics Setup
24
Tue Oct 9 04:59:24 2012
Koji
Optics
General
OMC Test Optical Setup
23
Mon Oct 8 11:30:47 2012
Koji
Optics
General
EG&G 2mm photodiode angle response
EGE&G 2mm photodiode angle response
measured by Sam T1100564-v1
22
Fri Oct 5 03:39:58 2012
Koji
Optics
General
RoC Test setup
Based on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test.
21
Mon Oct 1 16:06:55 2012
Koji
Clean
General
Particle Counts
1. It turned out that the particle
counter MET ONE 227A at ATF shows
(particle count)/(0.1 ft^3)
20
Tue Sep 25 14:18:14 2012
Koji
Clean
General
Particle Counts
Particle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts
19
Wed Aug 22 20:16:43 2012
Koji
Facility
General
Workbenches have been installed / Clean room stools
Last Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool.
18
Tue Aug 14 03:29:06 2012
Koji
Supply
General
Clean supply rack
Clean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to
17
Mon Aug 13 17:01:35 2012
Koji
Clean
General
Particle Counts
Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um 400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A)
16
Mon Aug 13 16:59:11 2012
Koji
Clean
General
Room Cleaning Log
Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012)
15
Sat Aug 11 00:59:14 2012
Koji
Facility
General
Laser Safety Barrier
It seemed that a laser safety barrier was
installed today!?
14
Wed Aug 1 19:35:00 2012
Koji
Facility
General
Floor cleaned / Workbench being built / Table top defect
-
The floor of the room was cleaned and waxed!
-
13
Tue Jul 31 21:33:17 2012
Koji
General
General
Plan Update: August [!]
Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec]
12
Tue Jul 31 21:29:43 2012
Koji
General
General
Work completed in July [!]
Completed Work: Facility/Supplies
11
Tue Jul 24 11:41:29 2012
Koji
General
General
Useful references
Nicolas Smith,
LIGO Document T0900383-v1
10
Mon Jul 23 17:15:14 2012
Koji
Clean
General
Talking with Margot
I consulted with Margot about the cleaning
of the optics
Optics are considered
9
Sun Jul 22 15:56:53 2012
Zach
Optics
Characterization
RoC measurement setup
Here is a more detailed version of
the setup, so that we can gather the parts
we will need.
8
Wed Jul 18 23:20:13 2012
Koji
Optics
Characterization
Mode scan results of ELIGO
Nic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found.
7
Sat Jul 14 02:16:07 2012
Koji
General
General
Plan Update: July
Facility/Supplies
Work in progress
6
Fri Jun 29 11:26:04 2012
Zach
Optics
Characterization
RoC measurement setup
Here is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method".
5
Thu Jun 21 03:07:27 2012
Zach
Optics
Configuration
Parameter selection / mode definition
EDIT 2 (ZK): As with the
4
Wed Jun 20 20:37:45 2012
Zach
Optics
Configuration
Topology / parameter selection
EDIT (ZK): All the plots here were generated
8x
3
Wed Jun 20 00:10:53 2012
Koji
Facility
General
Hole on the wall was patched
2
Sat Jun 16 08:53:09 2012
Koji
General
General
To Do List
Facility
Work
1
Fri Jun 15 15:45:49 2012
Koji
General
General
OMC Plan
LIGO Document G1200683-v1:
aLIGO OMC fabrication and testing
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
ELOG V3.1.3-