40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 9 of 10  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  23   Mon Oct 8 11:30:47 2012 KojiOpticsGeneralEG&G 2mm photodiode angle responseEGE&G 2mm photodiode angle response
measured by Sam T1100564-v1
  
  224   Wed Jul 15 22:23:17 2015 KojiElectronicsAM Stabilized EOM DriverE1400445 first lookThis is not an OMC related and even not
happening in the OMC lab (happening at the
40m), but I needed somewhere to elog...
 IMG_20150714_195534852.jpgIMG_20150714_195227746_HDR.jpg 
  282   Fri Jun 23 10:55:07 2017 KojiOpticsGeneralDust layer on black glass beam dumps?I wondered why the black glass beam dumps
looked not as shiny as before. It was in
fact a layer of dusts (or contaminants) accumulated
 black_glass_dust.JPG 
  147   Fri Jun 28 12:20:49 2013 KojiGeneralGeneralDmass's loan of Thorlabs HV amphttp://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
  
  61   Thu Feb 7 21:35:46 2013 KojiGeneralGeneralDmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40mDmass
borrowed the LB1005 servo amp from the OMC
lab.
 P2053119.jpgP2053120.JPG 
  380   Thu Sep 26 17:33:52 2019 StephenGeneralGeneralDirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!Follow up on OMC
elog 379

I was able to obtain the following
 image_showing_20190924_abo_qualifying_bake.png 
  377   Wed Sep 18 23:38:52 2019 StephenGeneralGeneralDirty ABO ready for PZT Subassembly BondingThe 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab,
 index.png 
  73   Sun Mar 17 21:59:47 2013 KojiElectronicsCharacterizationDiode testing ~ DCPD- For the dark noise measurement, the lid
of the die-cast case should also contact
to the box for better shielding. This made
 OMCPD_TEST_130317.pdf 
  72   Fri Mar 15 02:15:45 2013 KojiElectronicsCharacterizationDiode testingDiode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC
 QPD_GR_TEST_130316.pdf 
  78   Sat Mar 23 16:36:15 2013 KojiElectronicsCharacterizationDiode QE measurementQuantum efficiencies of the C30665GH
diodes were measured. 
- The diode was biased by the FEMTO
 P3213308.JPGP3213310.JPG 
  247   Tue Dec 15 13:42:37 2015 KojiOpticsCharacterizationDimensions / packaging of HQE PDsThe dimensions of a high QE PDs was measured
as well as the ones for C30665. (Attachment
4, Unit in mm)
 PC147842.jpgPC147846.jpgPC147848.jpgHQEPD_dimension.pdf 
  251   Sat Feb 20 19:11:22 2016 KojiElectronicsCharacterizationDark current measurement of the HQE PD and other PDsDark current of the HQE PD and
other PDs were measured.

- The HQE PDs were loaded on the
 P2197992.jpgPD_dark_current.pdfPD_dark_current_others.pdf 
  253   Sun Mar 13 21:22:27 2016 KojiElectronicsCharacterizationDark current measurement of the HQE PD and other PDsTransfered for RGA scan

B4 (C1-05) -> F1
C1 (C1-07) -> F2
  
  402   Sat Nov 21 13:58:30 2020 KojiElectronicsCharacterizationDark Current Measurement for InGaAs QPDsDark current measurement for InGaAs QPDs
(OSI FCI-InGaAs-Q3000) has been done using
Keithley 2450 and Frank's diode test
 Q3000_dark_current.pdf 
  130   Thu May 23 23:41:48 2013 KojiMechanicsGeneralDCPD/QPD MountDCPD mounts and QPD mounts were attached
on the breadboard. They are not aligned yet
and loosely fastened.
  
  118   Thu Apr 18 11:59:02 2013 KojiGeneralGeneralDCPD path gluing[Jeff, Koji]
DCPD path gluing
  
  481   Wed Feb 1 01:39:41 2023 KojiMechanicsGeneralDCPD housing / QPD housingInserted 4-40 and 2-56 helicoils into the
DCPD/QPD housings for the 4th OMC. The retainer
caps were also fastened to the housings.
 PXL_20230201_021505299.jpgPXL_20230201_021455728.jpg 
  363   Mon May 20 19:53:17 2019 KojiOpticsConfigurationDCPD high power testWe want to perform a damage test of OMC
DCPDs with high power beam. The OMC DCPD
is the 3mm InGaAs photodiodes with high quantum
 BIAS.pdfP_20190520_204822.jpg 
  409   Sun May 30 15:17:16 2021 KojiGeneralGeneralDCPD AF capacitance measirementAttachment 1: System diagram.
The reverse bias voltage is controlled by
DS335. This can produce a voltage offset
 PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg 
  410   Sun May 30 15:32:56 2021 KojiGeneralGeneralDCPD AF capacitance measirementMeasurement result:

The capacitance at no bias was
460~500pF. This goes down to below 300pF
 highQEPD_capacitance.pdfC30665_capacitance.pdf 
  269   Fri Sep 9 19:43:32 2016 KojiOpticsGeneralD1102211 OMC Diode Mount Glass Block went to DownsD1102211 OMC Diode Mount Glass Block (11pcs)
have been given to Calum@Downs
  
  225   Sat Jul 18 11:37:21 2015 KojiElectronicsAM Stabilized EOM DriverD0900848 power board ~ oscillation issue solvedPower Supply Board D0900848 was
oscillating. Here is the procedure how the
issue was fixed.
 6x 
  126   Mon May 13 15:00:23 2013 KojiGeneralGeneralCurrent most reliable OMC scheduleMay
Tue 14th The OMC
given to Bob (Air bake & Vac bake)

Mon
20th The OMC received from Bob
        
  
  129   Tue May 21 18:28:08 2013 KojiGeneralGeneralCurrent most reliable OMC schedule- The wrong Mighty Mouse connectors for
the PZT wires were prepared. The correct
ones are in the vacuum oven till Tuesday
  
  460   Thu Nov 17 19:50:00 2022 KojiOpticsCharacterizationConclusion on the cleaning of OMC #001Conclusion on the cleaning of OMC
#001

- After a couple of first contact
 OMC_loss.pdf 
  217   Wed Aug 27 23:13:13 2014 KojiOpticsCharacterizationCollection of the power budgetting infoL1
OMC Cavity power budget
H1
  
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  18   Tue Aug 14 03:29:06 2012 KojiSupplyGeneralClean supply rackClean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to
 P8131959.JPGP8131961.JPG 
  185   Fri May 16 00:13:36 2014 KojiOpticsCharacterizationCavity mirror gluing part 1BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted
  
  145   Tue Jun 18 10:01:11 2013 KojiOpticsCharacterizationCavity Finesse analysisThis is the analysis of the cavity finesse
data taken on  Apr/13/2013 (before baking),
May/30/2013 (after baking), and Jun/02/2013
 finesse_measurements.pdf 
  364   Wed May 22 07:31:37 2019 KojiOpticsConfigurationCamera test (DCPD high power test)C30665 (3mm) camera test. The camera was
Canon PowerShot G7X MkII. Exposure 1/15s,
F 5.6, ISO 125, MF (~the closest), no zoom.
 20190521201838_IMG_7939_2.jpg 
  92   Wed Apr 3 17:39:38 2013 KojiMechanicsCharacterizationCalibration of the test PZTs before the glue testWe want to make sure the responses of the
PZT actuator does not change after the EP30-2
gluing.
 P4033491.JPGshadow_sensor_calib.pdf 
  98   Fri Apr 5 14:39:26 2013 KojiMechanicsCharacterizationCalibration of the test PZTs after the heat cureWe attached fused silica windows on the
test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought
 shadow_sensor_calib_after_bake.pdfPZTresponse.pdf 
  131   Thu May 30 14:38:42 2013 KojiElectronicsGeneralCable fitting Yesterday Jeff and Chub worked on the cabling
of the OMC. It turned out that the gender
of the cable connectors 
  
  123   Fri May 10 09:33:22 2013 KojiSupplyGeneralCOMSOL simulation on the glass bracket stress   COMSOL1.png 
  367   Tue May 28 12:14:20 2019 StephenOpticsGeneralCM PZT Assembly Debonding of EP30-2 in Acetone[LiyuanZ, StephenA]

Downs B119

Summary:
 8x 
  365   Thu May 23 01:42:46 2019 KojiOpticsCharacterizationC30665 high power testAn Excelitas C30665 PD with the
cap removed (SN07 in Case H slot #2) was
exposed to the beam with the optical power
 C30665_high_power_test.pdfpd_surface.jpg 
  424   Fri Jul 22 17:47:38 2022 KojiGeneralGeneralC&B request for the reinforcement blocksOMC Reinforcement blocks

1. P/N D1600316; Version v4; Type
01; Qty 30; Source Chemistry Machine Shop
 PXL_20220722_222013127.jpg 
  293   Thu May 3 21:45:58 2018 awadeGeneralLoan / LendingBorrowed toaster ovenI’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. 
 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg 
  343   Tue Apr 16 23:11:43 2019 KojiGeneralGeneralBorrowed items from the other labsApr 16, 2019
Borrowed
two laser goggles from the 40m. (Returned
  
  385   Tue Oct 22 15:54:59 2019 KojiElectronicsLoan / LendingBorrowed LB1005 from Cryo CavFrom Cryo Cav setup

Borrowed LB1005 Servo box ->
OMC
  
  419   Thu Jul 21 14:35:35 2022 KojiGeneralGeneralBond reinforcement blocks for the invar bracketsBond reinforcement blocks for the
invar brackets:


Attachment 1:
 IMG_1095.JPGIMG_1091.JPG 
  283   Sat Jul 1 15:29:57 2017 KojiOpticsGeneralBlack glass cleaning / Final bonding for the emergency repair for OMC #002[Alena, Koji] 

Report of the work on June
30.
 DSC_0347.jpgDSC_0348.jpgDSC_0350.jpgDSC_0352.jpgDSC_0354.jpg 
  76   Sat Mar 23 02:41:00 2013 KojiOpticsGeneralBlack glass beam dumps for the first OMCReceived black glass beam dumps from
MIT
- gluing by EP30-2 looks pretty fine.
 P3223314.JPGP3223319.jpgP3223320.jpg 
  386   Fri Dec 6 00:55:25 2019 KojiOpticsGeneralBeamdump gluing[Stephen, Koji]

20 glass beamdumps were
bonded at the 40m cleanroom.
 6x 
  87   Fri Mar 29 08:55:00 2013 ZachOpticsConfigurationBeam launched into fiber

    

       
            
  
  97   Thu Apr 4 23:44:52 2013 KojiOpticsConfigurationBeam launched into fiberWe had to move our flipper mirror to share
the beam between Peter's setup and ours as
our flipper is at the place where the ISS
  
  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delaminationWhile the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination.
 beamdump_delamination.png 
  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delaminationHere is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure).
 beamdump_delamination_solution.png 
  257   Sat Mar 26 18:22:24 2016 KojiElectronicsCharacterizationBaking / Contamination tests of the PDsFor the production of the aLIGO PDs, the
following transfer of the PDs were carried
out
  
ELOG V3.1.3-