40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 9 of 9
Not logged in
List
|
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
410 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
ID
Date
Author
Type
Category
Subject
Text
10
Mon Jul 23 17:15:14 2012
Koji
Clean
General
Talking with Margot
I consulted with Margot about the cleaning
of the optics
Optics are considered
9
Sun Jul 22 15:56:53 2012
Zach
Optics
Characterization
RoC measurement setup
Here is a more detailed version of
the setup, so that we can gather the parts
we will need.
8
Wed Jul 18 23:20:13 2012
Koji
Optics
Characterization
Mode scan results of ELIGO
Nic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found.
7
Sat Jul 14 02:16:07 2012
Koji
General
General
Plan Update: July
Facility/Supplies
Work in progress
6
Fri Jun 29 11:26:04 2012
Zach
Optics
Characterization
RoC measurement setup
Here is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method".
5
Thu Jun 21 03:07:27 2012
Zach
Optics
Configuration
Parameter selection / mode definition
EDIT 2 (ZK): As with the
4
Wed Jun 20 20:37:45 2012
Zach
Optics
Configuration
Topology / parameter selection
EDIT (ZK): All the plots here were generated
8x
3
Wed Jun 20 00:10:53 2012
Koji
Facility
General
Hole on the wall was patched
2
Sat Jun 16 08:53:09 2012
Koji
General
General
To Do List
Facility
Work
1
Fri Jun 15 15:45:49 2012
Koji
General
General
OMC Plan
LIGO Document G1200683-v1:
aLIGO OMC fabrication and testing
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
ELOG V3.1.3-