ID Date Authorup Type Category Subject Text Attachments
  443   Wed Aug 24 03:20:59 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (2)Bonding  11x 
  444   Wed Aug 24 03:26:43 2022 KojiGeneralGeneralOMC #002 Delamination repair Part2 (3)Inspection

 
 8x 
  445   Wed Aug 24 11:29:47 2022 KojiGeneralGeneralOMC #002 ready for shipment[Stephen Koji]

The OMC #002 is ready for
shipment.
 IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg 
  446   Thu Aug 25 14:22:08 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationInspected the past LLO add-on mass configuration.

There are unknown masses at the
DCPD side. It looks like a small SS mass
 DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG 
  447   Thu Aug 25 20:05:00 2022 KojiGeneralGeneralLLO OMC #001 Ballast Mass investigationHere is the balance mass info for the LLO
OMC#001 analyzed from the photographs


Added masses are: 50+10g,
 balance_mass_config_LLO.pdf 
  448   Fri Aug 26 22:29:02 2022 KojiGeneralGeneralTool Shipping PrepShipping preparation for the LLO
trip

Started
July 15, 2022 and finished Aug 30. So it
 PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg 
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  450   Mon Sep 26 14:27:49 2022 KojiGeneralGeneralLLO OMC ICS workOMC
#001


ICS Link: https://ics.ligo-la.caltech.edu/JIRA/browse/ASSY-D1201439-1
Already
  
  452   Mon Nov 7 22:00:33 2022 KojiOpticsConfigurationSetting up the fiber couplersFiber matching: 43.2/56.7 = 76%
S/P-pol ratio 0.7/43.2 = 1.6%

 
  
  453   Fri Nov 11 19:07:48 2022 KojiSupplyGeneralSupply OrderClean Supply Ordered


TexWipe TX8410 AlphaSat
Vectra Alpha 10 50 sheets x 12 pk  (VWR
  
  455   Mon Nov 14 09:27:13 2022 KojiOpticsCharacterizationtransmission measurements through OMC #1 (before cleaning)The measured total optical loss of the
OMC was

1st:   0.015 +/- 0.003
 OMC_Powerbudget.xlsx 
  457   Tue Nov 15 10:58:53 2022 KojiOpticsGeneralOMC #1 damaged black glass removal[Camille, Koji]

The damaged black glass was removed
from the OMC breadboard leaving the glass
 PXL_20221114_222641455.jpgPXL_20221114_222544330.jpgPXL_20221114_222555849.jpgPXL_20221114_233748631.jpg 
  458   Tue Nov 15 11:12:24 2022 KojiOpticsGeneralOMC #1 fogging on the AR side of BS1 cleaned[Camille, Koji]

Photo of the BS1 AR cleaning process

Attachment 1: Before cleaning.
 PXL_20221114_225338114.jpgPXL_20221114_232824245.jpgPXL_20221114_233714774.jpgPXL_20221114_233748631.jpg 
  459   Thu Nov 17 18:56:22 2022 KojiOpticsGeneral Transmission measurements of OMC #1 after deep cleaning[Camille, Koji]

- Removed the first contact we
left on Monday.
 PXL_20221117_232145418.jpgScreen_Shot_2022-11-17_at_19.02.31.png 
  460   Thu Nov 17 19:50:00 2022 KojiOpticsCharacterizationConclusion on the cleaning of OMC #001Conclusion on the cleaning of OMC
#001

- After a couple of first contact
 OMC_loss.pdf 
  462   Mon Nov 21 19:13:35 2022 KojiGeneralGeneralTransmission measurement (2nd deep cleaning of OMC #1)OMC Transmission measurement after
the 2nd deep cleaning

The 2nd deep cleaning didn't
 PXL_20221122_030736513.jpgOMC_loss.pdf 
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  300   Mon Jul 2 15:27:31 2018 Rich AbbottElectronicsGeneralWork on EOM (3rd IFO unit)Koji, Rich

We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO
 EOM3_aLIGO_3rdIfo.JPG 
  301   Tue Jul 3 12:07:47 2018 Rich AbbottElectronicsCharacterizationNotes on 3rd IFO EOMAttached please see my notes summarizing
the models for the electrodes and inductors
within the 3rd IFO EOM
 EOM_Analysis2.pdf 
  305   Wed Aug 8 17:32:56 2018 Rich AbbottGeneralCharacterizationModulation Index Test Setup at 40m LabAttached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator
 40mLabModIndexSetup.pdf 
  290   Thu Nov 30 12:18:41 2017 StephenGeneralGeneralPreparation for Modal Testing on 4 DecemberNorna Robertson, Stephen Appert || 
29 Nov 2017, 2 pm to 4 pm  || 
227 Downs, CIT
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  358   Thu May 9 16:07:18 2019 StephenMechanicsGeneralImprovements to OMC Bonding Fixture[Stephen, Koji]

As mentioned in eLOG
331, either increased thermal cycling
 image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG 
  367   Tue May 28 12:14:20 2019 StephenOpticsGeneralCM PZT Assembly Debonding of EP30-2 in Acetone[LiyuanZ, StephenA]

Downs B119

Summary:
 8x 
  371   Thu Aug 22 12:35:53 2019 StephenOpticsCharacterizationWedging of the debonded PZTs 2019 AugustWedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first
 IMG_4775.JPGIMG_4770.JPG 
  375   Wed Sep 18 22:30:11 2019 StephenSupplyGeneralEP30-2 Location and StatusHere is a summary of the events of the
last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that
 IMG_5217.JPG 
  376   Wed Sep 18 23:16:06 2019 StephenSupplyGeneralItems staged at 40m Bake Lab for PZT Subassembly BondingThe following items are presently staged
at the 40m Bake Lab (see photo indicating
current location) (noting items broght by
 IMG_5216.JPGIMG_5215.JPG 
  377   Wed Sep 18 23:38:52 2019 StephenGeneralGeneralDirty ABO ready for PZT Subassembly BondingThe 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab,
 index.png 
  379   Tue Sep 24 12:19:20 2019 StephenGeneralGeneral Dirty ABO test run prior to PZT Subassembly Bonding The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab
 image_showing_20190923_abo_qualifying_bake.png 
  380   Thu Sep 26 17:33:52 2019 StephenGeneralGeneralDirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!Follow up on OMC
elog 379

I was able to obtain the following
 image_showing_20190924_abo_qualifying_bake.png 
  382   Tue Oct 22 10:25:01 2019 StephenGeneralGeneralOMC PZT Assy #9 and #10 Production Cure Bake OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started
 OMC_ABO_PZT_Curing_Bake_effort_201906_thru_201909.xlsproduction_cure_bake_pzt_assys_9_and_10_20190927.png 
  383   Tue Oct 22 11:52:53 2019 StephenGeneralGeneralEpoxy Curing Timeline of OMC PZT Assy #9 and #10This post captures the curing timeline
followed by OMC PZT Assys #9 and #10.

Source file posted in case any
 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx 
  384   Tue Oct 22 11:56:09 2019 StephenSupplyGeneralEpoxy Status update as of 22 October 2019The following is the current status of
the epoxies used in assembly of the OMC (excerpt
from C1900052)
 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG 
  387   Fri Dec 13 14:59:18 2019 StephenGeneralGeneralOMC Beam Dump Production Cure Bake[Koji, Jordan, Stephen]

The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned
 IMG_6080.JPGIMG_6079.JPG 
  407   Fri Feb 5 07:40:37 2021 StephenSupplyGeneralOMC Unit 4 Build Machined PartsOMC Unit 4 Build Machined Parts are currently
located in Stephen's office. See image
of large blue box from office, below.
 IMG_8117.JPG 
  411   Wed Jul 7 14:21:50 2021 StephenSupplyGeneralOMC Unit 4 Build Machined PartsMore explicit insights into the inventory
for the Unit 4 build. Image of inventory
included below.
 IMG_9238.JPGIMG_9236.JPG 
  4   Wed Jun 20 20:37:45 2012 ZachOpticsConfigurationTopology / parameter selectionEDIT (ZK): All the plots here were generated  8x 
  5   Thu Jun 21 03:07:27 2012 ZachOpticsConfigurationParameter selection / mode definitionEDIT 2 (ZK): As with the   geom_bowtie.pnggeom_non-bowtie.png 
  6   Fri Jun 29 11:26:04 2012 ZachOpticsCharacterizationRoC measurement setupHere is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method".
 RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip 
  9   Sun Jul 22 15:56:53 2012 ZachOpticsCharacterizationRoC measurement setupHere is a more detailed version of
the setup, so that we can gather the parts
we will need.
 detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip 
  67   Tue Mar 5 19:37:00 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsEDIT (ZK): Koji points out that (1 -
Ti) should really be the non-resonant reflectivity
of the aligned cavity, which is much closer
 eOMC_visibility_3_4_13.png 
  68   Wed Mar 6 23:24:58 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsI found that, in fact, I had lowered
the modulation depth since when I measured
it to be 0.45 rads --> Psb = 0.1.
 TEK00005.PNGTEK00007.PNGeOMC_visibility_3_4_13.pngeOMC_AMTF_vs_power_3_6_13.png 
  74   Wed Mar 20 09:38:02 2013 ZachOpticsCharacterization[LLO] OMC test bench modified For various reasons, I had to switch
NPROs (from the LightWave 126 to the Innolight
Prometheus).
 new_setup_traced.jpg 
  86   Thu Mar 28 03:37:07 2013 ZachOpticsConfigurationTest setup input optics progress[Lisa, Zach]
Last night (Tuesday), I finished
setting up and aligning most of the input
 OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg 
  87   Fri Mar 29 08:55:00 2013 ZachOpticsConfigurationBeam launched into fiber

    

       
            
  
  94   Thu Apr 4 00:35:42 2013 ZachOpticsConfigurationMMT installed on breadboard, periscope built[Koji, Zach]
 2013-04-03_23.43.00.jpg 
  99   Fri Apr 5 18:18:36 2013 ZachOpticsConfigurationAOM probably broken

    

       
            
 Isomet_1250C_zin_4_5_13.png 