382
|
Tue Oct 22 10:25:01 2019 |
Stephen | General | General | OMC PZT Assy #9 and #10 Production Cure Bake | OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started |
 |
383
|
Tue Oct 22 11:52:53 2019 |
Stephen | General | General | Epoxy Curing Timeline of OMC PZT Assy #9 and #10 | This post captures the curing timeline
followed by OMC PZT Assys #9 and #10.
Source file posted in case any |
 |
387
|
Fri Dec 13 14:59:18 2019 |
Stephen | General | General | OMC Beam Dump Production Cure Bake | [Koji, Jordan, Stephen]
The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned |
 |
388
|
Wed Dec 18 21:54:53 2019 |
Koji | General | General | OMC Beam Dump Production Cure Bake | The beamdumps were taken out from the oven
and packed in bags.
The bottom of the V are completely |
  |
389
|
Thu Feb 27 14:31:13 2020 |
Koji | General | General | Item lending | Item lending as per Ian's request:
Particle Counter from OMC Lab to QIL
|
|
390
|
Mon Aug 10 15:29:54 2020 |
Koji | General | General | Item lending | The particle counter came back to the OMC
lab on Aug 10, 2020
|
|
392
|
Mon Aug 10 15:53:46 2020 |
Koji | General | General | Lab status check | Check-in to the OMC lab to see the status.
Nothing seemed changed. No bug. The HEPA
is running normal. The particle level was |
|
393
|
Mon Sep 28 16:03:13 2020 |
rana | General | General | OMC Beam Dump Production Cure Bake |
are there any measurements of the BRDF
of these things? I'm curious how much
light is backscattered into the incoming |
|
394
|
Mon Sep 28 16:13:08 2020 |
Koji | General | General | OMC Beam Dump Production Cure Bake | According to the past backscatter test
of the OMC (and the black glass beamdump:
not V type but triangular type on a hexagonal-mount), |
|
395
|
Thu Oct 8 19:55:22 2020 |
Koji | General | Characterization | Power Measurement of Mephisto 800NE 1166A | The output of Mephisto 800NE (former TNI
laser) was measured.
The output power was measured with |
|
396
|
Fri Oct 9 01:01:01 2020 |
Koji | General | General | TFT Monitor mounting | To spare some room on the optical table,
I wanted to mount the two TFT monitor units
on the HEPA enclosure frame. |
    |
397
|
Fri Oct 16 00:53:29 2020 |
Koji | General | General | TFT Monitor mounting | The image flipping of the display unit
was fixed. The vendor told me how to fix
it. |
|
398
|
Fri Oct 23 19:09:54 2020 |
Koji | General | General | Particle counter transfered to Radhika | See this entry: https://nodus.ligo.caltech.edu:8081/40m/15642 |
|
399
|
Fri Nov 6 18:38:00 2020 |
Koji | General | General | Powermeter lent from OMC Lab to 2um ECDL | Thorlabs' powermeter controler +
S401C head was lent from OMC Lab. Returned
to OMC Jul 15, 2022 KA |
|
401
|
Fri Nov 20 18:51:23 2020 |
Koji | General | General | Instrument loan | FEMTO DLPCA200 low noise preamp (brand
new)
Keithley Source Meter 2450 (brand |
|
408
|
Thu May 20 17:03:50 2021 |
Koji | General | General | SRS LCR meter SRS720 borrowed from Downs | Item loan: SRS LCR meter SRS720 borrowed
from Downs. The unit is at the 40m right
now for testing with an excelitas PD. Once |
|
409
|
Sun May 30 15:17:16 2021 |
Koji | General | General | DCPD AF capacitance measirement | Attachment 1: System diagram.
The reverse bias voltage is controlled by
DS335. This can produce a voltage offset |
    |
410
|
Sun May 30 15:32:56 2021 |
Koji | General | General | DCPD AF capacitance measirement | Measurement result:
The capacitance at no bias was
460~500pF. This goes down to below 300pF |
 |
413
|
Tue Jun 28 16:13:34 2022 |
Koji | General | General | The small optical table not small enough to get out | The table width was an inch too large compared
to the door width. We need to tilt the table
and it seemed too much for us. Let's |
|
414
|
Fri Jul 15 22:14:14 2022 |
Koji | General | General | OMC Lab recovery for the OMC #002 test | - The lab is chilly (18degC)
- Cleaned the lab and the optical
table a bit so that the delicate work can |
    |
415
|
Mon Jul 18 14:20:09 2022 |
Koji | General | General | OMC #002 Plan Portal | ==
Initial Preparation ==
[Done] OMC #002 |
|
416
|
Tue Jul 19 03:17:56 2022 |
Koji | General | General | OMC #002 Power Budget before mirror cleaning | o Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW |
|
417
|
Thu Jul 21 02:55:06 2022 |
Koji | General | General | OMC #002 Power Budget after mirror cleaning | o Power Budget after FirstContact
cleaning (2022/07/20)
NPRO ADJ -50 (min) |
|
418
|
Thu Jul 21 13:21:27 2022 |
Koji | General | Configuration | Windows laptop for WincamD Beam'R2 recovery | The Windows laptop for WincamD/Beam'R2
(DELL Vostro3300) was not functional.
- Windows 7 got stuck in the starting |
|
419
|
Thu Jul 21 14:35:35 2022 |
Koji | General | General | Bond reinforcement blocks for the invar brackets | Bond reinforcement blocks for the
invar brackets:
Attachment 1: |
 |
420
|
Thu Jul 21 14:55:48 2022 |
Koji | General | General | Optics bonding for the backscatter measurement | The backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's |
|
421
|
Thu Jul 21 17:47:00 2022 |
Koji | General | General | The profile of the beam incident on the fiber input coupler | The profile of the beam incident on the
fiber input
The fiber input was deflected by |
|
422
|
Fri Jul 22 00:31:17 2022 |
Koji | General | General | OMC #002 backscatter measurement | Measure the power ratio between the forward-propagating
and reverse-propagating beams.
Place a small deflecting |
|
423
|
Fri Jul 22 17:41:01 2022 |
Koji | General | General | SRS LCR meter SRS720 returned to Downs | SRS LCR meter SRS720 was returned to Downs
as before.
|
|
424
|
Fri Jul 22 17:47:38 2022 |
Koji | General | General | C&B request for the reinforcement blocks | OMC Reinforcement blocks
1. P/N D1600316; Version v4; Type
01; Qty 30; Source Chemistry Machine Shop |
|
425
|
Mon Jul 25 18:25:04 2022 |
Koji | General | General | A/C Filter was replaced |
New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, |
|
426
|
Tue Jul 26 00:01:59 2022 |
Koji | General | General | OMC #002 delamination check 2 | More epoxy delamination check:
DCPD R (Attachment 1):
Found half delaminated |
  |
427
|
Tue Jul 26 00:12:58 2022 |
Koji | General | General | High QE PD: QE measurements | - Installed the High QE PDs to OMC #002
B1-22@Cage B1 was
installed to the transmission DCPD
B1-23@Cage |
|
428
|
Wed Jul 27 10:09:51 2022 |
Koji | General | General | 4+4 wire clamp in hand | Regarding: D1200971
- 4 CLASS A wire clamp obtained |
|
429
|
Wed Jul 27 10:34:09 2022 |
Koji | General | General | High QE PD: QE measurements 2 | - DLPCA-200 trans-impedance amplifier was
calibrated.
Keithley source meter 2450 |
 |
430
|
Wed Jul 27 10:34:30 2022 |
Koji | General | General | OMC #002 Protective FirstContact Paint | The optical surfaces were coated with FirstContact
to keep them clean / somewhat protected during
the transportation. |
|
431
|
Wed Jul 27 23:52:18 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (1) | Parts
check
- D1300052-V3 SN001 is going to |
    |
432
|
Thu Jul 28 00:28:15 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (2) | Connector
unmounting
- (Attachment 1) |
  |
433
|
Thu Jul 28 00:46:47 2022 |
Koji | General | General | Subject: OMC #002 Cable bracket replacement (3) | Checking the spare parts
- Conclusion for OMC#2:
need PEEK cable |
  |
434
|
Wed Aug 10 18:42:27 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (4) | [Stephen Koji]
Now we got the C&Bed parts
to continue to work on the cable bracket |
  |
435
|
Thu Aug 11 15:24:57 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (5) | - The hole size extension
is going forwared now. |
|
436
|
Mon Aug 15 21:31:56 2022 |
Koji | General | General | OMC #002 Cable bracket replacement (6) | The cable bracket was successfully
replaced.
Looking from the QPD side |
  |
437
|
Mon Aug 15 22:06:18 2022 |
Koji | General | General | OMC #002 new cable tie installed | [Stephen Koji]
New cable ties were installed on
the cable pegs attached to the long sides |
 |
438
|
Mon Aug 15 22:43:35 2022 |
Koji | General | General | OMC #002 Delamination repair Part1 (1) | [Stephen Koji]
Checked the delamination
status: |
 |
439
|
Mon Aug 15 22:49:03 2022 |
Koji | General | General | OMC #002 Delamination repair Part1 (2) | EP30-2
preparation
Two Al foil cups + A sheet |
7x |
440
|
Wed Aug 24 02:51:23 2022 |
Koji | General | General | OMC #002 Delamination repair Part1 (3) | Inspection of the bonding on the
suspension interface side. All look good. |
8x |
441
|
Wed Aug 24 02:53:46 2022 |
Koji | General | General | OMC #002 Delamination repair Part2 (1) | Inspection of the delaminations in the
optics side |
    |
442
|
Wed Aug 24 02:57:43 2022 |
Koji | General | General | EP30-2 bonding setup | EP30-2 bonding setup |
  |
443
|
Wed Aug 24 03:20:59 2022 |
Koji | General | General | OMC #002 Delamination repair Part2 (2) | Bonding |
11x |
444
|
Wed Aug 24 03:26:43 2022 |
Koji | General | General | OMC #002 Delamination repair Part2 (3) | Inspection
|
8x |