Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress  
|
Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber
|
Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber
|
Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken
|
Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test 
|
Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure 
|
Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity
|
Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built
|
Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test
|
Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
|
Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface  
|
Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration
|
Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints
|
Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
|
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
|
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
|
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
|
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
|
Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building
|
Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing   
|
Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement 
|
Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued   
|
Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC  
|
Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered
|
Wed Mar 20 09:38:02 2013, Zach, Optics, Characterization, [LLO] OMC test bench modified
|
Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing
|
Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD
|
Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test
|
Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 
|
Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts    
|
Tue Mar 5 19:37:00 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details
|
Wed Mar 6 23:24:58 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details   
|
Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test 
|
Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test
|
Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final
|
Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test
|
Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m 
|
Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection
|
Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed
|
Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator
|
Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration
|
Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism
|
Sun Jan 6 23:22:21 2013, Koji, Mechanics, General, SolidWorks model of the OMC suspension 
|
Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test 
|
Wed Jan 2 07:35:55 2013, Koji, Optics, Characterization, Thickness of a curved mirror
|
Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement
|
Mon Dec 31 03:10:09 2012, Koji, Optics, General, SolidWorks model of the OMC breadboard 
|
Mon Dec 31 01:45:04 2012, Koji, General, General, Work completed in Nov and Dec [!]
|
Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired  
|
Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot
|
Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot
|
Tue Dec 18 20:04:40 2012, Koji, Optics, Characterization, Prism Thickness Measurement
|
Thu Nov 29 21:18:23 2012, Koji, Optics, General, OMC Mounting Prisms have come 
|
Mon Nov 26 01:40:00 2012, Koji, Optics, Characterization, More RoC measurement
|
Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement 
|
Mon Nov 19 13:33:14 2012, Koji, Optics, Characterization, Resuming testing mirror RoCs
|
Sat Nov 17 02:31:34 2012, Koji, Optics, Characterization, Mirror T test
|
Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement 
|
Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate
|
Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy
|
Thu Nov 8 19:47:55 2012, Koji, Electronics, Configuration, Solder for PZTs
|
Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement
|
Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!]
|
|