  60   Wed Feb 6 02:34:10 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMeasurement:

    A6:   α
= 0.665 deg, β = +3.0 arcmin (1.5 div
  
  59   Mon Feb 4 00:39:08 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMethod:

    Mount the tombstone prism
on the prism mount. The mount is fixed on
 autocollimator_wedge_measurement.pdf 
  58   Tue Jan 22 17:56:32 2013 KojiMechanicsGeneralRotary stage selectionNewport UTR80

    Sensitivity: 4 arcsec
  
  57   Tue Jan 22 11:10:25 2013 KojiFacilityGeneralEyeware storage and hooks for the face shields are installedA carpenter has come to install the eyeware
storage and hooks for the face shields.
 P1223116.JPG 
  56   Sat Jan 19 20:47:41 2013 KojiOpticsCharacterizationWedge measurement with the autocollimatorThe wedge angle of the prism "A1"
was measured with the autocollimator (AC).
The range of the AC is 40 arcmin.
 autocollimator_wedge_measurement.pdf 
  55   Fri Jan 18 13:25:17 2013 KojiOpticsConfigurationAutocollimator calibrationAn autocollimator (AC) should show (0,0)
if a retroreflector is placed in front of
the AC.
 autocollimator_calibration.pdf 
  54   Wed Jan 16 14:10:50 2013 KojiOpticsCharacterizationAutocollimator tests of optics perpendicularity/parallelismThe
items:
- Autocollimator (AC) borrowed from
  
  53   Thu Jan 10 18:37:50 2013 KojiOpticsCharacterizationWedging of the PZTsYesterday I measured the thickness of the
PZTs in order to get an idea how much the
PZTs are wedged.
 PZT_wedging.pdf 
  52   Sun Jan 6 23:22:21 2013 KojiMechanicsGeneralSolidWorks model of the OMC suspension    D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm 
  51   Wed Jan 2 07:45:39 2013 KojiOpticsCharacterizationFirst Contact testConclusion:
Good. First contact did not damage the coating
surface, and reduced the loss
 Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf 
  50   Wed Jan 2 07:35:55 2013 KojiOpticsCharacterizationThickness of a curved mirrorMeasured the thickness of a curved mirror:
Took three points separated by 120
degree.
  
  49   Mon Dec 31 03:11:45 2012 KojiOpticsCharacterizationFurther more RoC measurementTotal (excluding C2, C7, C8): 2.575 +/-
0.005 [m]
New results
 Cav_scan_response_zoom_20121125_C6_9.pdf 
  48   Mon Dec 31 03:10:09 2012 KojiOpticsGeneralSolidWorks model of the OMC breadboard   D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm 
  47   Mon Dec 31 01:45:04 2012 KojiGeneralGeneralWork completed in Nov and Dec [!]Completed work of the previous months:
[Jul]
[Aug]
  
  46   Wed Dec 26 14:33:33 2012 KojiFacilityGeneralLase Interlock wiredTwo switches are connected in series.  PC263073.jpgPC263074.jpgPC263075.jpg 
  45   Wed Dec 19 18:47:03 2012 KojiCleanGeneralFirst Contact Training with MargotSteve and I visited Margot to have a training
session for application of First Contact
on optics.
  
  44   Tue Dec 18 20:04:40 2012 KojiOpticsCharacterizationPrism Thickness MeasurementThe thicknesses of the prism mirrors (A1-A5)
were measured with micrometer thickness gauge.
Since the thickness of the thinner
 prism.png 
  43   Thu Nov 29 21:18:23 2012 KojiOpticsGeneralOMC Mounting Prisms have come   PB293030.JPGPB293032.JPG 
  42   Mon Nov 26 01:40:00 2012 KojiOpticsCharacterizationMore RoC measurementC1: RoC: 2.57845 +/− 4.2e−05m
 RoC_measurement.pdf 
  41   Mon Nov 19 13:33:14 2012 KojiOpticsCharacterizationResuming testing mirror RoCsIn order to resume testing the curvatures
of the mirrors, the same mirror as the previous
one was tested.
 Cav_scan_response_zoom_20121016.pdf 
  40   Sat Nov 17 02:31:34 2012 KojiOpticsCharacterizationMirror T testMirror T test
The mirror was misaligned to have
~2deg incident (mistakenly...) angle.
  
  39   Fri Nov 9 00:43:32 2012 KojiOpticsCharacterizationFurther more wedge measurementNow it's enough for the first OMC (or even
second one too).
Today's measurements all distributed
 wedge_measurement_overall.pdf121108a_A1.pdf 
  38   Thu Nov 8 20:12:10 2012 KojiOpticsConfigurationHow many glass components we need for a plateOptical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
  
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  36   Thu Nov 8 19:47:55 2012 KojiElectronicsConfigurationSolder for PZTsRich saids:
I
  
  35   Thu Nov 8 13:24:53 2012 KojiOpticsCharacterizationMore wedge measurementA1
Horiz Wedge    0.497   
+/-    0.004 deg
 wedge_measurement_overall.pdf 
  34   Wed Nov 7 20:44:11 2012 KojiGeneralGeneralPlan Update: November [!]Completed work of the previous months:
[Jul]
[Aug]
 OMC_Project_Schedule.pdf 
  33   Wed Nov 7 20:21:42 2012 KojiGeneralGeneralWork completed in October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  32   Wed Nov 7 01:28:20 2012 KojiOpticsCharacterizationWedge angle test (A1)Wedge
angle test
Result: Wedge angle of Prism A1:
 wedge_measurement.pngwedge_measurement_setup.png 
  31   Thu Oct 18 20:23:33 2012 KojiOpticsCharacterizationImproved measurementSignificant
improvement has been achieved in the RoC
 Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf 
  30   Wed Oct 17 20:36:04 2012 KojiOpticsGeneralRoC test cavity lockedThe RoC test setup has been built on
the optical table at ATF.
 detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf 
  29   Tue Oct 16 15:51:01 2012 KojiGeneralGeneralPlan Update: October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  28   Tue Oct 16 15:50:09 2012 KojiGeneralGeneralWork completed in August/September [!]
    Work done
   

        
  
  27   Tue Oct 16 14:50:54 2012 jamie, jeffGeneralGeneralOMC breadboard/plate measurement dimensionsWe have measured the dimensions and mass
of the OMC glass plates/breadboards:

  
  26   Fri Oct 12 17:15:19 2012 KojiOpticsGeneralLoan from the 40m / ATF
    HWP set
         
    
  
  25   Tue Oct 9 05:03:15 2012 KojiElectronicsGeneralOMC Test Electronics Setup   electronics_setup.pngelectronics_setup.pdf 
  24   Tue Oct 9 04:59:24 2012 KojiOpticsGeneralOMC Test Optical Setup   OMC_test_setup.pngOMC_test_setup.pdf 
  23   Mon Oct 8 11:30:47 2012 KojiOpticsGeneralEG&G 2mm photodiode angle responseEGE&G 2mm photodiode angle response
measured by Sam T1100564-v1
  
  22   Fri Oct 5 03:39:58 2012 KojiOpticsGeneralRoC Test setupBased on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test.
 RoC_test_setup.pdfRoC_test_setup.png 
  21   Mon Oct 1 16:06:55 2012 KojiCleanGeneralParticle Counts1. It turned out that the particle
counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
  
  20   Tue Sep 25 14:18:14 2012 KojiCleanGeneralParticle CountsParticle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts
  
  19   Wed Aug 22 20:16:43 2012 KojiFacilityGeneralWorkbenches have been installed / Clean room stoolsLast Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool.
 P8171968.jpgP8171969.jpg 
  18   Tue Aug 14 03:29:06 2012 KojiSupplyGeneralClean supply rackClean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to
 P8131959.JPGP8131961.JPG 
  17   Mon Aug 13 17:01:35 2012 KojiCleanGeneralParticle CountsAug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um   400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A)
  
  16   Mon Aug 13 16:59:11 2012 KojiCleanGeneralRoom Cleaning LogFloor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012)
  
  15   Sat Aug 11 00:59:14 2012 KojiFacilityGeneralLaser Safety BarrierIt seemed that a laser safety barrier was
installed today!?
 P8131960.JPG 
  14   Wed Aug 1 19:35:00 2012 KojiFacilityGeneralFloor cleaned / Workbench being built / Table top defect-
The floor of the room was cleaned and waxed!
-
 P8011949.JPGP8011947.JPGP8011948.JPG 
  13   Tue Jul 31 21:33:17 2012 KojiGeneralGeneralPlan Update: August [!]Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec]
  
  12   Tue Jul 31 21:29:43 2012 KojiGeneralGeneralWork completed in July [!]
    Completed Work: Facility/Supplies

   
        
  
  11   Tue Jul 24 11:41:29 2012 KojiGeneralGeneralUseful referencesNicolas Smith,
LIGO Document T0900383-v1
  
ELOG V3.1.3-