Entry  Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount 
DCPD mounts and QPD mounts were attached on the breadboard. They are not aligned yet and loosely fastened.
DCPD (mounting 4-40x5/16 BHCS Qty4)
Entry  Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting  
Yesterday Jeff and Chub worked on the cabling of the OMC. It turned out that the gender of the cable connectors 
going from the cavity side to  the connector bracket on top of the OMC were opposite from what is  needed.  
This way, the connectors can't fixed on the cable harness, thus they are free during the shipping.
Entry  Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment 
The QPD alignment was adjusted using the aligned beam to the cavity and the 4ch transimpedance amplifier.
As I have a test cable for the QPD, I attached a DB9 connector on it so that I can use the QPD transimpedance
amplifier to read the photocurrent. The transimpedance of the circuit is 1kV/A. 
    Reply  Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment QPD1.JPGQPD2.JPGQPD_calib.nb.zip
Peter F suggested to check the bottom surface of the PD housings if there is any protrusion/interference/whatever.
And that was true! It was found that the front side of QPD1 (Left) was lifted by a machining burr.
It seems that this burr consistently exists as the other one also have it (see QPD2 picture (right)) although it is not too terrible compared to
Entry  Mon Jun 3 21:19:03 2013, Koji, General, General, Planning 
Monday - Evening
(Koji)
[done] - DCPD alignment
Entry  Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT 
Applying First Contact for the optics cleaning
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
Entry  Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived 
[Koji Zach Suresh]
The OMC arrived at LLO without any destruction!

    We found that one shock sensor on the box turned red, the other stayed white.
    We brought the Perican case to the changing
Entry  Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf
[Koji Zach]
We worked on the OMC test over the weekend.
- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.
Entry  Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373
Entry  Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA 
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
Entry  Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status preamp_arrangement.png
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Entry  Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6 
OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486
   
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
Entry  Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4 PZT_assembly.pdf
Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components
    Reply  Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6 
PZT Assembly #5/#6 were glued on Fri Aug 9th
They are removed from the fixture on Mon Aug 12th.
All of the four PZT assemblies were moved to the OMC lab.
Entry  Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List 
Link to the "Mirror/PZT Characterization links"

Breadboard

BB1 OMC(001) OMC
Entry  Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started 
[Jeff Koji]

The breadboard (SN2) was loaded on the transportation fixture.

The laser side template was installed and the cavity mirrors were placed.
Entry  Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing 
[Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of the OMC locking
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
The glass components for the I1 OMC top side were glued by the UV glue.
Breadboard SN#4
Wire bracket SN#5/6/7/8
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Short conclusion: 
The roundtrip cavity length for the H1 OMC was adjusted to be 1.145m 
instead of 1.132m such that the 19th HOMs of the lower sideband do not get resonant together with the carrier.
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
H1 OMC Cavity side optics was glued on the breadboard
Curved mirror gluing
- Applied the UV glues to CM1/CM2 prisms.
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
Entry  Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping P9064377.JPG
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.
    Reply  Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done P9134379.jpgP9134378.jpg
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first. 
Entry  Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment 
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking 
- Removed the FC layers for the cavity related mirrors.
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response: 
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Entry  Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy 
Masks / Wipes => done
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
LHO OMC installation photos
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.
Entry  Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment 
STORY:
- The cavity mirrors have scattering spots. The cavity alignment should have been scanned to find a cavity mode to have lowest loss possible. 
  BTW, We only have horizontal dof for the alignment scan.
Entry  Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued P6196525.JPG
- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been glued

TODO
    Reply  Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued 
All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
    Reply  Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed 
The bottom-side templates were removed.
The last beam dump was removed
TODO
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
For baking:

    Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
    Reply  Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking P6266536.jpg
The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.
Link to the ICS entry
Entry  Fri Jun 27 18:51:33 2014, Koji, General, General, Supply 
PTOUCH TAPE (12mm white) x 2
9V batteries
    Reply  Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking 
OMC is back from the oven today.
To Do:
Optical tests
Entry  Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination beamdump_delamination.png
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2 
    Reply  Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination beamdump_delamination_solution.png
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure). 
In order to allow the air escape from the gap, the inside of the V will not be painted. 
Entry  Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement finesse_measurements_log.pdf
3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a HWP.
Entry  Mon Jul 7 01:36:03 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
    PZT AC response
    Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Firstly, the excess epoxy was removed using a cleaned razor balde
Entry  Thu Jul 10 01:39:38 2014, Koji, Electronics, General, PZT wire P7096669.JPG
Rich came to the OMC lab. Pins for the mighty mouse connector were crimped on the 4 PZT wires.
We found the male 4pin mighty mouse connector in the C&B area.
The cable inventory was checked with ICS/DCC combo. It turned out that most of the on-board cables
    Reply  Thu Jul 10 08:34:57 2014, Koji, General, General, To Do 
Optical tests

    Cleaning
    Power Budget
    FSR measurement
    TMS
measurement
    TMS measurement (with DC voltage on PZTs)
    PZT DC response
   
Entry  Sun Jul 20 17:20:39 2014, Koji, General, General, The 3rd (LIO) OMC was shipped out to LHO  
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.