40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 8 of 9
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
432 Entries
Goto page
Previous
1
,
2
,
3
...
7
, 8,
9
Next
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A
Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs
Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs
Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs
Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs
Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs
Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement
Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement
Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test
Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2
Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint
Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1)
Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)
Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3)
Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics
Mon Jul 2 15:27:31 2018, Rich Abbott, Electronics, General, Work on EOM (3rd IFO unit)
Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM
Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard
Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture
Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone
8x
Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
Goto page
Previous
1
,
2
,
3
...
7
, 8,
9
Next
ELOG V3.1.3-