ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
394
|
Mon Sep 28 16:13:08 2020 |
Koji | General | General | OMC Beam Dump Production Cure Bake | According to the past backscatter test
of the OMC (and the black glass beamdump:
not V type but triangular type on a hexagonal-mount), |
|
395
|
Thu Oct 8 19:55:22 2020 |
Koji | General | Characterization | Power Measurement of Mephisto 800NE 1166A | The output of Mephisto 800NE (former TNI
laser) was measured.
The output power was measured with |
|
396
|
Fri Oct 9 01:01:01 2020 |
Koji | General | General | TFT Monitor mounting | To spare some room on the optical table,
I wanted to mount the two TFT monitor units
on the HEPA enclosure frame. |
    |
397
|
Fri Oct 16 00:53:29 2020 |
Koji | General | General | TFT Monitor mounting | The image flipping of the display unit
was fixed. The vendor told me how to fix
it. |
|
398
|
Fri Oct 23 19:09:54 2020 |
Koji | General | General | Particle counter transfered to Radhika | See this entry: https://nodus.ligo.caltech.edu:8081/40m/15642 |
|
399
|
Fri Nov 6 18:38:00 2020 |
Koji | General | General | Powermeter lent from OMC Lab to 2um ECDL | Thorlabs' powermeter controler + S401C
head was lent from OMC Lab.
https://nodus.ligo.caltech.edu:8081/SUS_Lab/1856 |
|
400
|
Mon Nov 9 22:06:18 2020 |
Koji | Mechanics | General | 5th OMC Transport Fixture | I helped to complete the 5th OMC Transport
Fixture. It was built at the 40m clean room
and brought to the OMC lab. The fixture hardware |
 |
401
|
Fri Nov 20 18:51:23 2020 |
Koji | General | General | Instrument loan | FEMTO DLPCA200 low noise preamp (brand
new)
Keithley Source Meter 2450 (brand |
|
402
|
Sat Nov 21 13:58:30 2020 |
Koji | Electronics | Characterization | Dark Current Measurement for InGaAs QPDs | Dark current measurement for InGaAs QPDs
(OSI FCI-InGaAs-Q3000) has been done using
Keithley 2450 and Frank's diode test |
|
403
|
Sun Nov 22 13:49:12 2020 |
Koji | Electronics | Characterization | Impedance Measurement for InGaAs QPDs | To know any anomaly to the junction
capacitance of the QPD segments, the RF impedances
were tested with a hand-made impedance measurement. |
   |
404
|
Mon Nov 23 23:17:19 2020 |
Koji | Electronics | Characterization | The dark noise of the Q3000 QPDs | The dark noise levels of the four Q3000
QPDs were measured with FEMTO DLPCA200 low
noise transimpedance amp. |
   |
406
|
Tue Nov 24 12:27:18 2020 |
Koji | Electronics | Characterization | The dark noise of the Q3000 QPDs | The amplifier BW was 400kHz at the gain
of 1e7 V/A. And the max BW is 500kHz even
at a lower gain. I have to setup something |
|
408
|
Thu May 20 17:03:50 2021 |
Koji | General | General | SRS LCR meter SRS720 borrowed from Downs | Item loan: SRS LCR meter SRS720 borrowed
from Downs. The unit is at the 40m right
now for testing with an excelitas PD. Once |
|
409
|
Sun May 30 15:17:16 2021 |
Koji | General | General | DCPD AF capacitance measirement | Attachment 1: System diagram.
The reverse bias voltage is controlled by
DS335. This can produce a voltage offset |
    |
410
|
Sun May 30 15:32:56 2021 |
Koji | General | General | DCPD AF capacitance measirement | Measurement result:
The capacitance at no bias was
460~500pF. This goes down to below 300pF |
 |
336
|
Mon Apr 15 21:11:49 2019 |
Philip | Optics | Characterization | OMC(004): PZT testing for spare OMC | [Koji, Philip]
Today we tested the functionality
of the four remaining PZTs (11,12,13 and |
|
345
|
Wed Apr 17 10:30:37 2019 |
Philip | Optics | General | OMC optical set-up day 1 | [Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
|
|
347
|
Fri Apr 19 09:21:07 2019 |
Philip | Optics | | Cleaning of OMC optics | ach[Joe, Phillip, Koji,
Stephen]
Work from 17.04.2019 |
  |
300
|
Mon Jul 2 15:27:31 2018 |
Rich Abbott | Electronics | General | Work on EOM (3rd IFO unit) | Koji, Rich
We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO |
|
301
|
Tue Jul 3 12:07:47 2018 |
Rich Abbott | Electronics | Characterization | Notes on 3rd IFO EOM | Attached please see my notes summarizing
the models for the electrodes and inductors
within the 3rd IFO EOM |
|
305
|
Wed Aug 8 17:32:56 2018 |
Rich Abbott | General | Characterization | Modulation Index Test Setup at 40m Lab | Attached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator |
|
290
|
Thu Nov 30 12:18:41 2017 |
Stephen | General | General | Preparation for Modal Testing on 4 December | Norna Robertson, Stephen Appert ||
29 Nov 2017, 2 pm to 4 pm ||
227 Downs, CIT |
|
327
|
Thu Apr 11 10:54:38 2019 |
Stephen | General | General | OMC(004): preparation for the PZT subassembly bonding |
Quote:
|
|
344
|
Wed Apr 17 09:08:47 2019 |
Stephen | General | General | OMC(004): Unwrapping and preparing breadboard | [Stephen, Philip, Koji, Joe]
Breadboard D1200105 SN06 was selected
as described in eLOG |
    |
358
|
Thu May 9 16:07:18 2019 |
Stephen | Mechanics | General | Improvements to OMC Bonding Fixture | [Stephen, Koji]
As mentioned in eLOG
331, either increased thermal cycling |
 |
367
|
Tue May 28 12:14:20 2019 |
Stephen | Optics | General | CM PZT Assembly Debonding of EP30-2 in Acetone | [LiyuanZ, StephenA]
Downs B119
Summary: |
8x |
371
|
Thu Aug 22 12:35:53 2019 |
Stephen | Optics | Characterization | Wedging of the debonded PZTs 2019 August | Wedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first |
 |
375
|
Wed Sep 18 22:30:11 2019 |
Stephen | Supply | General | EP30-2 Location and Status | Here is a summary of the events of the
last week, as they relate to EP30-2.
1) I lost the EP30-2 syringes that |
|
376
|
Wed Sep 18 23:16:06 2019 |
Stephen | Supply | General | Items staged at 40m Bake Lab for PZT Subassembly Bonding | The following items are presently staged
at the 40m Bake Lab (see photo indicating
current location) (noting items broght by |
 |
377
|
Wed Sep 18 23:38:52 2019 |
Stephen | General | General | Dirty ABO ready for PZT Subassembly Bonding | The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab, |
|
379
|
Tue Sep 24 12:19:20 2019 |
Stephen | General | General | Dirty ABO test run prior to PZT Subassembly Bonding | The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab |
|
380
|
Thu Sep 26 17:33:52 2019 |
Stephen | General | General | Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! | Follow up on OMC
elog 379
I was able to obtain the following |
|
382
|
Tue Oct 22 10:25:01 2019 |
Stephen | General | General | OMC PZT Assy #9 and #10 Production Cure Bake | OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started |
 |
383
|
Tue Oct 22 11:52:53 2019 |
Stephen | General | General | Epoxy Curing Timeline of OMC PZT Assy #9 and #10 | This post captures the curing timeline
followed by OMC PZT Assys #9 and #10.
Source file posted in case any |
 |
384
|
Tue Oct 22 11:56:09 2019 |
Stephen | Supply | General | Epoxy Status update as of 22 October 2019 | The following is the current status of
the epoxies used in assembly of the OMC (excerpt
from C1900052) |
|
387
|
Fri Dec 13 14:59:18 2019 |
Stephen | General | General | OMC Beam Dump Production Cure Bake | [Koji, Jordan, Stephen]
The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned |
 |
407
|
Fri Feb 5 07:40:37 2021 |
Stephen | Supply | General | OMC Unit 4 Build Machined Parts | OMC Unit 4 Build Machined Parts are currently
located in Stephen's office. See image
of large blue box from office, below. |
|
411
|
Wed Jul 7 14:21:50 2021 |
Stephen | Supply | General | OMC Unit 4 Build Machined Parts | More explicit insights into the inventory
for the Unit 4 build. Image of inventory
included below. |
 |
4
|
Wed Jun 20 20:37:45 2012 |
Zach | Optics | Configuration | Topology / parameter selection | EDIT (ZK): All the plots here were generated |
8x |
5
|
Thu Jun 21 03:07:27 2012 |
Zach | Optics | Configuration | Parameter selection / mode definition | EDIT 2 (ZK): As with the |
 |
6
|
Fri Jun 29 11:26:04 2012 |
Zach | Optics | Characterization | RoC measurement setup | Here is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method". |
 |
9
|
Sun Jul 22 15:56:53 2012 |
Zach | Optics | Characterization | RoC measurement setup | Here is a more detailed version of
the setup, so that we can gather the parts
we will need. |
 |
67
|
Tue Mar 5 19:37:00 2013 |
Zach | Optics | Characterization | eLIGO OMC visibility vs. power measurement details | EDIT (ZK): Koji points out that (1 -
Ti) should really be the non-resonant reflectivity
of the aligned cavity, which is much closer |
|
68
|
Wed Mar 6 23:24:58 2013 |
Zach | Optics | Characterization | eLIGO OMC visibility vs. power measurement details | I found that, in fact, I had lowered
the modulation depth since when I measured
it to be 0.45 rads --> Psb = 0.1. |
   |
74
|
Wed Mar 20 09:38:02 2013 |
Zach | Optics | Characterization | [LLO] OMC test bench modified | For various reasons, I had to switch
NPROs (from the LightWave 126 to the Innolight
Prometheus). |
|
86
|
Thu Mar 28 03:37:07 2013 |
Zach | Optics | Configuration | Test setup input optics progress | [Lisa, Zach]
Last night (Tuesday), I finished
setting up and aligning most of the input |
  |
87
|
Fri Mar 29 08:55:00 2013 |
Zach | Optics | Configuration | Beam launched into fiber |
|
|
94
|
Thu Apr 4 00:35:42 2013 |
Zach | Optics | Configuration | MMT installed on breadboard, periscope built | [Koji, Zach]
|
|
99
|
Fri Apr 5 18:18:36 2013 |
Zach | Optics | Configuration | AOM probably broken |
|
|
107
|
Wed Apr 10 00:40:30 2013 |
Zach | Optics | Configuration | fauxMC locked | [Koji, Zach]
|
|