40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 8 of 13  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categoryup Subject Text Attachments
  130   Thu May 23 23:41:48 2013 KojiMechanicsGeneralDCPD/QPD MountDCPD mounts and QPD mounts were attached
on the breadboard. They are not aligned yet
and loosely fastened.
  
  131   Thu May 30 14:38:42 2013 KojiElectronicsGeneralCable fitting Yesterday Jeff and Chub worked on the cabling
of the OMC. It turned out that the gender
of the cable connectors 
  
  132   Thu May 30 15:00:28 2013 KojiOpticsGeneralQPD alignmentThe QPD alignment was adjusted using
the aligned beam to the cavity and the 4ch
transimpedance amplifier.
  
  133   Fri May 31 05:46:54 2013 KojiOpticsGeneralQPD alignmentPeter F suggested to check the bottom surface
of the PD housings if there is any protrusion/interference/whatever.
And that was true! It was found that
 QPD1.JPGQPD2.JPGQPD_calib.nb.zip 
  136   Mon Jun 3 21:19:03 2013 KojiGeneralGeneralPlanningMonday - Evening
(Koji)
[done] - DCPD alignment
  
  138   Wed Jun 5 18:19:51 2013 KojiGeneralGeneralSome recent photos from the OMC final test at CITApplying First Contact for the optics cleaning
  
  139   Wed Jun 5 18:51:31 2013 KojiGeneralGeneralL1 OMC shipped out[Koji, Jeff]
The L1 OMC
 CAM00011.jpgP6054027.JPG 
  140   Fri Jun 7 16:04:44 2013 KojiGeneralGeneral[LLO] OMC arrived[Koji Zach Suresh]
The OMC arrived at LLO without any
destruction!
  
  141   Mon Jun 10 10:04:37 2013 KojiGeneralGeneral[LLO] OMC Test[Koji Zach]
We worked on the OMC test over
the weekend.
 OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf 
  142   Thu Jun 13 12:04:57 2013 KojiGeneralGeneral[LLO] OMC Optical Test - completedhttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373   
  143   Thu Jun 13 12:12:20 2013 ZachGeneralGeneral[LLO] OMC and OMCS in LVEAhttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
  
  144   Fri Jun 14 06:35:21 2013 JeffGeneralGeneral[LLO] L1 OMC statushttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation
 preamp_arrangement.png 
  146   Tue Jun 18 15:45:38 2013 KojiGeneralGeneral[LLO] OMC installation in HAM6OMC installed
in HAM6!
  
  147   Fri Jun 28 12:20:49 2013 KojiGeneralGeneralDmass's loan of Thorlabs HV amphttp://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
  
  149   Fri Aug 9 10:09:56 2013 KojiGeneralGeneralPZT Assembly #3/#4Yesterday, Jeff and I bonded the PZT assemblies
(#3/#4).
The attached is the arrangement of
 PZT_assembly.pdf 
  150   Mon Aug 12 20:22:19 2013 KojiGeneralGeneralPZT Assembly #5/#6PZT Assembly #5/#6 were glued on Fri Aug
9th
They are removed from the fixture
  
  152   Fri Aug 16 16:36:19 2013 KojiOpticsGeneralOptics ListLink
to the "Mirror/PZT Characterization
links"
  
  153   Fri Aug 16 17:21:38 2013 KojiGeneralGeneral[OMC002] Build started[Jeff Koji]

The breadboard (SN2) was loaded
on the transportation fixture.
  
  155   Thu Aug 22 15:34:03 2013 KojiOpticsGeneralOMC Cavity side gluing[Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of
  
  160   Thu Aug 29 18:55:36 2013 KojiMechanicsGeneralI1 OMC top side gluing (UV)The glass components for the I1 OMC top
side were glued by the UV glue.
Breadboard SN#4
  
  161   Fri Aug 30 12:14:50 2013 KojiOpticsGeneralH1 OMC Cavity length adjustmentShort
conclusion: 
The roundtrip cavity length for
 Gouy_FSR_130827.nb.zipP8284343.jpg 
  162   Fri Aug 30 12:22:56 2013 KojiOpticsGeneralH1 OMC Cavity side UV gluingH1 OMC Cavity side optics was glued
on the breadboard
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  168   Fri Sep 13 15:09:20 2013 KojiGeneralGeneralSprinkler installation: doneA sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap.
 P9134379.jpgP9134378.jpg 
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo BuyMasks / Wipes => done   
  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photosLHO OMC installation photos
  
  179   Fri Feb 28 19:50:11 2014 KojiGeneralGeneralMisalignment ABCD matrix for the aLIGO OMCRelationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647
 misalignment.pdf 
  182   Thu Apr 17 21:39:25 2014 KojiOpticsGeneralMore alignmentSTORY:
- The cavity mirrors have scattering
spots. The cavity alignment should have been
  
  187   Thu Jun 19 23:16:50 2014 KojiOpticsGeneralAll of the prisms have been glued- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued
 P6196525.JPG 
  188   Fri Jun 20 18:59:12 2014 KojiOpticsGeneralAll of the invar blocks have been gluedAll of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
  
  189   Mon Jun 23 21:54:16 2014 KojiOpticsGeneralAll of the gluing completedThe bottom-side templates were removed.
The last beam dump was removed
TODO
  
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  191   Fri Jun 27 12:29:50 2014 KojiGeneralGeneralOMC bakingThe OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours.
 P6266536.jpg 
  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupplyPTOUCH TAPE (12mm white) x 2
9V batteries
  
  193   Wed Jul 2 16:41:43 2014 KojiGeneralGeneralOMC bakingOMC is back from the oven today.
To Do:
Optical tests
  
  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delaminationWhile the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination.
 beamdump_delamination.png 
  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delaminationHere is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure).
 beamdump_delamination_solution.png 
  196   Sun Jul 6 02:45:56 2014 KojiOpticsGeneralFSR Measurement3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a
HWP.
 finesse_measurements_log.pdf 
  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  201   Tue Jul 8 04:08:06 2014 KojiGeneralGeneralExpoxy reapplication for beam dumpsFirstly, the excess epoxy was removed using
a cleaned razor balde
  
  203   Thu Jul 10 01:39:38 2014 KojiElectronicsGeneralPZT wireRich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires.
 P7096669.JPG 
  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO
  
ELOG V3.1.3-