  394   Mon Sep 28 16:13:08 2020 KojiGeneralGeneralOMC Beam Dump Production Cure BakeAccording to the past backscatter test
of the OMC (and the black glass beamdump:
not V type but triangular type on a hexagonal-mount),
  
  395   Thu Oct 8 19:55:22 2020 KojiGeneralCharacterizationPower Measurement of Mephisto 800NE 1166AThe output of Mephisto 800NE (former TNI
laser) was measured.
The output power was measured with
 Mephisto800NE_1166A.pdf 
  396   Fri Oct 9 01:01:01 2020 KojiGeneralGeneralTFT Monitor mountingTo spare some room on the optical table,
I wanted to mount the two TFT monitor units
on the HEPA enclosure frame.
 20201008214515_IMG_0152.jpg20201008214519_IMG_0153.jpg20201008214536_IMG_0154.jpg20201008220955_IMG_0155.jpg20201008221019_IMG_0156_2.jpg 
  397   Fri Oct 16 00:53:29 2020 KojiGeneralGeneralTFT Monitor mountingThe image flipping of the display unit
was fixed. The vendor told me how to fix
it.
  
  398   Fri Oct 23 19:09:54 2020 KojiGeneralGeneralParticle counter transfered to RadhikaSee this entry: https://nodus.ligo.caltech.edu:8081/40m/15642   
  399   Fri Nov 6 18:38:00 2020 KojiGeneralGeneralPowermeter lent from OMC Lab to 2um ECDLThorlabs' powermeter controler + S401C
head was lent from OMC Lab.

https://nodus.ligo.caltech.edu:8081/SUS_Lab/1856
  
  400   Mon Nov 9 22:06:18 2020 KojiMechanicsGeneral5th OMC Transport FixtureI helped to complete the 5th OMC Transport
Fixture. It was built at the 40m clean room
and brought to the OMC lab. The fixture hardware
 IMG_0211.jpgIMG_0221.jpg 
  401   Fri Nov 20 18:51:23 2020 KojiGeneralGeneralInstrument loanFEMTO DLPCA200 low noise preamp (brand
new)

Keithley Source Meter 2450 (brand
  
  402   Sat Nov 21 13:58:30 2020 KojiElectronicsCharacterizationDark Current Measurement for InGaAs QPDsDark current measurement for InGaAs QPDs
(OSI FCI-InGaAs-Q3000) has been done using
Keithley 2450 and Frank's diode test
 Q3000_dark_current.pdf 
  403   Sun Nov 22 13:49:12 2020 KojiElectronicsCharacterizationImpedance Measurement for InGaAs QPDsTo know any anomaly to the junction
capacitance of the QPD segments, the RF impedances
were tested with a hand-made impedance measurement.
 impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf 
  404   Mon Nov 23 23:17:19 2020 KojiElectronicsCharacterizationThe dark noise of the Q3000 QPDsThe dark noise levels of the four Q3000
QPDs were measured with FEMTO DLPCA200 low
noise transimpedance amp.
 Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf 
  406   Tue Nov 24 12:27:18 2020 KojiElectronicsCharacterizationThe dark noise of the Q3000 QPDsThe amplifier BW was 400kHz at the gain
of 1e7 V/A. And the max BW is 500kHz even
at a lower gain. I have to setup something
  
  408   Thu May 20 17:03:50 2021 KojiGeneralGeneralSRS LCR meter SRS720 borrowed from DownsItem loan: SRS LCR meter SRS720 borrowed
from Downs. The unit is at the 40m right
now for testing with an excelitas PD. Once
 P_20210520_154841.jpg 
  409   Sun May 30 15:17:16 2021 KojiGeneralGeneralDCPD AF capacitance measirementAttachment 1: System diagram.
The reverse bias voltage is controlled by
DS335. This can produce a voltage offset
 PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg 
  410   Sun May 30 15:32:56 2021 KojiGeneralGeneralDCPD AF capacitance measirementMeasurement result:

The capacitance at no bias was
460~500pF. This goes down to below 300pF
 highQEPD_capacitance.pdfC30665_capacitance.pdf 
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  300   Mon Jul 2 15:27:31 2018 Rich AbbottElectronicsGeneralWork on EOM (3rd IFO unit)Koji, Rich

We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO
 EOM3_aLIGO_3rdIfo.JPG 
  301   Tue Jul 3 12:07:47 2018 Rich AbbottElectronicsCharacterizationNotes on 3rd IFO EOMAttached please see my notes summarizing
the models for the electrodes and inductors
within the 3rd IFO EOM
 EOM_Analysis2.pdf 
  305   Wed Aug 8 17:32:56 2018 Rich AbbottGeneralCharacterizationModulation Index Test Setup at 40m LabAttached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator
 40mLabModIndexSetup.pdf 
  290   Thu Nov 30 12:18:41 2017 StephenGeneralGeneralPreparation for Modal Testing on 4 DecemberNorna Robertson, Stephen Appert || 
29 Nov 2017, 2 pm to 4 pm  || 
227 Downs, CIT
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  358   Thu May 9 16:07:18 2019 StephenMechanicsGeneralImprovements to OMC Bonding Fixture[Stephen, Koji]

As mentioned in eLOG
331, either increased thermal cycling
 image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG 
  367   Tue May 28 12:14:20 2019 StephenOpticsGeneralCM PZT Assembly Debonding of EP30-2 in Acetone[LiyuanZ, StephenA]

Downs B119

Summary:
 8x 
  371   Thu Aug 22 12:35:53 2019 StephenOpticsCharacterizationWedging of the debonded PZTs 2019 AugustWedge and thickness measurements of PZTs
12 and 13 took place after debonding and
cleaning - results are shown in the first
 IMG_4775.JPGIMG_4770.JPG 
  375   Wed Sep 18 22:30:11 2019 StephenSupplyGeneralEP30-2 Location and StatusHere is a summary of the events of the
last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that
 IMG_5217.JPG 
  376   Wed Sep 18 23:16:06 2019 StephenSupplyGeneralItems staged at 40m Bake Lab for PZT Subassembly BondingThe following items are presently staged
at the 40m Bake Lab (see photo indicating
current location) (noting items broght by
 IMG_5216.JPGIMG_5215.JPG 
  377   Wed Sep 18 23:38:52 2019 StephenGeneralGeneralDirty ABO ready for PZT Subassembly BondingThe 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab,
 index.png 
  379   Tue Sep 24 12:19:20 2019 StephenGeneralGeneral Dirty ABO test run prior to PZT Subassembly Bonding The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab
 image_showing_20190923_abo_qualifying_bake.png 
  380   Thu Sep 26 17:33:52 2019 StephenGeneralGeneralDirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!Follow up on OMC
elog 379

I was able to obtain the following
 image_showing_20190924_abo_qualifying_bake.png 
  382   Tue Oct 22 10:25:01 2019 StephenGeneralGeneralOMC PZT Assy #9 and #10 Production Cure Bake OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started
 OMC_ABO_PZT_Curing_Bake_effort_201906_thru_201909.xlsproduction_cure_bake_pzt_assys_9_and_10_20190927.png 
  383   Tue Oct 22 11:52:53 2019 StephenGeneralGeneralEpoxy Curing Timeline of OMC PZT Assy #9 and #10This post captures the curing timeline
followed by OMC PZT Assys #9 and #10.

Source file posted in case any
 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx 
  384   Tue Oct 22 11:56:09 2019 StephenSupplyGeneralEpoxy Status update as of 22 October 2019The following is the current status of
the epoxies used in assembly of the OMC (excerpt
from C1900052)
 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG 
  387   Fri Dec 13 14:59:18 2019 StephenGeneralGeneralOMC Beam Dump Production Cure Bake[Koji, Jordan, Stephen]

The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned
 IMG_6080.JPGIMG_6079.JPG 
  407   Fri Feb 5 07:40:37 2021 StephenSupplyGeneralOMC Unit 4 Build Machined PartsOMC Unit 4 Build Machined Parts are currently
located in Stephen's office. See image
of large blue box from office, below.
 IMG_8117.JPG 
  411   Wed Jul 7 14:21:50 2021 StephenSupplyGeneralOMC Unit 4 Build Machined PartsMore explicit insights into the inventory
for the Unit 4 build. Image of inventory
included below.
 IMG_9238.JPGIMG_9236.JPG 
  4   Wed Jun 20 20:37:45 2012 ZachOpticsConfigurationTopology / parameter selectionEDIT (ZK): All the plots here were generated  8x 
  5   Thu Jun 21 03:07:27 2012 ZachOpticsConfigurationParameter selection / mode definitionEDIT 2 (ZK): As with the   geom_bowtie.pnggeom_non-bowtie.png 
  6   Fri Jun 29 11:26:04 2012 ZachOpticsCharacterizationRoC measurement setupHere is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method".
 RoC_measurement_setup.pngRoC_measurement_setup.graffle.zip 
  9   Sun Jul 22 15:56:53 2012 ZachOpticsCharacterizationRoC measurement setupHere is a more detailed version of
the setup, so that we can gather the parts
we will need.
 detailed_RoC_setup.pngdetailed_RoC_setup.graffle.zip 
  67   Tue Mar 5 19:37:00 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsEDIT (ZK): Koji points out that (1 -
Ti) should really be the non-resonant reflectivity
of the aligned cavity, which is much closer
 eOMC_visibility_3_4_13.png 
  68   Wed Mar 6 23:24:58 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsI found that, in fact, I had lowered
the modulation depth since when I measured
it to be 0.45 rads --> Psb = 0.1.
 TEK00005.PNGTEK00007.PNGeOMC_visibility_3_4_13.pngeOMC_AMTF_vs_power_3_6_13.png 
  74   Wed Mar 20 09:38:02 2013 ZachOpticsCharacterization[LLO] OMC test bench modified For various reasons, I had to switch
NPROs (from the LightWave 126 to the Innolight
Prometheus).
 new_setup_traced.jpg 
  86   Thu Mar 28 03:37:07 2013 ZachOpticsConfigurationTest setup input optics progress[Lisa, Zach]
Last night (Tuesday), I finished
setting up and aligning most of the input
 OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg 
  87   Fri Mar 29 08:55:00 2013 ZachOpticsConfigurationBeam launched into fiber

    

       
            
  
  94   Thu Apr 4 00:35:42 2013 ZachOpticsConfigurationMMT installed on breadboard, periscope built[Koji, Zach]
 2013-04-03_23.43.00.jpg 
  99   Fri Apr 5 18:18:36 2013 ZachOpticsConfigurationAOM probably broken

    

       
            
 Isomet_1250C_zin_4_5_13.png 
  107   Wed Apr 10 00:40:30 2013 ZachOpticsConfigurationfauxMC locked[Koji, Zach]
 fauxMC_labeled.jpg 