ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
29
|
Tue Oct 16 15:51:01 2012 |
Koji | General | General | Plan Update: October [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
136
|
Mon Jun 3 21:19:03 2013 |
Koji | General | General | Planning | Monday - Evening
(Koji)
[done] - DCPD alignment |
|
395
|
Thu Oct 8 19:55:22 2020 |
Koji | General | Characterization | Power Measurement of Mephisto 800NE 1166A | The output of Mephisto 800NE (former TNI
laser) was measured.
The output power was measured with |
|
227
|
Wed Jul 22 09:43:01 2015 |
Koji | Electronics | AM Stabilized EOM Driver | Power supply test of the EOM/AOM Driver | Serial Number of the unit: S1500117
Tester: Koji Arai |
|
399
|
Fri Nov 6 18:38:00 2020 |
Koji | General | General | Powermeter lent from OMC Lab to 2um ECDL | Thorlabs' powermeter controler +
S401C head was lent from OMC Lab. Returned
to OMC Jul 15, 2022 KA |
|
290
|
Thu Nov 30 12:18:41 2017 |
Stephen | General | General | Preparation for Modal Testing on 4 December | Norna Robertson, Stephen Appert ||
29 Nov 2017, 2 pm to 4 pm ||
227 Downs, CIT |
|
288
|
Fri Sep 8 15:14:05 2017 |
Koji | Facility | General | Preparation for the plumbing work | [Steve, Aaron, Koji]
We've finished the preparation
for the forthcoming plumbing work on (nominally) |
7x |
264
|
Mon Aug 15 10:09:10 2016 |
Koji | General | General | Prev H1 OMC shipped to CIT | Previous H1 OMC shipped from LHO to CIT
https://ics-redux.ligo-la.caltech.edu/JIRA/browse/Shipment-8196 |
|
44
|
Tue Dec 18 20:04:40 2012 |
Koji | Optics | Characterization | Prism Thickness Measurement | The thicknesses of the prism mirrors (A1-A5)
were measured with micrometer thickness gauge.
Since the thickness of the thinner |
|
274
|
Thu Jan 19 20:57:53 2017 |
Koji | Supply | General | Purchase | Ordered:
Office Depot
v AA battery Qty. 24 |
|
275
|
Thu Feb 16 17:23:12 2017 |
Koji | Supply | General | Purchase |
BNC Patch Panel
8x
Amphenol Connex 112443 / Isolated BNC FEMALE
TO FEMALE BULKHEAD ISOLATED ADAPTER - 50 |
|
321
|
Thu Apr 4 20:07:39 2019 |
Koji | Supply | General | Purchase | == Office Depot ==
Really
Useful Box 9L x 6 (delivered) |
|
258
|
Tue Apr 5 18:14:55 2016 |
Koji | General | Loan / Lending | QPD Lending Crackle | Xiaoyue
QPD head
X-Z stage |
|
132
|
Thu May 30 15:00:28 2013 |
Koji | Optics | General | QPD alignment | The QPD alignment was adjusted using
the aligned beam to the cavity and the 4ch
transimpedance amplifier. |
|
133
|
Fri May 31 05:46:54 2013 |
Koji | Optics | General | QPD alignment | Peter F suggested to check the bottom surface
of the PD housings if there is any protrusion/interference/whatever.
And that was true! It was found that |
  |
171
|
Tue Oct 15 18:50:08 2013 |
Koji | Optics | Characterization | QPD alignment | 1) Deburr the bottom surfaces of the QPD
housings
2) Aligned the QPDs |
|
115
|
Wed Apr 17 07:30:04 2013 |
Koji | Optics | General | QPD path glued | Yesterday,
all of the glass components for the QPD path
were glued. |
|
231
|
Mon Aug 10 02:11:47 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | This is an entry for the work on Aug 3rd.
LIGO
DCC E1500151 |
  |
232
|
Mon Aug 10 11:39:40 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Entry for Aug 6th, 2015
I faced with difficulties to operate
the RF AM detectors. |
|
233
|
Mon Aug 10 11:57:17 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Spending some days to figure out how to
program CPLD (Xilinx CoolRunner II XC2C384).
I learned that the JTAG cable which |
|
234
|
Mon Aug 10 12:09:49 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 | Still suffering from a power supply
issue!
I have been tracking the issues |
|
238
|
Fri Aug 28 02:14:53 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement | In order to check the noise level
of the RFAM detector, the power and cross
spectra for the same signal source |
|
240
|
Tue Sep 8 10:55:31 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ 37MHz OCXO AM measurement | Test sheet: https://dcc.ligo.org/LIGO-E1400445
Test Result (S1500114): https://dcc.ligo.org/S1500114 |
|
237
|
Fri Aug 28 01:08:14 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF AM Measurement Unit E1500151 ~ Calibration | Worked on the calibration of the
RF AM Measurement Unit.
The calibration concept is as follows: |
 |
307
|
Wed Aug 29 11:06:30 2018 |
Koji | General | General | RF AM RIN and dBc conversion | 0. If you have an RF signal whose waveform
is , the amplitude is constant and 1. |
|
228
|
Wed Jul 22 10:15:14 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | 7) Make sure the on/off RF button works,
=> OK
8) Make sure the power output doesn't |
|
229
|
Sat Jul 25 17:24:11 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | (Calibration for Attachment 5 corrected
Aug 27, 2015)
Now the test procedure |
7x |
230
|
Tue Jul 28 18:36:50 2015 |
Koji | Electronics | AM Stabilized EOM Driver | RF test of the EOM/AOM Driver S1500117 | Final Test Result of S1500117:
https://dcc.ligo.org/LIGO-S1500117
After some staring the |
  |
41
|
Mon Nov 19 13:33:14 2012 |
Koji | Optics | Characterization | Resuming testing mirror RoCs | In order to resume testing the curvatures
of the mirrors, the same mirror as the previous
one was tested. |
|
22
|
Fri Oct 5 03:39:58 2012 |
Koji | Optics | General | RoC Test setup | Based on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test. |
 |
6
|
Fri Jun 29 11:26:04 2012 |
Zach | Optics | Characterization | RoC measurement setup | Here is the proposed RoC measurement
setup. Koji tells me that this is referred
to as "Anderson's method". |
 |
9
|
Sun Jul 22 15:56:53 2012 |
Zach | Optics | Characterization | RoC measurement setup | Here is a more detailed version of
the setup, so that we can gather the parts
we will need. |
 |
30
|
Wed Oct 17 20:36:04 2012 |
Koji | Optics | General | RoC test cavity locked | The RoC test setup has been built on
the optical table at ATF.
|
  |
16
|
Mon Aug 13 16:59:11 2012 |
Koji | Clean | General | Room Cleaning Log | Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012) |
|
58
|
Tue Jan 22 17:56:32 2013 |
Koji | Mechanics | General | Rotary stage selection | Newport UTR80
Sensitivity: 4 arcsec
|
|
408
|
Thu May 20 17:03:50 2021 |
Koji | General | General | SRS LCR meter SRS720 borrowed from Downs | Item loan: SRS LCR meter SRS720 borrowed
from Downs. The unit is at the 40m right
now for testing with an excelitas PD. Once |
|
423
|
Fri Jul 22 17:41:01 2022 |
Koji | General | General | SRS LCR meter SRS720 returned to Downs | SRS LCR meter SRS720 was returned to Downs
as before.
|
|
370
|
Mon Jul 1 12:49:42 2019 |
Koji | Optics | Characterization | Scattering measurement of A and C mirrors | Liyuan's scattering measurement for
the A and C mirrors. |
 |
451
|
Mon Nov 7 21:16:16 2022 |
Camille | Optics | Configuration | Setting up the fiber couplers | [Camille, Koji]
Began setting up fiber assembly
for OMC testing: |
  |
452
|
Mon Nov 7 22:00:33 2022 |
Koji | Optics | Configuration | Setting up the fiber couplers | Fiber matching: 43.2/56.7 = 76%
S/P-pol ratio 0.7/43.2 = 1.6%
|
|
351
|
Mon Apr 22 09:54:21 2019 |
Joe | General | | Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR | [Koji,Joe,Philip,stephen]
in units 20um per div on the micrometer
[n.b. we reailised that its 10um per div |
 |
36
|
Thu Nov 8 19:47:55 2012 |
Koji | Electronics | Configuration | Solder for PZTs | Rich saids:
I |
|
48
|
Mon Dec 31 03:10:09 2012 |
Koji | Optics | General | SolidWorks model of the OMC breadboard | |
 |
52
|
Sun Jan 6 23:22:21 2013 |
Koji | Mechanics | General | SolidWorks model of the OMC suspension | |
 |
284
|
Sat Jul 1 21:33:18 2017 |
Koji | General | General | Some purchase notes | - Forgot to close the cylinder valve...
v HEPA prefilter (20"x20"x1"
MERV 7) |
|
138
|
Wed Jun 5 18:19:51 2013 |
Koji | General | General | Some recent photos from the OMC final test at CIT | Applying First Contact for the optics cleaning
|
|
213
|
Mon Jul 21 01:02:43 2014 |
Koji | Mechanics | Characterization | Some structual mode analysis | Prisms
Fundamental: 12.3kHz Secondary: 16.9kHz
|
6x |
120
|
Mon May 6 19:31:51 2013 |
Koji | Optics | Characterization | Spot position measurement on the diode mounts | Measurement Order: DCPD2->DCPD1->QPD1->QPD2
DCPD1: 1.50mm+0.085mm => Beam
0.027mm too low |
   |
121
|
Wed May 8 15:08:57 2013 |
Koji | Optics | Characterization | Spot position measurement on the diode mounts | Remeasured the spot positions:
DCPD1: 1.50mm+0.085mm => Beam
0.084mm too high |
   |
158
|
Tue Aug 27 17:02:31 2013 |
Koji | Mechanics | Characterization | Spot position measurement on the diode mounts | After the PZT test, the curved mirrors
were aligned to the cavity again.
In order to check the height of the |
|